00:00:00,000 --> 00:00:16,000
Hello and welcome to this DEMPLAN tutorial. Today I will show you how to set up equipotential bonding areas in DEMPLAN.
2
00:00:16,000 --> 00:00:21,000
You can use them, for example, to simulate multiple floors in a tall building.
3
00:00:22,000 --> 00:00:33,000
To this end, I have already prepared a building with a height of 20.5 m and an earth termination system as per DIN 18014.
4
00:00:33,000 --> 00:00:43,000
The easiest way to create a potential area is to create a ceiling area in the model and later designate it as an equipotential bonding area.
5
00:00:43,000 --> 00:00:51,000
To do this, we select floor plan in the toolbox, then ceiling and use the outline tracing.
6
00:00:51,000 --> 00:00:56,000
We add a ceiling to the floor slab, which we can then duplicate.
7
00:00:56,000 --> 00:01:00,000
For easier editing, we switch to the side view.
8
00:01:00,000 --> 00:01:05,000
Right-clicking on a ceiling opens the copy command.
9
00:01:05,000 --> 00:01:17,000
We place the ceiling there, where we want to have the equipotential bonding areas.
10
00:01:17,000 --> 00:01:23,000
The elevation can be adjusted in the properties windows on the left.
11
00:01:23,000 --> 00:01:43,000
Let's, for example, select the heights 5, 10, 15 and 20 m.
12
00:01:43,000 --> 00:01:52,000
When setting the height, the test joint height must be taken into account so that the separation point is not above the building.
13
00:01:52,000 --> 00:02:04,000
If, as in this example, we want to depict an equipotential bonding area half a meter below the roof surface, the test joint should be smaller than 50 cm.
14
00:02:04,000 --> 00:02:10,000
We can check the height of the joint by going to the lightning protection options.
15
00:02:10,000 --> 00:02:15,000
We can see the distances in the general tab under distances.
16
00:02:15,000 --> 00:02:22,000
Let's change the 80 cm set here to 30 cm for our examples.
17
00:02:22,000 --> 00:02:30,000
Now we select the ceiling with a right-click and assign equipotential bonding level.
18
00:02:30,000 --> 00:02:37,000
Then we right-click on the ceiling a second time and select equipotential level again.
19
00:02:37,000 --> 00:02:43,000
A window opens where I can make the settings for the equipotential bonding area.
20
00:02:43,000 --> 00:02:50,000
You can choose whether to add a test joint or an earthing bar in the general settings.
21
00:02:50,000 --> 00:02:56,000
The mesh size for the equipotential bonding area can be selected under options.
22
00:02:56,000 --> 00:03:02,000
We recommend a mesh size of 5 by 5 m. This is the default setting.
23
00:03:03,000 --> 00:03:15,000
However, it is possible to adjust these values as well as the material and type to meet your own requirements in the same way as we do it when creating an earth termination system.
24
00:03:15,000 --> 00:03:22,000
Special attention should be paid to the reference for separation distance calculation options and the note there.
25
00:03:22,000 --> 00:03:32,000
If this option is selected, the level is set to zero regardless of whether it is connected to an earth termination system in the program or not.
26
00:03:32,000 --> 00:03:40,000
The normative requirements as described must therefore be taken into account if this option is to be used.
27
00:03:40,000 --> 00:03:46,000
We complete the assignment of equipotential bonding areas for the remaining ceiling slabs.
28
00:03:52,000 --> 00:04:06,000
In this case, we can delete the boding ceiling slab.
29
00:04:06,000 --> 00:04:14,000
If we hide the building and ceilings, we see the insurgent lightning protection material.
30
00:04:14,000 --> 00:04:26,000
Next, we change to the isometric view and put a mesh on the roof.
31
00:04:26,000 --> 00:04:37,000
To connect the mesh and the equipotential bonding area, we select the icon Add Mesh Down Conductor and determine the position of the down conductor.
32
00:04:37,000 --> 00:04:42,000
The green area determines how far the down conductor is routed.
33
00:04:42,000 --> 00:04:50,000
We can have it terminate at an equipotential level or the earth termination system.
34
00:04:50,000 --> 00:04:58,000
A window opens where we can select whether or not all relevant equipotential bonding areas should be connected.
35
00:04:58,000 --> 00:05:18,000
If we press Yes, we see that the equipotential bonding areas above the endpoint have been taken into account.
36
00:05:18,000 --> 00:05:34,000
To see this better, we hide the building parts again and perform a separation distance calculation.
37
00:05:34,000 --> 00:05:43,000
We see the current distribution for each floor and the different sizes of the separation volume cylinders.
38
00:05:43,000 --> 00:05:48,000
You can find more tutorials and news about DEMPLAN on our e-learning platform.
39
00:05:48,000 --> 00:05:50,000
Thank you and see you next time.