Would you like to inspect the original subtitles? These are the user uploaded subtitles that are being translated:
1
00:00:02,275 --> 00:00:05,275
--Captions by VITAC--
www.vitac.com
2
00:00:05,275 --> 00:00:08,241
CAPTIONS PAID FOR BY
DISCOVERY COMMUNICATIONS
3
00:00:52,931 --> 00:00:55,655
Narrator: IndyCars
ARE OPEN-COCKPIT RACE CARS
4
00:00:55,655 --> 00:00:58,517
THAT COMPETE IN
THE ANNUAL INDIANAPOLIS 500 RACE
5
00:00:58,517 --> 00:01:00,034
IN THE U.S.
6
00:01:00,034 --> 00:01:03,068
THE CARS
ARE ENTIRELY CUSTOM-BUILT.
7
00:01:03,068 --> 00:01:05,448
EVEN THE DRIVER'S SEAT
IS SPECIALLY CONTOURED
8
00:01:05,448 --> 00:01:07,103
TO THE DRIVER'S BODY SHAPE
9
00:01:07,103 --> 00:01:09,241
AND POSITION IN WHICH
HE OR SHE SITS
10
00:01:09,241 --> 00:01:11,310
MOST COMFORTABLY IN THE CAR.
11
00:01:15,068 --> 00:01:18,034
THE CUSTOM-MADE DRIVER'S SEAT
IN AN IndyCar
12
00:01:18,034 --> 00:01:22,344
IS MADE OF FIRE-RESISTANT FABRIC
OVER IMPACT-ABSORBING FOAM.
13
00:01:22,344 --> 00:01:25,172
IT HAS OPENINGS
AT THE SHOULDER, LAP, AND LEGS
14
00:01:25,172 --> 00:01:27,172
FOR THE SAFETY HARNESS.
15
00:01:27,172 --> 00:01:30,655
TO MAKE THE SEAT, THEY FIRST
HAVE TO PRODUCE A TEMPLATE,
16
00:01:30,655 --> 00:01:33,931
WHICH IS, IN ITSELF,
A TWO-DAY PROCESS.
17
00:01:33,931 --> 00:01:35,620
TECHNICIANS PREPARE,
18
00:01:35,620 --> 00:01:39,241
THEN POUR AN ADHESIVE INTO
A BAG FULL OF FOAM BEADS.
19
00:01:41,551 --> 00:01:44,379
THE ADHESIVE CONTAINS
RESIN AND A HARDENER.
20
00:01:46,827 --> 00:01:49,103
ONCE THE ADHESIVE SEEPS IN,
21
00:01:49,103 --> 00:01:53,068
THEY SQUEEZE OUT THE AIR
AND TIE THE BAG CLOSED.
22
00:01:57,482 --> 00:01:59,965
THEY KNEAD THE BAG
TO SPREAD THE ADHESIVE
23
00:01:59,965 --> 00:02:02,586
OVER ALL THE FOAM BEADS INSIDE.
24
00:02:07,827 --> 00:02:10,034
NEXT, LAYING THE BAG FLAT,
25
00:02:10,034 --> 00:02:12,344
THEY SPREAD
THE ADHESIVE-SATURATED BEADS
26
00:02:12,344 --> 00:02:15,103
IN AN EVEN LAYER.
27
00:02:15,103 --> 00:02:18,758
THEN THEY INSTALL A VALVE...
28
00:02:18,758 --> 00:02:21,241
ATTACH IT TO A VACUUM PUMP,
29
00:02:21,241 --> 00:02:25,206
AND SUCTION OUT
MOST OF THE REMAINING AIR.
30
00:02:25,206 --> 00:02:29,517
THEY SHAPE A CAVITY IN THE
MIDDLE TO FIT THE DRIVER'S BODY.
31
00:02:29,517 --> 00:02:32,448
ONCE THEY VACUUMED OUT ENOUGH
AIR TO MAKE THE BAG TIGHT ENOUGH
32
00:02:32,448 --> 00:02:34,862
TO HOLD THE SHAPE
OF THIS CAVITY...
33
00:02:36,310 --> 00:02:39,172
...THEY PLACE IT
IN THE RACE CAR'S COCKPIT,
34
00:02:39,172 --> 00:02:42,103
PRESSING THE FOAM BEADS
AS SNUGLY AS POSSIBLE
35
00:02:42,103 --> 00:02:44,137
INTO ALL THE NOOKS AND CRANNIES.
36
00:02:44,137 --> 00:02:46,896
THIS ENSURES
THE CAR SEAT WILL FIT PROPERLY
37
00:02:46,896 --> 00:02:48,862
AND NOT SHIFT UNDER THE DRIVER.
38
00:02:48,862 --> 00:02:51,241
THE DRIVER NOW
HAS TO SIT IN THE CAR
39
00:02:51,241 --> 00:02:53,275
SO THEY CAN
CUSTOM-CONTOUR THE TEMPLATE
40
00:02:53,275 --> 00:02:55,758
TO HIS BODY
IN THE DRIVING POSITION.
