Afrikaans
Akan
Albanian
Amharic
Arabic
Armenian
Azerbaijani
Basque
Belarusian
Bemba
Bengali
Bihari
Bosnian
Breton
Bulgarian
Cambodian
Catalan
Cebuano
Cherokee
Chichewa
Chinese (Simplified)
Chinese (Traditional)
Corsican
Croatian
Czech
Danish
Dutch
English
Esperanto
Estonian
Ewe
Faroese
Filipino
Finnish
French
Frisian
Ga
Galician
Georgian
German
Guarani
Gujarati
Haitian Creole
Hausa
Hawaiian
Hebrew
Hindi
Hmong
Hungarian
Icelandic
Igbo
Indonesian
Interlingua
Irish
Italian
Japanese
Javanese
Kannada
Kazakh
Kinyarwanda
Kirundi
Kongo
Korean
Krio (Sierra Leone)
Kurdish
Kurdish (Soranî)
Kyrgyz
Laothian
Latin
Latvian
Lingala
Lithuanian
Lozi
Luganda
Luo
Luxembourgish
Macedonian
Malagasy
Malay
Malayalam
Maltese
Maori
Marathi
Mauritian Creole
Moldavian
Mongolian
Myanmar (Burmese)
Montenegrin
Nepali
Nigerian Pidgin
Northern Sotho
Norwegian
Norwegian (Nynorsk)
Occitan
Oriya
Oromo
Pashto
Persian
Polish
Portuguese (Brazil)
Portuguese (Portugal)
Punjabi
Quechua
Romanian
Romansh
Runyakitara
Russian
Samoan
Scots Gaelic
Serbian
Serbo-Croatian
Sesotho
Setswana
Seychellois Creole
Shona
Sindhi
Sinhalese
Slovak
Slovenian
Somali
Spanish
Spanish (Latin American)
Sundanese
Swahili
Swedish
Tajik
Tamil
Tatar
Telugu
Thai
Tigrinya
Tonga
Tshiluba
Tumbuka
Turkish
Turkmen
Twi
Uighur
Ukrainian
Urdu
Uzbek
Vietnamese
Welsh
Wolof
Xhosa
Yiddish
Yoruba
Zulu
♪ ♪
♪ ♪
NARRATOR: Underneath the streets of London, England,
an army of more than 10,000 workers
has been building a brand-new subway.
(tool whirring)
Okay!
NARRATOR: It's called Crossrail.
We're under a very tight deadline.
NARRATOR: Costing nearly $20 billion,
it's one of the biggest construction projects in Europe.
Give us a shout if that's gonna touch the handrail.
NARRATOR: To complete this super subway,
workers must construct 26 miles of new tunnels
and ten vast new stations...
All right, Jez!
NARRATOR: ...laying more than 30 miles of new track...
It's the most logistically complicated programs of work
I've ever, I've ever been on.
NARRATOR: ...and build 70 super-fast subway trains.
SIMON WRIGHT: It's an absolute intense battle.
NARRATOR: All under a tight deadline.
You need to get out of the way here,
because trains are gonna start coming through.
NARRATOR: It's a trailblazing
construction project in one of the world's
busiest metropolises,
and engineers face a constant battle to keep the city moving.
MAN: Constructing Crossrail is like
undertaking open-heart surgery
on a patient whilst that patient is awake.
NARRATOR: The oldest subway system in the world,
the famed London Underground,
is getting a whole new line.
More than 60 total miles of railroad
in the midst of a city that never stops.
"Inside the London Super Tunnel,"
right now, on "NOVA."
♪ ♪
♪ ♪
♪ ♪
NARRATOR: London, England.
Home to more than nine million people and rising.
The key to keeping everyone moving here is the Tube.
The London Underground is the world's oldest subway system,
a vast subterranean rail network
handling around a billion journeys every year.
It's made up of 11 different railway lines
that snake right underneath the city, allowing passengers
to travel in practically any direction across the capital.
♪ ♪
But the system, which first opened in 1863,
now struggles to cope with peak demand.
(station announcer speaking on P.A.)
NARRATOR: So engineers are building
a brand-new underground railway line
to help relieve the strain.
It will stretch across the city from the west to the east.
It's called Crossrail.
(beeping)
The new railway will run
from Reading and Heathrow Airport in the west
through a new tunnel under Central London,
connecting into existing metro stations.
It will link shopping and theater districts
in the West End
to the new financial district of Canary Wharf
and terminate east of the city center.
It must link seamlessly into the rest of the Tube.
WRIGHT: Crossrail is a huge new railway for London,
so it's going to be able to carry
200 million passengers a year,
ten percent increase in capacity
at a stroke.
Crossrail will help to keep London moving
for the next many, many years.
NARRATOR: The projected cost of the new railway
is nearly $20 billion,
and work is expected to take eight years.
