Would you like to inspect the original subtitles? These are the user uploaded subtitles that are being translated:
1
00:00:02,965 --> 00:00:05,862
--Captions by VITAC--
www.vitac.com
2
00:00:05,862 --> 00:00:08,758
CAPTIONS PAID FOR BY
DISCOVERY COMMUNICATIONS
3
00:00:52,551 --> 00:00:54,655
Narrator:
THEY'RE CALLED MINI G.P.s --
4
00:00:54,655 --> 00:00:57,655
PINT-SIZED MOTORCYCLES
WHOSE DESIGN IS IDENTICAL
5
00:00:57,655 --> 00:00:59,344
TO THAT OF
THE FULL-SIZE MOTORBIKES
6
00:00:59,344 --> 00:01:02,689
THAT RACE ON
THE GRAND PRIX CIRCUIT.
7
00:01:02,689 --> 00:01:06,137
MINI G.P.s ARE DESIGNED
FOR KIDS 9 TO 12 YEARS OLD
8
00:01:06,137 --> 00:01:09,448
WHO ASPIRE TO ONE DAY
RACE THE BIG BIKES.
9
00:01:15,103 --> 00:01:19,000
A MINI G.P. CAN REACH SPEEDS
OF 80 MILES PER HOUR.
10
00:01:22,689 --> 00:01:24,655
ITS CHASSIS
IS MADE OF STEEL TUBING,
11
00:01:24,655 --> 00:01:26,551
TO WHICH THEY MOUNT
THE HANDLEBARS
12
00:01:26,551 --> 00:01:30,379
ALONG WITH THE CLUTCH
AND BRAKE LEVERS.
13
00:01:30,379 --> 00:01:33,965
AT BOTH THE FRONT AND BACK OF
THE CHASSIS, THEY ATTACH A FORK.
14
00:01:33,965 --> 00:01:36,413
THEN, BETWEEN EACH FORK
AND THE CHASSIS,
15
00:01:36,413 --> 00:01:38,344
THEY MOUNT A SHOCK ABSORBER.
16
00:01:44,000 --> 00:01:48,068
WITH A STEEL PIN,
THEY MOUNT A WHEEL ON EACH FORK.
17
00:01:48,068 --> 00:01:51,551
THE BLACK CIRCLE AT THE CENTER
IS A BRAKE DISK.
18
00:01:54,068 --> 00:01:57,034
NEXT, THEY INSTALL
A BRAKE CALIPER ON EACH WHEEL.
19
00:01:57,034 --> 00:01:59,344
WHEN THE RIDER
APPLIES THE BRAKES,
20
00:01:59,344 --> 00:02:03,310
THE CALIPER GRABS THE BRAKE
DISK, IMMOBILIZING THE WHEEL.
21
00:02:03,310 --> 00:02:06,689
NOW MECHANICS BEGIN ASSEMBLING
THE ENGINE BLOCK.
22
00:02:06,689 --> 00:02:09,793
USING A SPECIAL TOOL,
THEY INSTALL BEARINGS
23
00:02:09,793 --> 00:02:11,793
THAT ENABLE THE GEAR SHAFTS
TO TURN.
24
00:02:17,344 --> 00:02:19,448
THE ENGINE HAS SIX GEARS,
25
00:02:19,448 --> 00:02:23,241
EACH OF WHICH IS COMPRISED
OF SEVERAL STEEL GEARS.
26
00:02:23,241 --> 00:02:26,586
THESE GO INTO THE GEARBOX.
27
00:02:26,586 --> 00:02:28,344
NEXT COMES THE GEAR SHIFTER.
28
00:02:28,344 --> 00:02:30,965
IT CONNECTS THE GEARS
TO THE GEAR PEDAL
29
00:02:30,965 --> 00:02:34,827
THAT THE RIDER OPERATES
WITH HIS FOOT.
30
00:02:34,827 --> 00:02:37,172
NEXT THEY INSTALL
THE CRANKSHAFT.
31
00:02:37,172 --> 00:02:40,000
THE COMBUSTION CYCLE
ROTATES THE CRANKSHAFT,
32
00:02:40,000 --> 00:02:42,862
WHICH TURNS THE GEARS.
33
00:02:42,862 --> 00:02:45,275
THEY CLOSE UP THAT SIDE
OF THE ENGINE
34
00:02:45,275 --> 00:02:48,206
AND ASSEMBLE AND INSTALL
THE DESMODROMIC SPRING.
35
00:02:48,206 --> 00:02:50,034
WHEN THE RIDER SELECTS A GEAR,
36
00:02:50,034 --> 00:02:52,448
THIS SPRING KEEPS IT
LOCKED IN POSITION
37
00:02:52,448 --> 00:02:55,000
UNTIL THE RIDER SWITCHES GEARS.