41
00:02:58,206 --> 00:03:01,655
ONCE HE'S SETTLED COMFORTABLY
WITH HIPS AND SHOULDERS SQUARE
42
00:03:01,655 --> 00:03:03,413
AND WEARING HIS HELMET,
43
00:03:03,413 --> 00:03:05,172
THEY BEGIN TAKING MEASUREMENTS,
44
00:03:05,172 --> 00:03:08,689
STARTING WITH THE HEIGHT OF HIS
HEAD, CRITICAL FOR AERODYNAMICS,
45
00:03:08,689 --> 00:03:12,241
AND OF HIS SIGHT LINE OVER
THE HOOD, CRITICAL FOR SAFETY.
46
00:03:12,241 --> 00:03:14,103
BOTH MEASUREMENTS MUST CONFORM
47
00:03:14,103 --> 00:03:17,241
WITH THE RACING ASSOCIATION'S
STRICT REGULATIONS.
48
00:03:17,241 --> 00:03:18,862
THEY ALSO MEASURE THE DISTANCE
49
00:03:18,862 --> 00:03:21,413
BETWEEN HIS CHEST
AND THE STEERING WHEEL
50
00:03:21,413 --> 00:03:23,551
AND ENSURE
THERE'S ADEQUATE LEG CLEARANCE
51
00:03:23,551 --> 00:03:26,275
TO ENTER AND EXIT THE COCKPIT.
52
00:03:26,275 --> 00:03:29,862
THE DRIVER SITS DOWN,
GETS OUT, GETS BACK IN
53
00:03:29,862 --> 00:03:31,862
SEVERAL TIMES
54
00:03:31,862 --> 00:03:34,758
AS THE TECHNICIANS MEASURE
AND MAKE ADJUSTMENTS.
55
00:03:34,758 --> 00:03:38,137
THE ENTIRE PROCESS
TAKES ABOUT 40 MINUTES.
56
00:03:38,137 --> 00:03:41,620
WHEN IT'S ALL DONE, THEY RUN THE
VACUUM FOR ANOTHER FOUR HOURS
57
00:03:41,620 --> 00:03:44,620
AND LET THE FOAM CURE OVERNIGHT.
58
00:03:44,620 --> 00:03:46,000
THE NEXT MORNING,
59
00:03:46,000 --> 00:03:49,000
THEY USE A HOT KNIFE
TO MELT A LINE THROUGH THE FOAM
60
00:03:49,000 --> 00:03:51,724
AND DISLODGE THE TEMPLATE
FROM THE COCKPIT.
61
00:03:51,724 --> 00:03:55,448
THE DRIVER RETURNS FOR A FINAL
TWO- TO THREE-HOUR SITTING,
62
00:03:55,448 --> 00:03:58,275
DURING WHICH THE TECHS TRIM
THE FOAM AS CLOSELY AS POSSIBLE
63
00:03:58,275 --> 00:04:00,931
TO HIS BODY CONTOUR.
64
00:04:02,689 --> 00:04:06,413
THE SHAPE NOW FINALIZED,
THEY COVER THE ENTIRE SURFACE
65
00:04:06,413 --> 00:04:09,551
WITH CLOTH ADHESIVE TAPE
AND A MATTE FINISH.
66
00:04:09,551 --> 00:04:12,103
THIS CREATES
A NON-REFLECTIVE BACKGROUND
67
00:04:12,103 --> 00:04:14,689
SUITABLE FOR LASER SCANNING.
68
00:04:17,413 --> 00:04:19,482
ONTO THIS DULL SURFACE,
69
00:04:19,482 --> 00:04:21,758
THEY ADHERE
POSITIONING TARGETS --
70
00:04:21,758 --> 00:04:24,379
REFLECTIVE DOTS
SPACED FOUR INCHES APART
71
00:04:24,379 --> 00:04:27,655
THAT CREATE A GRID PATTERN
OVER THE ENTIRE TEMPLATE.
72
00:04:30,655 --> 00:04:35,689
THE 3-D LASER SCANNER
READS THESE REFLECTIVE DOTS...
73
00:04:40,448 --> 00:04:44,724
...THAT A COMPUTER TRANSLATES
INTO A 3-D IMAGE.
74
00:04:47,517 --> 00:04:50,448
SPECIALIZED SOFTWARE
THEN CONVERTS THIS IMAGE
75
00:04:50,448 --> 00:04:52,068
INTO A TECHNICAL DRAWING,
76
00:04:52,068 --> 00:04:54,137
WHICH GUIDES AN AUTOMATED ROUTER
77
00:04:54,137 --> 00:04:57,275
TO CUT THE SEAT PARTS
OUT OF POLYPROPYLENE FOAM.
78
00:04:57,275 --> 00:05:01,793
THIS PRECISION-CUTTING PROCESS
TAKES FOUR TO SIX HOURS.
79
00:05:06,206 --> 00:05:09,275
THE ROUTER CUTS OUT
SIX TO EIGHT SECTIONS,
80
00:05:09,275 --> 00:05:12,586
WHICH TECHNICIANS
THEN CAREFULLY GLUE TOGETHER
81
00:05:12,586 --> 00:05:14,724
INTO THE FULL SEAT.
82
00:05:24,586 --> 00:05:28,241
THEY COVER THE FINISHED SEAT
IN FIRE-RETARDANT MATERIAL,
83
00:05:28,241 --> 00:05:31,344
FIRST APPLYING THE FABRIC
WITH SPRAY ADHESIVE,
84
00:05:31,344 --> 00:05:34,034
THEN TRIMMING IT
TO THE SHAPE OF THE SEAT.
