In this tutorial, I'll show you how you can plan a lightning protection system by
2
00:00:19,240 --> 00:00:21,400
using the mesh method.
3
00:00:21,400 --> 00:00:26,639
To do that, I already prepared a 3D building model with a flat roof for our first example
4
00:00:26,639 --> 00:00:30,799
and a 3D building model with a saddled roof for the second example.
5
00:00:30,799 --> 00:00:35,680
Both buildings will be planned in accordance with Lightning Protection Level 3 and have
6
00:00:35,680 --> 00:00:44,360
an earthing system according to DEAN 18.0.14 without foundation earth.
7
00:00:44,360 --> 00:00:47,619
Let's start with the flat roof.
8
00:00:47,619 --> 00:00:52,580
If I want to place a mesh on the roof surface, I can do that quick and easy by selecting
9
00:00:52,580 --> 00:00:55,959
the icon Add a Mesh.
10
00:00:55,959 --> 00:01:00,980
If I move my mouse cursor over the surface, I get a preview of the mesh and can orient
11
00:01:00,980 --> 00:01:03,139
the mesh on the surface.
12
00:01:03,139 --> 00:01:08,180
Once I decided how I want to place the mesh, I simply click left and the program automatically
13
00:01:08,180 --> 00:01:13,099
places all relevant conductors, conductor holders and clamps.
14
00:01:13,099 --> 00:01:20,220
To protect the additional roof structure, I simply repeat the previous step.
15
00:01:20,220 --> 00:01:24,019
As a next step, I connect the mesh on the additional roof structure with the one on
16
00:01:24,019 --> 00:01:25,860
the flat roof.
17
00:01:25,860 --> 00:01:31,980
Therefore I choose the command Conducting with wire from a wire mesh.
18
00:01:31,980 --> 00:01:40,400
I first choose the preferred position by clicking left and then I click right and choose either
19
00:01:40,400 --> 00:01:50,519
the furthest connection all the way down to the earthing system or the closest connection.
20
00:01:50,519 --> 00:01:58,639
The program does the rest for me and connects the two meshes.
21
00:01:58,639 --> 00:02:04,879
Let's repeat this step, but this time we choose the furthest connection.
22
00:02:04,879 --> 00:02:15,199
First I click left and then right choosing furthest connection and the program connects
23
00:02:15,199 --> 00:02:24,220
the meshes and places a down conductor with all relevant connections to the earthing system.
24
00:02:24,220 --> 00:02:29,039
For placing down conductors from the mesh on the flat roof to the earthing system, I
25
00:02:29,039 --> 00:02:43,679
can repeat the same command.
26
00:02:43,679 --> 00:02:50,520
If I want to place the mesh manually on the roof, I can do that by using one of these
27
00:02:50,520 --> 00:02:55,039
two commands here.
28
00:02:55,039 --> 00:03:13,119
Using the first option, the cable will be cut and clamped if the direction is changed.
29
00:03:13,119 --> 00:03:37,119
If I select the second option, the cable will be bent once I change directions.
30
00:03:37,119 --> 00:04:07,000
It is also possible to connect two meshes or two wires by using this function here.
31
00:04:07,000 --> 00:04:27,239
We select the first cable and then select the second cable.
32
00:04:27,239 --> 00:04:36,279
In our second example, I will place a mesh on a saddle roof.
33
00:04:36,279 --> 00:04:41,440
Then we choose the icon add a mesh for lightning protection to a surface and place the mesh
34
00:04:41,440 --> 00:04:43,920
on the first side of our roof.
35
00:04:43,920 --> 00:04:49,880
I repeat the last command by pressing the spacebar.
36
00:04:49,880 --> 00:04:54,440
Now we want to add a cable along the ridge line and choose the appropriate icon in the
37
00:04:54,440 --> 00:05:04,160
toolbar to place the cable on the ridge line.
38
00:05:04,160 --> 00:05:10,880
If I click right, I can change to the realistic view to better see the conductor holders that
39
00:05:10,880 --> 00:05:15,359
were placed.
40
00:05:15,359 --> 00:05:43,299
Make sure to check if all cables are connected and make the missing connections where necessary.
41
00:05:43,299 --> 00:05:58,339
Placing the down conductors works in the same way as before.
42
00:05:58,339 --> 00:06:00,260
That's it for this tutorial.
43
00:06:00,260 --> 00:06:01,100
Thanks for watching.