If the project goes according to plan, Heathrow,
Europe's busiest airport, will be just
28 minutes from Central London,
a journey that currently takes almost an hour on the Tube.
Preparation work on this endeavor began in 2009,
launched by Boris Johnson, at the time
mayor of London.
JOHNSON: This is a great day for Britain.
Three, two, one, go!
(machine creaking)
NARRATOR: After three years, engineers were ready
to start boring the railway's titanic tunnels.
Workers used eight giant earth-eating machines
to dig the 26 miles
of tunnels for the trains to pass through.
(man exclaims)
NARRATOR: Excavating 3.7 million tons of earth from under London,
the work was fraught with danger.
Engineers carved their way
beneath fragile historic buildings,
close to skyscrapers,
and under the River Thames.
This part of the project took three years to complete.
But digging beneath a bustling metropolis
isn't the only challenge in building this railroad.
Engineers must also begin
other complex and daunting parts of the project.
They must construct ten grand stations,
design and build
a fleet of 70 super-fast passenger trains,
lay miles of custom-designed railway track,
and develop the software to control train traffic
so that the first passenger services can begin.
(people cheer and applaud)
NARRATOR: As the last tunnel-digging machine
completes its journey...
Welcome to Farringdon!
NARRATOR: ...it's at this construction site
that engineers are gearing up to build what will be
one of the most impressive stations on the entire line:
Farringdon Station.
Located in the heart of Central London,
Farringdon is home to Smithfield Market,
the largest meat market in the country,
and the city's
world-famous diamond quarter,
Hatton Garden.
Once complete,
Farringdon Station is set to become
one of Britain's busiest train stations,
servicing over 150,000 passengers a day.
Every day, I bounce out of bed
ready to come here and come to work
and feeling great about it.
NARRATOR: Project manager Linda Miller faces
the mammoth task of making sure its gates open on time.
MILLER: This station is really
gonna be where the action starts when the railway opens.
If you were to take the Shard,
which is the tallest skyscraper in Europe
right now, and lay it on its side, it would fit inside
of my Farringdon Station.
We're enormous in scale.
Our platforms are over 300 meters long.
What that means in the future,
if you're stepping off the trains at Farringdon,
you need to know which way you're going,
'cause if you walk in the wrong direction,
you're gonna be half a kilometer from where you wished you were.
♪ ♪
NARRATOR: Linda is no stranger to challenges like this.
A former U.S. Army pilot and paratrooper,
Linda trained in engineering and helped build
NASA's Launch Complex 40
at Cape Canaveral in Florida.
But constructing Farringdon's
$918 million station will be one of her biggest tests to date.
MILLER: Looks great-- afternoon, guys.
NARRATOR: Linda's team's first task is to dig out
two huge, eight-story-deep holes.
These will form the east and west concourses at Farringdon.
Underground, they must widen the freshly dug railway tunnels
to create its platforms,
then dig out the passageways and escalator shafts
to link them to the concourses and entrances.
Excavating the earth to build the platforms is treacherous.
Minor geological fault lines run through the site
and an ancient river once flowed through here,
leaving the earth pitted
with unstable pockets of sand and water.
The threat of groundwater running through these faults
and into the tunnels is great,
so they must stay vigilant
as they dig through these zones.
MILLER: So this is what we've got.
Here's a bird's eye view looking down on the station.
We're facing the most dangerous type of soil.
There's not one but three different fault lines
right through the middle of our work.
Fault lines present a danger.
MILLER: It provides a pathway where you could have cracks,
where you could have future flooding.
NARRATOR: They use excavators to widen the train tunnels
to create the platforms, carefully clawing out the earth.
MILLER: The team are digging out a mountain out from
under London.
Simultaneously with the dragging away of that soil
is the spraying of concrete on that face,
so that the face doesn't fall in on you.
All right, Jez!
MILLER: As it flies towards the wall under pressure,
it's dry, just barely,
smack at the time it hits the wall.
(sprayer whirring)
The mining is going well, but we're never complacent.
We never say, "Oh, yeah, we're, we,
we're all that good,"
because that's the day it goes wrong.
NARRATOR: Once set, they line the platform walls
with a plastic membrane to keep them dry.
MILLER: The membrane is fully waterproof, tough, durable,
and is going to form a seal around
our entire tunnel.
We are going to be wrapped like a Christmas present.
NARRATOR: With the platforms dug out and sealed here,
the team at Farringdon now faces their next challenge.
To connect the stations together,
builders across the line must lay more than 30 miles
of brand-new rail track.
But space on site is at a premium,
and installing Crossrail's track at Farringdon
without disrupting other work will be no easy feat.
Gregg Purcell leads the team
responsible for laying the track through this zone.
It's not often you get to work on a project
of this magnitude.
It's amongst the most logistically complicated
programs of work I've ever, I've ever been on in my career.
NARRATOR: Workers here will need highly specialized machinery
for the task at hand.