85
00:05:35,827 --> 00:05:38,551
THIS FOAM IS QUITE ELASTIC,
86
00:05:38,551 --> 00:05:41,206
SO IT ABSORBS IMPACT
AND PROTECTS THE DRIVER.
87
00:05:41,206 --> 00:05:43,379
AT THE SAME TIME, IT HAS MEMORY,
88
00:05:43,379 --> 00:05:48,448
SO AFTER A BLOW, IT REGAINS
ITS DRIVER-CUSTOMIZED SHAPE.
89
00:06:01,034 --> 00:06:03,103
Narrator: PEOPLE HAVE ALWAYS
BEEN ENCHANTED
90
00:06:03,103 --> 00:06:05,068
BY THE BEAUTY OF FLOWERS.
91
00:06:05,068 --> 00:06:07,896
IT'S NOT SURPRISING
THAT THESE JEWELS OF NATURE,
92
00:06:07,896 --> 00:06:09,862
OFTEN IN ARTIFICIAL FORM,
93
00:06:09,862 --> 00:06:14,448
ARE USED IN DECORATIVE OBJECTS
AND ARTS AND CRAFTS PROJECTS.
94
00:06:14,448 --> 00:06:16,206
PAPER FLOWERS LAST FOREVER,
95
00:06:16,206 --> 00:06:19,862
AND YOU DON'T HAVE TO
REMEMBER TO WATER THEM.
96
00:06:22,172 --> 00:06:24,689
THESE FLOWERS
ARE MADE OF SAA PAPER.
97
00:06:24,689 --> 00:06:27,206
THE SAA TREE
IS A VARIETY OF MULBERRY
98
00:06:27,206 --> 00:06:30,517
THAT GROWS ABUNDANTLY
ACROSS SOUTHEAST ASIA.
99
00:06:30,517 --> 00:06:34,620
FOR MORE THAN 700 YEARS,
VILLAGERS IN NORTHERN THAILAND
100
00:06:34,620 --> 00:06:37,689
HAVE BEEN USING SAA BARK
TO MAKE PAPER.
101
00:06:37,689 --> 00:06:39,758
THE PAPER IS USED
FOR CRAFTING ITEMS
102
00:06:39,758 --> 00:06:43,172
SUCH AS UMBRELLAS,
FANS, AND FLOWERS.
103
00:06:43,172 --> 00:06:45,862
THEY SOAK THE DRIED BARK
IN WATER OVERNIGHT
104
00:06:45,862 --> 00:06:47,931
TO BEGIN SOFTENING IT UP,
105
00:06:47,931 --> 00:06:50,482
BOIL IT OVER A WOOD FIRE
FOR FOUR HOURS,
106
00:06:50,482 --> 00:06:52,758
THEN SOAK IT AGAIN OVERNIGHT.
107
00:06:52,758 --> 00:06:56,482
ALL OF THIS SOFTENS THE BARK
INTO FIBROUS PULP.
108
00:06:56,482 --> 00:06:59,344
NEXT,
THEY SOAK THE PULP OVERNIGHT
109
00:06:59,344 --> 00:07:02,655
IN HYDROGEN PEROXIDE
TO WHITEN IT,
110
00:07:02,655 --> 00:07:04,482
THEN THEY RINSE OFF THE BLEACH,
111
00:07:04,482 --> 00:07:07,689
WHICH WOULD INTERFERE WITH
THE DYING PROCESS LATER ON.
112
00:07:07,689 --> 00:07:10,724
WORKERS DISCARD
ANY DISCOLORED PIECES.
113
00:07:10,724 --> 00:07:14,689
THE GOAL IS TO MAKE EACH
SHEET OF PAPER EVENLY WHITE
114
00:07:14,689 --> 00:07:17,413
SO THAT IT ABSORBS COLORED DYE
UNIFORMLY.
115
00:07:18,931 --> 00:07:21,517
NOW THEY LOAD THE PULP
INTO A MILL,
116
00:07:21,517 --> 00:07:24,551
WHICH GRINDS IT UP
AND MIXES IT WITH WATER.
117
00:07:29,931 --> 00:07:33,275
THIS PROCESS,
WHICH TAKES ABOUT HALF AN HOUR,
118
00:07:33,275 --> 00:07:37,689
TRANSFORMS THE PIECES INTO SOFT,
FLUFFY, AND VERY SOGGY FIBERS.
119
00:07:42,793 --> 00:07:45,206
WHAT WAS ONCE TREE BARK
120
00:07:45,206 --> 00:07:49,344
IS NOW READY
TO BE PROCESSED INTO PAPER.
121
00:07:51,034 --> 00:07:52,586
EVERY SINGLE SHEET
122
00:07:52,586 --> 00:07:55,586
IS HANDCRAFTED
ON FINE MESH SCREENS.
123
00:07:55,586 --> 00:07:57,586
THEY SUBMERGE A SCREEN IN WATER,
124
00:07:57,586 --> 00:08:00,931
THEN DROP IN ROUGHLY
15 OUNCES OF FIBERS.
125
00:08:00,931 --> 00:08:03,896
THEY MANUALLY STIR THE WATER
TO SPREAD THE FIBERS
126
00:08:03,896 --> 00:08:06,517
IN A THIN LAYER
ACROSS THE SCREEN.
127
00:08:08,172 --> 00:08:11,172
THEY SLOWLY LIFT THE SCREEN
OUT OF THE WATER
128
00:08:11,172 --> 00:08:14,310
AND PRESS THE SURFACE BY HAND
TO SMOOTH IT OUT.
