Today, I'll demonstrate how to design the earthing system according to IEC 62305 part
2
00:00:21,120 --> 00:00:22,120
3.
3
00:00:22,120 --> 00:00:27,320
Let's start with a type A earth electrode arrangement with planned outer lightning protection
4
00:00:27,320 --> 00:00:28,440
system.
5
00:00:28,440 --> 00:00:34,200
As a first step, I assign my earthing system by selecting the floor slab, clicking right
6
00:00:34,200 --> 00:00:37,959
and selecting assign earthing system.
7
00:00:37,959 --> 00:00:45,119
Then I move to the earthing settings.
8
00:00:45,119 --> 00:00:53,400
I choose the earthing system according to IEC 62305, check the value for the specific
9
00:00:53,400 --> 00:00:59,439
earth resistance in ohmmeter and select if we want to work with type A or type B earthing
10
00:00:59,439 --> 00:01:00,439
electrodes.
11
00:01:00,439 --> 00:01:08,720
Then I choose between vertical and horizontal earthing electrodes.
12
00:01:08,720 --> 00:01:18,480
The used material is fine, so I click on apply to start the calculation of the earthing system.
13
00:01:18,480 --> 00:01:23,919
We see that the program automatically placed an equipotential bonding conductor for connecting
14
00:01:23,919 --> 00:01:26,199
the earth rods.
15
00:01:26,199 --> 00:01:30,599
The earth rods are not automatically placed at this point because we plan with an outer
16
00:01:30,599 --> 00:01:35,080
lightning protection system where the earth rods are placed per down conductor once they
17
00:01:35,080 --> 00:01:38,760
are added.
18
00:01:38,760 --> 00:01:44,320
To demonstrate that, I quickly change to a second window where I already prepared a building
19
00:01:44,320 --> 00:01:50,559
with lightning protection rods.
20
00:01:50,559 --> 00:01:58,879
If I select this rod, click right and select add down conductor cable, the system automatically
21
00:01:58,879 --> 00:02:06,800
sets an earth rod and makes a connection to the functional equipotential bonding conductor.
22
00:02:06,800 --> 00:02:11,759
The earth length calculation shows if the placed earth rods are sufficient or if additional
23
00:02:11,759 --> 00:02:14,320
measures need to be taken.
24
00:02:14,320 --> 00:02:21,360
I can display the calculation result by selecting the floor slab, clicking right and choosing
25
00:02:21,360 --> 00:02:28,059
earth length calculation result.
26
00:02:28,059 --> 00:02:33,479
The norm instructs to install at least two earthing electrodes, so we have to install
27
00:02:33,479 --> 00:02:40,000
an additional earth rod.
28
00:02:40,000 --> 00:02:46,320
I can simply add another earth rod by selecting the tab lightning protection and choosing
29
00:02:46,320 --> 00:02:50,240
add earth rod.
30
00:02:50,240 --> 00:02:56,800
Now I can choose the point of installation.
31
00:02:56,800 --> 00:03:01,320
In general, the length of the earth rod is automatically calculated through the earth
32
00:03:01,320 --> 00:03:03,199
length calculation.
33
00:03:03,199 --> 00:03:07,679
If you choose to deactivate the earth length calculation, the program automatically jumps
34
00:03:07,720 --> 00:03:14,759
to the recommended earth length of 9 meter.
35
00:03:14,759 --> 00:03:19,679
Planning the earthing system with straight surface earth electrodes works in a similar
36
00:03:19,679 --> 00:03:22,039
way.
37
00:03:22,039 --> 00:03:27,279
To demonstrate that, I remove our lightning protection system by clicking on lightning
38
00:03:27,279 --> 00:03:33,479
protection and then remove lightning protection system and start to plan again with the same
39
00:03:33,479 --> 00:03:40,399
settings.
40
00:03:40,399 --> 00:03:55,440
Except this time I choose the horizontal earthing electrodes and click on apply.
41
00:03:55,440 --> 00:04:00,679
Again the equipotential bonding conductor is placed and I can add earth electrodes either
42
00:04:00,880 --> 00:04:21,640
per down conductor or manually as before.
43
00:04:21,640 --> 00:04:27,160
As the last point of this tutorial, I'd like to make an example with a ring earth electrode.
44
00:04:27,160 --> 00:04:34,640
And first we remove the lightning protection system again.
45
00:04:34,640 --> 00:04:39,920
Then we open the earthing settings.
46
00:04:39,920 --> 00:04:46,000
And if I now choose type B earthing electrodes, I can select if I additionally want to work
47
00:04:46,000 --> 00:04:51,640
with vertical or horizontal earthing electrodes if additional earthing electrodes are required
48
00:04:51,640 --> 00:04:55,119
due to the size of the floor slab being too small.
49
00:04:55,839 --> 00:05:01,720
However, I receive a note from the program if this should be necessary.
50
00:05:01,720 --> 00:05:07,519
When type B earthing is active, I can choose in the options tab to activate or deactivate
51
00:05:07,519 --> 00:05:09,959
the mesh.
52
00:05:09,959 --> 00:05:17,799
When planning in accordance with IEC 62305, a minimum vertical distance of 0.5 meter is
53
00:05:17,799 --> 00:05:21,279
required.
54
00:05:21,279 --> 00:05:27,399
Once I choose apply, I see the outcome in our drawing.
55
00:05:27,399 --> 00:05:28,720
That's it for today.
56
00:05:28,720 --> 00:05:29,480
Thanks for watching.