PURCELL: This machine is called the multi-purpose gantry.
There's four of these on Crossrail,
and they're worth about a million pounds each.
Looks like a Transformer,
and it can change its shape depending on
what condition it's working in.
NARRATOR: This mechanical marvel can lay
nearly 2,000 feet of railway ties
every day.
PURCELL: The multi-purpose gantries are a godsend,
and I would struggle
to understand how we build a project like this
without that sort of kit.
NARRATOR: Once the trains start running,
these tunnels will be noisy, but right here,
the project faces one of its most difficult
construction challenges.
The team needs to reduce the amount of noise
coming from this section of track.
PURCELL: Here we are directly beneath the Barbican.
Right directly beneath.
(Beethoven's Ninth Symphony playing)
NARRATOR: Opened in 1982, the Barbican Centre
is an international hub for arts and culture,
London's equivalent of Carnegie Hall.
The center's largest venue, Barbican Hall,
sits one story below ground.
HUW HUMPHREYS: The Barbican Centre's
the home of the London Symphony Orchestra,
presents regular seasons
from the Royal Shakespeare Company.
It really is one of the truly
great artistic centers in the U.K.
A lot of music is about exploring the relationship
between the very quietest sounds and silence,
and therefore a lot of performances
really focus on that magical area of audibility.
NARRATOR: And that's the problem.
Barbican Hall sits just 55 feet above Crossrail's tunnels.
Noise or vibrations from trains could travel through the earth
and into the concert hall, disturbing performances.
To guard against this,
Crossrail engineers are using ingenious floating tracks,
unique concrete slabs of rail track
that sit on special springs.
As a train passes over these springs,
they should absorb most of the energy
and reduce noise reaching the theater.
PURCELL: The floating track slab allows that noise
to be brought down even lower,
that on the surface,
you won't hear anything when you're watching "Hamlet."
NARRATOR: It takes over 150 tons of concrete
reinforced with steel bars
to form each 100-foot-long floating track slab.
So what you can see behind you now
is all the guys assembling the track.
We've got all the reinforcements complete.
The spring housings are all installed.
We got all the rail, and this slab is being set up
to cast the concrete on top.
Are we there, Steve?
Yeah, it's here now.
♪ ♪
PURCELL: There we go.
So that's the liquid gold
coming out there.
♪ ♪
NARRATOR: Once set,
they screw the springs into place
on the underside of the slab
and raise it to its final height.
With the slabs now cushioned by the springs,
they can set the rails on top.
With this crucial section of the railway in place,
the team can pick up the pace
and lay track throughout the rest of the tunnels.
♪ ♪
Over in London's West End,
the city's bustling theater district,
engineers are excavating huge holes in the ground
to construct another new Crossrail station:
Tottenham Court Road.
And it's a challenging one,
because they're doing it here,
in the middle of Oxford Street,
the epicenter of shopping in Britain.
With 200 million visitors every year,
it's one of the busiest shopping streets in Europe,
home to the famous Selfridges department store.
David Crabtree leads the team of engineers
racing to build Tottenham Court Road's massive new concourse.
CRABTREE: Our station is about the size of an aircraft carrier,
so if you consider constructing an aircraft carrier
in the middle of London, underground,
whilst keeping London going, with all its myriad of people
and vehicle movements all sloshing about,
that's what we've got to do at Tottenham Court Road.
NARRATOR: To build the new station here,
David's team excavates two huge holes
to create the concourses, a hundred feet deep
and 1,300 feet apart,
removing enough earth to fill 14 Olympic swimming pools.
The concourses will plug
directly into the train tunnels below
and the existing London Underground Tube services.
Digging vast holes like these in Central London
is no simple task.
The earth around the edge of the holes is fragile
and could fall in,
causing the surrounding shops and buildings to collapse.
So as the team digs down level by level,
they install 40 massive props to hold back the earth
as they build the station's walls.
Now, with the walls complete,
they face the nerve-racking task
of dismantling and removing the props.
CRABTREE: So you can see here, it leaves us a nice, big open space,
so we've had to put all these props in place.
However, now we need to get them out,
which is gonna be an even bigger challenge.
This is engineering on a very big scale.
NARRATOR: Each 115-foot-long prop helps to hold back the weight
of more than 1,500 tons of earth.
Then, as they remove the props,
the newly built walls should be strong enough
to resist the pressure.
CRABTREE: We're about to start removing our
first big prop, and this is,
this is one of the moments that we all
hold our breath.
NARRATOR: With support chains
attached to the first prop...
GAVIN HUGHES: Come up a touch-- that's it, lovely.
NARRATOR: ...they use a mix of oxygen and propane heated to over
4,500 degrees Fahrenheit
to cut out small squares in the metal.
HUGHES: They cut windows out of it,
a section at a time, just to release the pressure.
NARRATOR: The more holes they cut, the weaker this prop becomes.
They hold their breath and hope
that neither the prop nor walls buckle.