129
00:08:14,310 --> 00:08:18,310
THE SCREEN THEN STANDS IN THE
SUN FOR THREE TO FOUR HOURS,
130
00:08:18,310 --> 00:08:19,758
FLIPPED A FEW TIMES
131
00:08:19,758 --> 00:08:23,275
UNTIL THE FIBER'S DRY
INTO A SOLID SHEET OF PAPER.
132
00:08:23,275 --> 00:08:25,517
TO COLOR THE PAPER,
133
00:08:25,517 --> 00:08:29,517
THEY FILL A BASIN WITH HOT WATER
AND ADD A CHEMICAL DYE.
134
00:08:29,517 --> 00:08:31,068
THEY TEST THE COLOR,
135
00:08:31,068 --> 00:08:33,896
AND IF IT'S JUST RIGHT,
THEY SUBMERGE THE SHEET.
136
00:08:33,896 --> 00:08:36,172
THE SHEET ABSORBS THE DYE
INSTANTLY
137
00:08:36,172 --> 00:08:40,965
IN A CONSISTENT SHADE THANKS TO
THE UNIFORMLY WHITE BASE COLOR.
138
00:08:42,620 --> 00:08:46,068
THEY HANG THE SHEET OUTSIDE
TO DRY IN THE SUN.
139
00:08:47,862 --> 00:08:51,827
IN THREE TO FOUR HOURS,
THE PAPER IS READY TO BLOOM.
140
00:08:53,931 --> 00:08:57,758
THEY CUT OUT FLOWER SHAPES
WITH A HAND-OPERATED PRESS
141
00:08:57,758 --> 00:09:00,862
THAT STAMPS A SHARP METAL DYE
THROUGH THE SHEET OF PAPER.
142
00:09:03,827 --> 00:09:07,586
EACH SHAPE WILL BE A LAYER
OF PETALS IN A FLOWER.
143
00:09:07,586 --> 00:09:10,931
THERE ARE DYES
IN VARIOUS SHAPES AND SIZES.
144
00:09:12,172 --> 00:09:15,206
HOWEVER, THE PETALS THEY PRODUCE
ARE FLAT --
145
00:09:15,206 --> 00:09:16,689
NOT VERY LIFELIKE --
146
00:09:16,689 --> 00:09:20,655
SO WORKERS PLACE ONE PETAL AT
A TIME ON A FLOWER-SHAPED MOLD
147
00:09:20,655 --> 00:09:22,551
AND STAMP IT WITH A HOT PRESS.
148
00:09:22,551 --> 00:09:24,862
THIS PERMANENTLY SHAPES
THE PETALS
149
00:09:24,862 --> 00:09:26,586
TO THE CONTOUR OF THE MOLD
150
00:09:26,586 --> 00:09:29,965
ALMOST THE SAME WAY
A HOT IRON PRESSES CLOTHES.
151
00:09:32,620 --> 00:09:34,310
THEN IT'S ASSEMBLY TIME.
152
00:09:34,310 --> 00:09:37,793
TO MAKE A ROSE, THEY MOUNT
A WHITE BALL MADE OF FOAM,
153
00:09:37,793 --> 00:09:39,137
OR FLOWER AND GLUE,
154
00:09:39,137 --> 00:09:41,655
ONTO THE END
OF A THREE-INCH-LONG WIRE.
155
00:09:41,655 --> 00:09:44,206
THEY FOLD THE INNER PETALS
OVER THE BALL
156
00:09:44,206 --> 00:09:47,275
AND PINCH THEM TOGETHER TO
CREATE THE CENTER OF THE ROSE.
157
00:09:47,275 --> 00:09:50,379
THEN THEY THREAD FOUR TO FIVE
PETAL LAYERS OF THE SAME SIZE
158
00:09:50,379 --> 00:09:52,172
ON THE WIRE,
159
00:09:52,172 --> 00:09:55,827
BENDING AND PINCHING THOSE,
AS WELL, TO FORM THE ROSE SHAPE.
160
00:10:00,137 --> 00:10:02,172
ONCE THE PETALS ARE COMPLETE,
161
00:10:02,172 --> 00:10:05,689
THEY FINISH OFF WITH
A GREEN PAPER LEAF AT THE BASE.
162
00:10:11,034 --> 00:10:14,551
TO MAKE A DAISY,
THEY TAKE A FLAT FLOWER
163
00:10:14,551 --> 00:10:17,448
AND GLUE A BROWN PAPER DOT
IN THE MIDDLE.
164
00:10:17,448 --> 00:10:20,724
THEN THEY GLUE ANOTHER
FLAT FLOWER BENEATH IT
165
00:10:20,724 --> 00:10:23,310
AND A LEAF BASE BENEATH THAT.
166
00:10:31,172 --> 00:10:33,103
TO MAKE ANOTHER TYPE OF ROSE,
167
00:10:33,103 --> 00:10:35,931
THEY GENTLY TWIST
THE TIPS OF THE PETALS.
168
00:10:39,620 --> 00:10:42,172
EVEN THOUGH
THEY'RE MADE FROM TREES,
169
00:10:42,172 --> 00:10:45,724
THESE ARTIFICIAL FLOWERS
ARE ENVIRONMENTALLY FRIENDLY.
