Today, I'll show you how to manage your general settings for the earthing system.
2
00:00:19,959 --> 00:00:21,760
Let's first check some standard settings.
3
00:00:21,760 --> 00:00:28,240
You can open the lightning protection settings either with the red lightning icon here, or
4
00:00:28,240 --> 00:00:38,320
you can move to file, settings and lightning protection.
5
00:00:38,320 --> 00:00:44,000
Under the accessories tab, you have the option to preset the material you want to use below
6
00:00:44,000 --> 00:00:48,840
the disconnection point, or in other words for your earthing system.
7
00:00:48,840 --> 00:00:53,959
You can select your preferred material for the foundation and change the type of material
8
00:00:53,959 --> 00:00:58,799
that is used as standard for foundation and ground.
9
00:00:58,799 --> 00:01:03,959
Of course, you can always change the selected preference in your project.
10
00:01:03,959 --> 00:01:14,040
Remember to set your changes as default if you want them as your standard selection.
11
00:01:14,040 --> 00:01:24,680
To manage the earthing settings in a project, we first need to draw a floor slab.
12
00:01:24,680 --> 00:01:33,599
You select the floor slab, click right and choose assign earthing system.
13
00:01:33,599 --> 00:01:41,879
If we repeat this step, we now have access to the earthing settings.
14
00:01:41,879 --> 00:01:47,320
Here we have an overview of our general settings, such as the lightning protection level, for
15
00:01:47,320 --> 00:01:49,959
example.
16
00:01:49,959 --> 00:01:56,080
Now I can choose between planning the earthing system according to DIN 18014 or according
17
00:01:56,080 --> 00:02:03,080
to IEC 62305 part 3.
18
00:02:03,080 --> 00:02:09,880
In addition, I can check if we have a foundation earth.
19
00:02:09,880 --> 00:02:15,839
Please also note the additional hints here.
20
00:02:15,839 --> 00:02:23,119
The specific earth resistance in ohmmeter can be adapted in this window.
21
00:02:23,119 --> 00:02:29,179
If I plan the earthing system according to IEC 62305, I can choose if I want to work
22
00:02:29,179 --> 00:02:35,080
with vertical or horizontal earthing electrodes for type A.
23
00:02:35,080 --> 00:02:42,320
The same goes for additional earth electrodes for type B if the considered area is too small.
24
00:02:42,320 --> 00:02:53,119
Here below I can adapt the material settings for the project individually.
25
00:02:53,119 --> 00:03:02,880
If I move to options, I can adapt the mesh size for the foundation grounding and for
26
00:03:02,880 --> 00:03:08,039
the ring grounding in meter.
27
00:03:08,039 --> 00:03:13,600
If I want the mesh to be evenly spaced across the relevant size, I can select the checkboxes
28
00:03:13,600 --> 00:03:15,600
here.
29
00:03:15,600 --> 00:03:26,600
Lastly, we can adapt the horizontal and vertical distances.
30
00:03:26,600 --> 00:03:34,080
Once I am done, I click on apply and the program calculates the earthing system.
31
00:03:34,080 --> 00:03:38,199
I'll demonstrate in additional tutorials how I can plan the earthing system according
32
00:03:38,199 --> 00:03:44,759
to DIN 18014 and IEC 62305 type A and type B.