HUGHES: We're just at the last stage of cutting
the final piece now.
You'll just see a slight bow in the steel,
where all the pressure's on the smaller area,
which is what it's meant to do.
It's meant to take the pressure out of it as we're cutting it.
NARRATOR: Guiding the pieces of the prop up out of the hole,
through this maze of metal, will take great skill and control.
Nice and easy now, nice and easy.
MAN: Hold her there one second, hold her there.
Just up on your hoist now, up on your hoist.
(whistle blows) And up you go,
all clear, up you go.
(whistle blows)
Keep hoisting up.
NARRATOR: After six hours,
the first prop is clear.
(whistle blows)
It takes a further six months to remove all 40 props.
And with the space cleared,
they work through the night to seal
the building and pour the concourse's
reinforced concrete roof.
MAN: Thank you, cheers.
NARRATOR: Only when the concrete has set can they begin
the next stage of the work here,
to finish the interiors of this colossal station.
♪ ♪
Back in Farringdon...
(car horn honks)
...with platforms starting
to take shape and rail tracks laid,
Linda's team now faces a race to complete
Farringdon Station's grand entrance hall,
which has a vast and intricately designed roof.
The building must connect
directly into a neighboring commuter train station.
To build its spectacular roof,
Linda's team must piece together
105 custom-made reinforced concrete segments.
This will be like assembling a giant jigsaw.
42 concrete-coated steel beams
will form the diamond-shaped frames.
63 concrete panels will sit inside.
Craning these awkward-shaped pieces into position
without crashing into the busy train station next door
will test the team's ability.
MILLER: Plugging into a live
railway station has its whole set of, of new challenges.
This is the last big part of the build, and it's gonna be tough.
NARRATOR: Site manager Andy Scholes
is working with Linda on this tricky build.
SCHOLES: This is our main feature of Farringdon Station.
This is what everyone will see
over the next 120 year
when they enter Farringdon Station.
The pressure is on in order to get this right the first time.
NARRATOR: First task: erect a network of steel supports
to prop up the heavy ceiling
as they lock it together.
To get all the pieces
of this concrete puzzle in the right place,
Andy follows his installation drawings closely.
What we have here is the plan of the ceiling itself.
Each piece is individually named and numbered,
so we know where we're gonna lift them to.
If we lose the drawing, then we're, we're stuffed, basically.
Pinch up nice and easy.
NARRATOR: The beams that make up
the diamond-shaped frames weigh over eight tons.
(man speaking on radio)
NARRATOR: Lowering them into position,
right next to the operational commuter train station,
takes a delicate touch.
Keep coming down.
(whistle blowing)
SCHOLES: Yep, very close.
They're moving it now to get it into position.
Yeah, down on that!
♪ ♪
SCHOLES: Touchdown.
NARRATOR: With the ceiling's frame in place, they can now slot
in the diamond-shaped panels.
Pinch up nice and easy.
♪ ♪
(radio chirps) That's it, mate, all clear.
NARRATOR: Andy and the team must work fast
if the station build is to remain on schedule
and avoid causing a cascade of delays.
Farther east, builders are starting work
on another logistically complex station build.
Whitechapel is the historic home of the foundry
that cast the Big Ben bell
and a market which has served locals
for more than a century.
One of Crossrail's ten Central London stations
will sit in this district,
but the station here won't be completely new.
Instead, engineers are undertaking
a $143 million overhaul
of Whitechapel's existing Tube station,
opened in 1876.
All right, I'm out, mate. (laughs)
NARRATOR: 76-year-old Jim Forrest manages the team
tasked with building the new station here.
I've worked in construction since 1960.
I've worked on the Humber Bridge.
I worked on 1,000-foot concrete chimneys,
nuclear power stations, coal power stations-- you name it.
But this is the highlight,
what I'm doing now.
NARRATOR: Whitechapel is one of the most confined construction sites
along the entire Crossrail line.
Market stalls, roads, and residential buildings
hem the site in.
Squeezing a conventional station
into such a chaotic space is impossible.
So engineers must build the new concourse
on a unique 590-foot-long bridge
that passes right over the site.
This station will run north to south,
connecting to the Crossrail tunnels,
channeling passengers to existing train lines.
A skeleton of around 6,500 pieces of steel
will form its frame.
This will allow the station bridge
to sit on the surrounding Victorian structures,
giving the impression that it floats above the existing lines.
352 panes of glass will allow light
to stream through the structure.
A steel and aluminum fire-proof roof covers the concourse,
with greenery to top it off,
giving this 19th-century station a 21st-century makeover.
Jim's team starts assembling the giant steel pieces
that will make up Whitechapel's new floating bridge station.
FORREST: Make sure them flanges don't bite into the tarmac.
NARRATOR: They plan to use a tall crane to swing each piece
into position over the existing train tracks here.