170
00:10:45,724 --> 00:10:49,862
THE SAA'S SEVERED BRANCHES AND
STRIPPED BARK GROW BACK QUICKLY,
171
00:10:49,862 --> 00:10:52,931
PROVIDING A RENEWABLE SUPPLY
OF RAW MATERIAL
172
00:10:52,931 --> 00:10:56,068
FOR CRAFTING
BLOOMING PAPER BOUQUETS.
173
00:11:08,896 --> 00:11:11,827
Narrator: WEATHER-WISE,
THESE ARE TURBULENT TIMES.
174
00:11:11,827 --> 00:11:14,137
THERE ARE MORE STORMS
AND HEAT WAVES,
175
00:11:14,137 --> 00:11:17,344
AND THAT MEANS AN INCREASED
LIKELIHOOD OF POWER OUTAGES.
176
00:11:17,344 --> 00:11:21,241
A STANDBY GENERATOR
SUPPLIES EMERGENCY ELECTRICITY
177
00:11:21,241 --> 00:11:23,379
WITHIN SECONDS OF AN OUTAGE
178
00:11:23,379 --> 00:11:27,000
SO A HOMEOWNER CAN
RIDE OUT THE STORM IN COMFORT.
179
00:11:31,206 --> 00:11:32,758
IN TODAY'S HIGH-TECH WORLD,
180
00:11:32,758 --> 00:11:35,517
STAYING PLUGGED IN
HAS NEVER BEEN MORE IMPORTANT.
181
00:11:35,517 --> 00:11:37,310
WIRED TO
A HOME'S ELECTRICAL SYSTEM,
182
00:11:37,310 --> 00:11:40,241
A STANDBY GENERATOR
AUTOMATICALLY POWERS UP
183
00:11:40,241 --> 00:11:42,034
IN THE EVENT OF AN OUTAGE.
184
00:11:42,034 --> 00:11:44,103
IT ASSUMES THE ELECTRICAL LOAD
185
00:11:44,103 --> 00:11:47,379
UNTIL THE PUBLIC-UTILITIES
SYSTEM COMES BACK ONLINE.
186
00:11:47,379 --> 00:11:49,379
WITH YOUR OWN STANDBY GENERATOR,
187
00:11:49,379 --> 00:11:52,448
A POWER OUTAGE
IS NEVER A CRISIS.
188
00:11:52,448 --> 00:11:54,620
PRODUCTION STARTS
WITH A STATOR.
189
00:11:54,620 --> 00:11:57,448
IT'S THE STATIONARY CORE
OF THE ALTERNATOR --
190
00:11:57,448 --> 00:12:01,172
THE PART THAT CONVERTS ENERGY
FROM THE MOTOR TO ELECTRICITY.
191
00:12:01,172 --> 00:12:04,896
A PRESS COMPACTS 100 OR MORE
LAMINATED STEEL DISKS
192
00:12:04,896 --> 00:12:08,068
TO CREATE THE STATOR CORE.
193
00:12:08,068 --> 00:12:12,344
MACHINERY UNWINDS STEEL BANDING
AND WRAPS IT AROUND THE STACK
194
00:12:12,344 --> 00:12:15,103
TO HOLD THE CORE LAYERS
TOGETHER.
195
00:12:19,413 --> 00:12:22,586
MACHINERY LIFTS THE STATOR CORE
OUT OF THE ASSEMBLY DEVICE
196
00:12:22,586 --> 00:12:25,586
AND TRANSFERS IT
TO THE NEXT STATION.
197
00:12:32,448 --> 00:12:34,517
HERE, AN AUTOMATED SYSTEM
198
00:12:34,517 --> 00:12:37,931
INSULATES THE NUMEROUS SLOTS
IN THE CORE.
199
00:12:39,241 --> 00:12:43,896
AS THE CORE TURNS, A MACHINE
CUTS, FORMS, AND INSERTS
200
00:12:43,896 --> 00:12:47,724
SYNTHETIC INSULATING FABRIC
INTO EACH SLOT.
201
00:12:51,827 --> 00:12:54,172
MEANWHILE, AT ANOTHER STATION,
202
00:12:54,172 --> 00:12:58,172
AN AUTOMATED SYSTEM WINDS
COPPER WIRE ONTO A MANDREL.
203
00:13:00,551 --> 00:13:02,862
THE SLOTS IN THE MANDREL
ARE THE SAME SIZE
204
00:13:02,862 --> 00:13:04,758
AS THE INSULATED SLOTS
IN THE CORE.
205
00:13:06,586 --> 00:13:11,551
THIS CONFIGURES THE COPPER
WINDINGS TO FIT THE CORE SLOTS.
206
00:13:11,551 --> 00:13:14,793
BUT FIRST, A TECHNICIAN
SLIDES THE COPPER COILS
207
00:13:14,793 --> 00:13:16,827
ONTO A THREADING TOOL.
208
00:13:19,931 --> 00:13:23,344
THIS TOOL MAINTAINS
THE CONFIGURATION OF THE COILS
209
00:13:23,344 --> 00:13:26,482
TO PREPARE THEM FOR INSTALLATION
IN THE STATOR CORE.
210
00:13:28,758 --> 00:13:32,000
THEY WIND MORE BUNDLES
OF COPPER WIRE.