The line below is closed for today's operation,
but must reopen in less than 48 hours,
ready for Monday morning's rush hour.
Jim needs everything to run like clockwork
if he's to avoid travel chaos.
This is a difficult operation to carry out,
because the, the alignment has gotta be precise.
NARRATOR: One of the largest sections of bridge
is now ready to lift.
FORREST: I can hear the tension
coming into the slings and shackles now.
(metal creaking)
NARRATOR: It takes great skill to carefully steer
this 40-ton chunk of steel away from the buildings
and down towards the railway tracks.
♪ ♪
MAN (on radio): Keep coming down.
Another little flick to your left for me.
Right, that's nice like that.
FORREST: So far, so good.
NARRATOR: This section must slot into an 82-foot-long gap.
It's going to be tight.
MAN (on radio): Go to your left a bit more, mate.
(continues speaking on radio)
(metal creaking)
(alarm sounding)
All stop there for me a minute.
All stop there.
NARRATOR: Just as they near the drop zone,
they hit a glitch. MAN (on radio): Hit the handrail.
FORREST: What do you need to do? Take a foot out of it?
Okay.
It's such a tight fit with the handrails,
that to get the unit in,
they've got to cut a small gap in the handrails.
NARRATOR: They must act fast.
A hold-up here
could stop rush-hour trains running tomorrow.
Right, how's that looking on that handrail now?
MAN 2: That looks pretty sleek.
Right, we're having him come down, yeah?
MAN 3: I'm ready.
You ready, Adam, you all right?
Get ready!
MAN (on radio): Yeah, start bringing her down slowly, then.
Give us a shout if that's gonna touch that handrail.
MAN (on radio): All right, Dave, inch to go.
MAN: Right, that's us... in.
FORREST: You're looking at a very happy chappy.
Yeah, it's gone really well, that.
NARRATOR: With this giant steel section now in position,
it takes around a year
to install all of the 6,500 pieces.
Though the steel skeleton is a huge milestone,
they still need to construct
the walls, roof, and interiors
if this station is going to be ready for opening.
Workers across the line are making progress.
They install wall cladding,
huge ventilation fans,
and miles of cabling to give the stations power.
(exclaiming)
NARRATOR: Engineers have also started work
on building another key element of the railway: its trains.
The railway's 70 new super-fast trains
will each carry up to 1,500 passengers
and come with air conditioning and Wi-Fi onboard.
We can build all the stations and track you like,
but trains have to be there, as well.
NARRATOR: The $1.4 billion contract
to design and build Crossrail's rolling stock
has been awarded to the owners
of this historic train factory in Derby,
114 miles north of London.
Workers have been building trains on this site
for more than 140 years.
But constructing the Crossrail fleet will
really test the mettle of these seasoned train builders.
It's a massive challenge, going from
effectively a blank sheet of paper
to ramping up to producing a whole fleet of trains.
It's a huge task.
MAN: And so you can see that
there's a tiny gap there.
Yup.
NARRATOR: They have just 24 months
to design, build, test,
and deliver the first of 70 new trains--
a tall order.
Faster.
NARRATOR: Capable of traveling at speeds of 90 miles per hour,
each passenger train will be over 650 feet long--
almost the length of seven basketball courts.
The team is designing their floors, walls, and roofs
to be made from aluminum.
They must be compact to squeeze through the tunnels,
but big enough on the inside
to accommodate up to 1,500 passengers.
The trains need full air conditioning
and live passenger information boards.
The stakes are high.
What time are the covers coming?
NARRATOR: It's up to 24-year-old Kane Jellyman
to keep this $1.4 billion train build on track.
JELLYMAN: These are the largest-length trains
we've actually produced on the site,
and the largest-length trains you'll probably see
on London Underground for a long while.
There's five key steps into
making it look like an actual train.
The underframe comes in, which is like the floor.
The roof is loaded into the jigs.
Followed by that, we bring the body sides in.
(whirring)
It's called the tubing process,
'cause this is where the shape of the vehicle actually
comes together, and it looks very much like a tube.
NARRATOR: With the roof, floor, and sides of this car in place,
it's time to attach the driver's cab.
Okay, it's on the way.
NARRATOR: This cab unit weighs over three tons
and contains more than $325,000 worth of crucial electronics.
The electronics control everything,
from the train's speed
to the passenger doors and lighting.
A dent could wreck its intricate components
and set the train-building schedule back.
Okay, just a box behind you there.
JELLYMAN: We don't have excess cabs in stock,
so he needs to make sure he doesn't scratch it.
Do you want us to help you guide it in, Kels?
Trying to let him concentrate
so he doesn't make any mistakes.
JELLYMAN: Keep coming.
Whoa.
There's a lot of money being craned there, so...
God forbid if something did happen.
Couple of clicks east.
Here you go.
(crane whirring)
(clangs)
JELLYMAN: Nice landing.
NARRATOR: The trains must pass
a series of rigorous trials
before they can go into operation,
from winter weather tests
freezing them to -13 degrees Fahrenheit
to speed and performance trials.
♪ ♪
JELLYMAN: We can't be complacent.
This is just the start.
We've got over 500 cars left to deliver,
so the guys need to keep working hard
and carry on delivering them.
♪ ♪
NARRATOR: Across London,
stations are fitted with ticket gates, lighting,
and escalators.
Here at Crossrail's new Bond Street Station,
in London's luxury retail quarter,
builders are installing
the longest escalators on the line.
(tools whirring)
Delays in tunneling
and mechanical and electrical work
has pushed this station build
$715 million over budget
and many months behind schedule.
As workers here pick up the pace,
builders at Tottenham Court Road Station
have completed work on its concrete roof.
LIH-LING HIGHE: You installing some signage, Mark?
(inaudible)
When's it going in?
NARRATOR: Project manager Lih-Ling Highe
now leads the station's interior finishing work.
This is the time when we are
turning empty structures and empty tunnels
into living, breathing buildings with lighting,
with cladding, with fixtures, with fittings.
Being a project manager of a station
on such a complex project
is a bit like holding onto 400 spinning plates
and making sure they're delivered
in exactly the right place, whilst riding a unicycle
crossing on a tightrope.
NARRATOR: Today, Lih-Ling's team
is waiting for a construction train
to deliver the station's platform screen doors.
HIGHE: It's really important to get the platform screen doors in,
because without the platform screen doors,
we're not going to be able to open the station.
NARRATOR: Engineers must install two-and-a-half miles
of floor-to-ceiling platform screens
in eight new stations.
The screens stop passengers falling onto the line
and maintain air flow around the station.
Each screen unit is made from bombproof glass
and has a straight edge.
But Tottenham Court Road's eastbound platform
is a 768-foot-long curve, shaped to avoid hitting
a subterranean maze of sewers, foundations,
and other rail lines.
So Lih-Ling's team is relying on a construction train
equipped with special robotic arms
to carefully lift and connect each screen
at a 0.4-degree angle from one another.
If the angle is off, the screen could jut out
and collide with an oncoming train.
They must fight for every inch of space.
The more screens they install,
the tighter their worksite becomes.
Lead engineer Frank Foley is in charge of
installing the platform screen doors on site.
(tool whirring)
FOLEY: The first step is for the train to be carefully aligned
in the correct spot
to start unloading the first module,
to lift the module off the back of the train,
and align it accurately with the brackets
that are already installed on the platform.
Ready?
NARRATOR: Using a remote control,
workers carefully guide the train's robotic arms
to move each screen into position.
MAN: All right, coming down.
Go right a touch.
Okay, all in.
FOLEY: It's that nail-biting time when they find out if
the brackets are in the right place or not.
MAN: Now go back a touch.
NARRATOR: Lining up each screen,
weighing the equivalent of a pick-up truck,
with its brackets takes a delicate touch.
MAN: Yeah, that's good, yeah.
It's a bit fiddly with the spanners to, uh, to do.
They do have to be careful when they're installing the doors.
MAN: Okay, all good.
FOLEY: Now, that's the first one done. (train horn beeps)
So we've still got a long way to go.
NARRATOR: Over the next nine weeks,
Frank's team races
to install the remaining 137 screens.
(train horn beeps)
♪ ♪
(train horn beeps)
The closer they get to the end of the curved platform,
the tighter the space becomes for the crew.
Excuse me, watch your back, please.
Come in, come in, come in, come in, come in, come in.
Now, hold, hold on,
you have to keep, really hold the pressure.
Stop for a minute, yeah?
NARRATOR: Everyone's feeling the pressure.
MAN: Do not leave it on the wood, right, because if you break it,
we're not gonna get any more for weeks. (train horn beeps)
See this metal? Yeah.
That's what you need to put on the floor,
so you need to turn it so it goes like that
and then lift it up, right?
Just because
I don't want the glass touching the floor.
MAN: Uh-oh. MAN 2: Let go, let go.
MAN: All mine, all mine, all mine, all mine.
MAN: This glass needs to come up this way.
Oh-- how is it?
The tower, bring it closer.
Right, going back now, bring the tower.
It's the very last piece now.
(train horn beeps)
(people talking, radio running in background)
You have one bolt in.
That's it, all done.
NARRATOR: The doors are finally in,
but six weeks later than originally planned.
♪ ♪
By the summer of 2018,
delays completing the intricate station construction
and tunnel-finishing work
impact the testing of the railway,
so more time and money will be needed.
Afternoon, Franz, afternoon.
NARRATOR: After seven years,
work at Farringdon Station is progressing,
and Linda can get her first glimpse of its grand entrance.
Wow, wow, wow, wow!
♪ ♪
That looks fantastic.
♪ ♪
It's like when you walk into a cathedral.