211
00:13:34,379 --> 00:13:37,482
ONCE ALL THE WINDINGS
HAVE BEEN CORRECTLY ARRANGED
212
00:13:37,482 --> 00:13:38,896
ON THE THREADING TOOL,
213
00:13:38,896 --> 00:13:40,862
THE TECHNICIAN
IS READY TO TRANSFER THEM
214
00:13:40,862 --> 00:13:42,586
TO THE STATOR CORE.
215
00:13:44,724 --> 00:13:48,620
HE PLACES THE STATOR
ON TOP OF THE THREADING TOOL
216
00:13:48,620 --> 00:13:51,103
AND ACTIVATES A HYDRAULIC DEVICE
217
00:13:51,103 --> 00:13:53,482
THAT PUSHES THE WIRES
UP THROUGH THE TOOL
218
00:13:53,482 --> 00:13:56,000
AND INTO THE SLOTS
OF THE STATOR CORE.
219
00:13:57,724 --> 00:14:01,241
THE DEVICE RETRACTS,
AND HE REMOVES THE STATOR.
220
00:14:01,241 --> 00:14:05,586
THE COPPER WIRES TRANSFORM THE
STATOR INTO AN ELECTROMAGNET,
221
00:14:05,586 --> 00:14:08,379
WHICH IS CRITICAL
FOR ELECTRICAL GENERATION.
222
00:14:08,379 --> 00:14:10,655
HE TRIMS THE ENDS OF THE WIRES
223
00:14:10,655 --> 00:14:14,000
AND SETS THE LEFTOVERS ASIDE
FOR RECYCLING.
224
00:14:15,931 --> 00:14:19,758
HE SLIDES INSULATING SLEEVES
ONTO THE ENDS.
225
00:14:21,241 --> 00:14:24,275
THEN IT'S INTO
THE LACING MACHINE.
226
00:14:26,000 --> 00:14:29,758
THIS MACHINE CROCHETS
A STRING WRAP AROUND THE BUNDLES
227
00:14:29,758 --> 00:14:32,241
TO HOLD THE WIRES TOGETHER.
228
00:14:32,241 --> 00:14:34,551
IT ALSO PULLS IN
ANY LOOSE STRANDS
229
00:14:34,551 --> 00:14:37,793
TO KEEP THEM FROM SNAGGING
ON GENERATOR COMPONENTS.
230
00:14:37,793 --> 00:14:41,137
WITH THE WIRING
PRECISELY WOUND AND WRAPPED,
231
00:14:41,137 --> 00:14:43,862
THIS IMPORTANT
GENERATOR COMPONENT
232
00:14:43,862 --> 00:14:45,862
IS READY
FOR THE FINISHING TOUCH --
233
00:14:45,862 --> 00:14:47,862
A CLEAR VARNISH.
234
00:14:47,862 --> 00:14:52,172
THE LID CLOSES ON THE TANK,
AND A VACUUM PULLS AIR OUT.
235
00:14:52,172 --> 00:14:56,758
THE TANK THEN FILLS WITH CLEAR
VARNISH TO COAT THE STATORS.
236
00:14:56,758 --> 00:14:59,689
THE VARNISH FILLS IN ANY GAPS
IN THE WINDINGS.
237
00:15:01,586 --> 00:15:05,655
THEY TRANSFER THE STATORS TO
AN OVEN AND BAKE ON THE VARNISH.
238
00:15:05,655 --> 00:15:09,448
ONCE HARDENED, THE VARNISH
INSULATES THE ENTIRE ASSEMBLY.
239
00:15:13,931 --> 00:15:16,655
THE NEXT TECHNICIAN
CONNECTS THE STATOR LEAD WIRES
240
00:15:16,655 --> 00:15:18,482
TO A TESTING MACHINE.
241
00:15:20,137 --> 00:15:24,448
THE MACHINE APPLIES HIGH-VOLTAGE
PULSES TO THE WIRE WINDINGS
242
00:15:24,448 --> 00:15:26,206
AND MONITORS THE OUTPUT
243
00:15:26,206 --> 00:15:29,827
FOR ANYTHING THAT COULD
CAUSE GENERATOR FAILURE.
244
00:15:29,827 --> 00:15:32,413
THE STATOR PASSES THE TEST.
245
00:15:34,000 --> 00:15:37,413
A TECHNICIAN NOW POSITIONS
AN OUTER CASING AND AN END CAP
246
00:15:37,413 --> 00:15:38,862
ON TOP OF THE STATOR,
247
00:15:38,862 --> 00:15:41,206
FOLLOWED BY
A STEEL PRESSING PLATE.
248
00:15:43,827 --> 00:15:47,068
A HYDRAULIC ARM THEN PROVIDES
THE MUSCLE POWER NEEDED
249
00:15:47,068 --> 00:15:50,551
TO FIT THE CASING AND CAP SNUGLY
TO THE STATOR.
250
00:15:52,931 --> 00:15:54,827
COMING UP NEXT,
251
00:15:54,827 --> 00:15:57,827
THE GENERATOR STATOR
JOINS THE ROTOR AND ENGINE,
252
00:15:57,827 --> 00:16:00,896
AND THE RESULT
IS PURELY ELECTRIC.
253
00:16:16,103 --> 00:16:18,275
Narrator:
THE AVERAGE HOME MAY CONTAIN
254
00:16:18,275 --> 00:16:21,068
OVER 100 ELECTRICAL APPLIANCES
AND DEVICES.