It is a relief,
to, to finish the last of the big builds on site.
I suppose it's a little sad, too,
as, as it is whenever you, you accomplish something
that, that feels great.
They say diamonds are forever,
but these diamonds are meant for 120 years, at least.
NARRATOR: Finishing work ramps up across the line,
and by 2021,
stations are slowly starting to complete,
including Farringdon Station,
Lih-Ling's Tottenham Court Road Station...
HIGHE: This is a huge milestone.
We can see the finishing posts.
NARRATOR: ...and Jim Forrest's floating station at Whitechapel.
FORREST: This is a landmark for us,
and it demonstrates to everybody here
that we are capable of delivering this station
as we said we would do.
NARRATOR: But the formidable scale of this engineering endeavor
has pushed the project more than four years past
its scheduled opening date.
The cost of the project has also spiraled
to nearly $25 billion.
As work on the tunnels, platforms,
stations, and trains completes,
one area of the railway
that is still being tested is its software.
Crossrail will be the first fully digital railway
in the U.K.
It has one of the most complex systems
of rail software in the world,
to control everything from the trains and signals
to CCTV and platform doors.
Yeah, on the screen right here...
NARRATOR: The person responsible for
ironing out any bugs in the software
is Pradeep Vasudev.
Pradeep has nearly 40 years' experience
developing computer software for transport systems,
from Tube lines to military aircraft.
Crossrail has built this $13 million facility,
where his team has spent more than three years
testing out the software using virtual trains
on virtual tracks.
VASUDEV: My interest is making sure
all the bits work together.
For me, finding any issues
early on is absolutely the thing we need to do.
There's nothing worse than finding it out on the railway.
NARRATOR: Their job is to push the new software to the limit,
seeing how platform doors perform
and discovering how the trains cope with errors.
Each version can have
as many as 250 bugs that need to be
rooted out and fixed.
Jim, if you can start driving the train?
♪ ♪
NARRATOR: Today,
nearly 13 years after construction work first began
on the project,
the team is finally ready to conduct
a full live trial of the railway.
This is a critical moment.
They aim to run the intended timetable service
of 24 trains per hour.
VASUDEV: Today we're trying to prove that we can run
a sustainable, consistent service
at 24 trains per hour.
That is the ultimate timetable
that we want to run for Crossrail.
We've got to a point now where we're confident
that system technically can achieve it.
Everything has to work perfectly.
NARRATOR: With only two-and-a-half-minute gaps in between trains,
running a fault-free service to time will be a challenge.
To do this, they will need to use
a radical new feature called auto reverse.
During rush hour, trains sometimes need to
switch direction to relieve the busy central stations.
To avoid the driver having to walk 650 feet
to the cab at the other end, wasting valuable minutes,
these trains have a much quicker solution.
When they need to do a fast turnaround
to head back into the West End from Paddington Station,
the driver activates an auto reverse feature
that allows the train to drive itself.
In this mode, when the computer takes over,
it swaps tracks and changes direction.
As it moves back into the tunnels,
the driver is free to walk to the cab
at the other end of the train.
Auto reverse is key to the railway
hitting its 24-train-per-hour target.
The early tests of its software demonstrated that it was safe,
but its real-life performance has been far from reliable.
VASUDEV: Auto reverse is absolutely crucial
in our ability to run a 24-train-per-hour service.
Without it, we would struggle
to run a consistent service at that level.
NARRATOR: Assisting Pradeep in the railway's control room
is systems integration manager Rory Mitchell.
MITCHELL: The main thing that we've not
tested before, at scale, is having trains
every two-and-a-half minutes in the whole tunnel section.
So it's difficult to predict what might go wrong.
♪ ♪
NARRATOR: In West London, driver Emma Knowles
will be at the controls of one of the trains.
Okay.
KNOWLES: At 24 trains per hour,
this, this is a biggie today,
but it's going to be fine.
It's all going to work.
(P.A. system beeps)
TRAIN ANNOUNCER: This is the TFL rail service to Paddington.
NARRATOR: Any software bugs
on the trains, tracks, or station platforms
during this trial could trigger serious delays
across London's commuter network.
And they're off.
KNOWLES: We're off, we're moving.
NARRATOR: The team feeds
more trains onto the line,
all heading towards the new Underground stations.
On the platform at Paddington Station
in West London,
engineers must make sure that the railway's display boards
are providing accurate information.
PAUL NAYLOR: So we've got a train arrived.
It wasn't due to arrive here now,
so we need to check why that train turned up
and isn't being shown on these screens.
Clearly, we want it to be right
for our passengers when they board the trains.
♪ ♪
This train has arrived
showing "not in service,"
whereas we would normally expect it to show
"terminates here."
As you can see,
we're down into the fairly small-scale issues
that we're trying to deal with now.
NARRATOR: The display board faults
are yet more glitches for the software team
to iron out before the line can open.
Meanwhile, on the tracks...
TRAIN ANNOUNCER: This is the TFL rail service to Paddington.
NARRATOR: ...Emma pulls into Paddington.
KNOWLES: Here we go.
NARRATOR: Here, she will attempt to
put the train into auto reverse:
to turn it around
and travel back in the opposite direction.
Is everybody off that needs to be off?
'Cause I'm closing the doors now.
Right, auto reverse.
Auto reverse.
NARRATOR: With auto reverse activated,
Emma's train should now automatically move
forward around a mile
to change tracks, stop, switch direction,
and head back east into the tunnels.
KNOWLES: So, as we come out,
we're going to come out into daylight,
to Westbourne Park sidings,
and it's: safety,
check there's no trespassers.
If there is a trespasser,
emergency stop.
NARRATOR: For those used to driving trains manually,
the auto mode takes some getting used to.
That's scary.
No driver!
That is so scary!
Mild heart attack.
(shudders)
♪ ♪
It's a very, very...
It's a very strange feeling that...
I'm meant to be driving it.
And we're on our way to Stratford.
The train is driving itself, modern technology.
NARRATOR: The auto reverse software on this train
has worked perfectly,
and allows Emma to begin her route east along the line.
Meanwhile, at Paddington,
engineers are still troubleshooting problems.
DAVE: Is Stratford open now, Paul?
Yeah. Yeah?
Yeah.
NARRATOR: They've noticed that
when a train returns from
completing an auto reverse maneuver,
the platform screen doors aren't opening properly.
♪ ♪
(doors beeping) That didn't work, did it?
So all right, that's another one to note.
We're not sure why that didn't work,
but it didn't work.
They should all open completely.
So, I think...
There you go, see?
That's the door glitch.
We need to fix it.
And we will fix it.
NARRATOR: While the team deals with
door problems in West London...
MITCHELL: I think we might have an issue with the trains.
NARRATOR: ...the control room is witnessing a train jam
in Stratford, East London.
MITCHELL: We've now got four trains
queuing up to get into Stratford,
which is not going to rectify quickly.
And then we've got delays on about half of the trains.
I didn't think it would be this bad.
(watch ticking)
NARRATOR: To add to their problems,
another train has become stuck at Paddington.
(exhales, murmurs)
MITCHELL: The train at Paddington
has got quite a major failure.
The guys have been trying to reset it,
so, we're, we're a bit stuck.
(chuckling): We've got 12 trains
between Tottenham Court Road and Westbourne Park.
(watch ticking, people talking in background)
NARRATOR: It's now up to the signalers to coordinate the trains
to clear the gridlock
and reboot the railway's software.
(watch ticking)
MAN: Let's get it east to Farringdon
and try to change ends... Yeah, yeah, yeah.
...and see if we can clear enough to...
Yeah, at least we'll create some space.
Yeah, yeah, yeah, yeah.
NARRATOR: After nearly four hours of
trying to reboot the software,
and multiple attempts to untangle the fleet...
Are you calling it, Paul?
NARRATOR: ...the team is forced to abort the test.
(people talking in background)
MITCHELL: The system is brilliant at
managing a steady state,
and it's actually really good at managing,
like, partial degradation when you've got minor delays,
but when it gets to such a bad situation,
and you've got a train that's blocking the line,
there's not much it can do-- it can't...
It can't teleport trains around a blockage.
Because we had so many delays, we had to suspend the service
and park all the trains up in the depots.
NARRATOR: The team didn't make
its 24-trains-per-hour target today.
And there are still more glitches to fix.
♪ ♪
It's unfortunate, but, but it's, it's our baby,
and we've got to deal with it.
NARRATOR: Over the next four months,
Pradeep's team continues to test
and develop the software.
♪ ♪
In May 2022,
a very special visitor arrives
to give the finished railway a royal seal of approval--
Her Majesty Queen Elizabeth II,
in one of her final public appearances.
ANDY BYFORD: I would like to thank Her Majesty the Queen
for gracing us with her presence here today.
♪ ♪
NARRATOR: The new railway is now known as
the Elizabeth Line.
A week later,
crowds gather to be the first to travel
on the new Elizabeth Line trains.
This is a bit of history in the making, isn't it? Exactly.
This is really a game-changer.
NARRATOR: Over two million people use the new line
in the first week,
helping to take the strain off London's packed Tube lines.
MARK WILD: It's been a real effort.
I'm so proud of the whole team
that pulled together to make this happen.
♪ ♪
MILLER: I think in 100 years' time,
people will look back at Crossrail
and they will see what courage it took.
Future engineers, future British citizens
will say, "This is awesome.
"This is an amazing project
"that, that is for the benefit
of everyone in this region."
NARRATOR: It's taken 13 years,
almost $25 billion,
and the determination of 75,000 workers
to finally complete the largest
and one of the most ambitious rail projects in the world.
♪ ♪
♪ ♪