255
00:16:21,068 --> 00:16:24,172
WHEN THERE'S A POWER BLACKOUT,
EVERYTHING SHUTS DOWN.
256
00:16:24,172 --> 00:16:27,827
A STANDBY GENERATOR
RESTORES ELECTRICITY IN SECONDS
257
00:16:27,827 --> 00:16:30,896
TO KEEP THE REFRIGERATOR RUNNING
AND THE HEAT ON.
258
00:16:30,896 --> 00:16:35,172
IN AN EXTENDED POWER OUTAGE,
A GENERATOR CAN BE A LIFE SAVER.
259
00:16:37,448 --> 00:16:40,965
TO PRODUCE THE ALTERNATOR'S
ROTATING PART, THE ROTOR,
260
00:16:40,965 --> 00:16:43,896
THE TECHNICIAN
STACKS LAMINATED STEEL DISKS
261
00:16:43,896 --> 00:16:47,068
TO THE SAME HEIGHT
AS THE STATOR CORE.
262
00:16:47,068 --> 00:16:51,206
HE LUBRICATES THE OPENING
IN THE CENTER OF THE DISKS.
263
00:16:51,206 --> 00:16:52,724
HE INSERTS A SHAFT,
264
00:16:52,724 --> 00:16:55,379
AND A PRESS PUSHES IT
INTO THE STACK
265
00:16:55,379 --> 00:16:57,655
TO COMPLETE THE INSTALLATION.
266
00:16:59,310 --> 00:17:04,655
POWERED BY THE GENERATOR ENGINE,
THE SHAFT WILL SPIN THE ROTOR.
267
00:17:04,655 --> 00:17:06,724
THE TECHNICIAN
INSTALLS STEEL RODS
268
00:17:06,724 --> 00:17:08,827
TO MAINTAIN THE DISKS' ALIGNMENT
269
00:17:08,827 --> 00:17:12,275
AND THEN REMOVES THE ROTOR
FROM THE ASSEMBLY DEVICE.
270
00:17:12,275 --> 00:17:16,206
HE FITS MORE RODS TO IT
ON A SLIGHT ANGLE.
271
00:17:16,206 --> 00:17:18,206
THEY'LL ACT AS CONDUCTORS
272
00:17:18,206 --> 00:17:21,758
AND STABILIZE
THE ROTOR'S ELECTRICAL OUTPUT.
273
00:17:21,758 --> 00:17:26,655
HE SLIDES ALUMINUM CAPS
ONTO BOTH ENDS OF THE ROTOR.
274
00:17:26,655 --> 00:17:30,379
THEN IT'S OVER
TO AN AUTOMATED WELDER.
275
00:17:31,793 --> 00:17:34,344
THE MACHINE GRIPS THE ROTOR
AT BOTH ENDS
276
00:17:34,344 --> 00:17:35,586
AND SLOWLY TURNS IT
277
00:17:35,586 --> 00:17:39,034
AS A ROBOT WELDS BOTH CAPS
TO THE ROTOR BODY.
278
00:17:41,310 --> 00:17:46,103
WELDED IN PLACE, THE CAPS
SECURE THE ALUMINUM RODS.
279
00:17:47,655 --> 00:17:49,896
THE ALUMINUM SOLDER
USED IN THE WELD
280
00:17:49,896 --> 00:17:54,517
IS CONDUCTIVE AND WILL CREATE
AN ELECTRICAL CONNECTION.
281
00:17:54,517 --> 00:17:58,344
THE TECHNICIAN UNCLAMPS THE
ROTOR FROM THE WELDING MACHINE
282
00:17:58,344 --> 00:18:01,758
AND THEN TUCKS INSULATION
INTO SLOTS ON THE SIDES.
283
00:18:03,448 --> 00:18:05,551
THE ROTOR THEN GOES FOR A SPIN
284
00:18:05,551 --> 00:18:08,724
IN A MACHINE
THAT WINDS BANDS OF COPPER WIRE
285
00:18:08,724 --> 00:18:11,068
AROUND THE INSULATED SECTIONS.
286
00:18:11,068 --> 00:18:14,241
THESE WIRES
WILL ACT AS ELECTROMAGNETS
287
00:18:14,241 --> 00:18:17,241
AND HELP
PRODUCE ELECTRICAL CURRENT.
288
00:18:17,241 --> 00:18:19,793
THEY TIE STRING AROUND THE WIRE,
289
00:18:19,793 --> 00:18:22,827
ADD BEARINGS
AND A COPPER COLLECTOR RING,
290
00:18:22,827 --> 00:18:26,586
AND BAKE AN INSULATING VARNISH
ONTO THE ENTIRE ROTOR.
291
00:18:26,586 --> 00:18:30,655
THEY'RE NOW READY TO ASSEMBLE
THE STANDBY GENERATOR.
292
00:18:30,655 --> 00:18:35,310
USING A LIFT, THE TECHNICIAN
LOWERS THE ENGINE INTO POSITION.
293
00:18:35,310 --> 00:18:39,000
HE JOINS THE ROTOR SHAFT
TO THE ENGINE CRANKSHAFT.
294
00:18:42,827 --> 00:18:46,034
TO SECURE THE ASSEMBLY,
HE DRIVES A VERY LONG BOLT
295
00:18:46,034 --> 00:18:48,241
THROUGH THE ROTOR
TO THE CRANKSHAFT
296
00:18:48,241 --> 00:18:50,965
AND TIGHTENS IT
TO A SPECIFIC TORQUE.
297
00:18:50,965 --> 00:18:53,413
NEXT UP IS THE STATOR.
298
00:18:53,413 --> 00:18:55,482
IT WILL PROVIDE A MAGNETIC FIELD
299
00:18:55,482 --> 00:18:58,620
TO ADVANCE THE FLOW OF ELECTRONS
IN THE ROTOR.
300
00:18:59,862 --> 00:19:03,689
THE TECHNICIAN SLIDES THE STATOR
ONTO THE ROTOR.
301
00:19:06,103 --> 00:19:08,275
A STEEL END BRACKET IS NEXT.
302
00:19:08,275 --> 00:19:11,103
IT ALIGNS THE ROTOR
AND THE STATOR.
303
00:19:14,724 --> 00:19:17,413
HE FORCES THE BRACKET
INTO PLACE.
304
00:19:20,379 --> 00:19:24,034
TO SECURE THE ALIGNMENT,
HE INSTALLS FOUR LONG BOLTS
305
00:19:24,034 --> 00:19:27,379
FROM THE END BRACKET
TO THE ENGINE-ADAPTER PLATE.
306
00:19:28,724 --> 00:19:32,344
HE ANCHORS THE STATOR AND ROTOR
TO THE GENERATOR BASE
307
00:19:32,344 --> 00:19:34,896
AND ADDS SPECIAL RUBBER MOUNTS
UNDER THE SUPPORTS
308
00:19:34,896 --> 00:19:37,137
TO BUFFER VIBRATIONS.
309
00:19:37,137 --> 00:19:40,413
HE ATTACHES
A MOTORIZED CARBON BRUSH
310
00:19:40,413 --> 00:19:42,689
TO COPPER RINGS
ON THE ROTOR SHAFT.
311
00:19:42,689 --> 00:19:45,448
THE BRUSH WILL COLLECT
ELECTRICITY FROM THE SHAFT
312
00:19:45,448 --> 00:19:48,413
AND TRANSFER IT
TO THE GENERATOR CONTROLLER.
313
00:19:48,413 --> 00:19:51,586
HE SECURES IT TO THE END BRACKET
WITH SCREWS.
314
00:19:51,586 --> 00:19:54,241
HE CONNECTS THE WIRING HARNESS
315
00:19:54,241 --> 00:19:58,034
THAT MOVES ELECTRICITY FROM
THE BRUSH TO THE CONTROLLER.
316
00:20:00,896 --> 00:20:04,000
HE LINKS THE OTHER END
OF THE HARNESS TO THE ENGINE.
317
00:20:07,724 --> 00:20:10,655
HE PLUGS IN A SENSOR
TO MONITOR OIL PRESSURE
318
00:20:10,655 --> 00:20:13,758
AND MAKES ALL THE OTHER
ELECTRICAL CONNECTIONS.
319
00:20:16,586 --> 00:20:21,758
NEXT UP IS A PANEL THROUGH WHICH
HE RUNS SOME OF THE WIRING.
320
00:20:21,758 --> 00:20:24,586
IT ACTS AS A SEPARATOR
TO PREVENT ENTANGLEMENTS
321
00:20:24,586 --> 00:20:27,344
AND ALSO SUPPORTS
THE FUEL REGULATOR.
322
00:20:31,172 --> 00:20:35,034
OTHER PARTS INCLUDE A MUFFLER
TO HELP DAMPEN ENGINE NOISE
323
00:20:35,034 --> 00:20:38,241
AND A CONTROLLER
THAT CONVERTS GENERATED POWER
324
00:20:38,241 --> 00:20:39,689
TO THE CORRECT VOLTAGE.
325
00:20:42,482 --> 00:20:45,896
THE ASSEMBLY OF THIS
STANDBY GENERATOR IS COMPLETE.
326
00:20:45,896 --> 00:20:47,517
THE TECHNICIAN FUELS UP
327
00:20:47,517 --> 00:20:51,034
AND RUNS IT FIRST
AT PARTIAL CAPACITY,
328
00:20:51,034 --> 00:20:53,862
THEN TO THE MAX.
329
00:20:53,862 --> 00:20:57,137
THE TEST CONFIRMS THERE'S NO
WAVERING IN ELECTRICAL OUTPUT.
330
00:20:59,896 --> 00:21:01,172
ONCE ENCASED
331
00:21:01,172 --> 00:21:04,448
IN A NEUTRAL-COLORED
CORROSION-RESISTANT SHELL,
332
00:21:04,448 --> 00:21:08,068
THE STANDBY GENERATOR
BLENDS INTO THE BACKGROUND,
333
00:21:08,068 --> 00:21:09,793
BUT IN A POWER OUTAGE,
334
00:21:09,793 --> 00:21:13,034
ITS CONTRIBUTION
WILL DEFINITELY BE NOTICED.
335
00:21:22,172 --> 00:21:24,896
IF YOU HAVE ANY COMMENTS
ABOUT THE SHOW,
336
00:21:24,896 --> 00:21:27,689
OR IF YOU'D LIKE TO SUGGEST
TOPICS FOR FUTURE SHOWS,
337
00:21:27,689 --> 00:21:30,137
DROP US A LINE AT...
27358
Can't find what you're looking for?
Get subtitles in any language from opensubtitles.com, and translate them here.