38
00:02:57,413 --> 00:03:00,655
THE ENGINE TURNS A DRIVESHAFT
THAT, VIA THIS PINION GEAR,
39
00:03:00,655 --> 00:03:04,724
MOVES A CHAIN
THAT TURNS THE REAR WHEEL.
40
00:03:04,724 --> 00:03:06,413
ON THE OTHER SIDE OF THE ENGINE,
41
00:03:06,413 --> 00:03:08,137
THEY ASSEMBLE THE PRIMARY COUPLE
42
00:03:08,137 --> 00:03:10,862
AND THE VARIOUS COMPONENTS
THAT GO INTO THE CLUTCH,
43
00:03:10,862 --> 00:03:13,275
SUCH AS CLUTCH PLATES
44
00:03:13,275 --> 00:03:16,862
AND THE SPRINGS THAT STOP
AND START CLUTCH MOVEMENT.
45
00:03:24,586 --> 00:03:27,172
WHEN COMBUSTION DRIVES
THE PISTON UP AND DOWN,
46
00:03:27,172 --> 00:03:29,689
IT ROTATES THE CRANKSHAFT.
47
00:03:29,689 --> 00:03:34,241
THE PRIMARY COUPLE TRANSMITS
POWER TO THE GEARBOX AND CLUTCH.
48
00:03:34,241 --> 00:03:36,724
THIS IS A ONE-CYLINDER ENGINE.
49
00:03:36,724 --> 00:03:39,931
THEY INSTALL THE PISTON
THAT DRIVES THE CRANKSHAFT,
50
00:03:39,931 --> 00:03:42,724
THEN MOUNT THE CYLINDER
OVER THE PISTON.
51
00:03:50,172 --> 00:03:52,758
THEY CLOSE UP THE CYLINDER
WITH A CYLINDER HEAD,
52
00:03:52,758 --> 00:03:55,689
THEN MOUNT THE SPARK PLUG
THAT IGNITES THE FUEL MIXTURE,
53
00:03:55,689 --> 00:03:58,482
DRIVING THE PISTON UP AND DOWN.
54
00:03:58,482 --> 00:04:02,000
A HEAD COVER
CLOSES EVERYTHING UP.
55
00:04:02,000 --> 00:04:04,482
NEXT THEY INSTALL THE IGNITION.
56
00:04:04,482 --> 00:04:08,068
IT CONSISTS OF TWO MAGNETS
CALLED A ROTOR AND A STATOR.
57
00:04:08,068 --> 00:04:11,586
WHEN THE ROTOR TURNS, IT
GENERATES AN ELECTRICAL CHARGE
58
00:04:11,586 --> 00:04:13,965
THAT SETS OFF THE SPARK PLUG.
59
00:04:16,275 --> 00:04:18,620
TIME TO INSTALL
THE FINISHED ENGINE.
60
00:04:18,620 --> 00:04:20,724
THEY MOUNT IT TO THE CHASSIS
WITH SUPPORT PINS,
61
00:04:20,724 --> 00:04:22,586
FRONT AND BACK.
62
00:04:28,310 --> 00:04:29,965
NEXT THEY INSTALL THE WATER PUMP
63
00:04:29,965 --> 00:04:32,206
THAT PREVENTS THE ENGINE
FROM OVERHEATING
64
00:04:32,206 --> 00:04:35,551
ALONG WITH THE BELT
THAT DRIVES THE PUMP.
65
00:04:37,275 --> 00:04:39,034
THEN THEY MOUNT THE CARBURETOR.
66
00:04:39,034 --> 00:04:41,344
IT MIXES THE FUEL
ENTERING THE ENGINE
67
00:04:41,344 --> 00:04:43,896
WITH JUST THE RIGHT AMOUNT
OF AIR.
68
00:04:43,896 --> 00:04:46,724
NEXT THEY INSTALL
THE AIR FILTER.
69
00:04:46,724 --> 00:04:50,241
IT KEEPS OUT DEBRIS
THAT WOULD CLOG THE ENGINE.
70
00:04:50,241 --> 00:04:52,000
NOW THE EXHAUST PIPE,
71
00:04:52,000 --> 00:04:53,344
THE FUEL TANK,
72
00:04:53,344 --> 00:04:54,482
THE SEAT,
73
00:04:54,482 --> 00:04:55,655
AND FAIRING,
74
00:04:55,655 --> 00:04:58,793
A PLASTIC ENCLOSURE
THAT SHIELDS THE DRIVER.
75
00:05:02,137 --> 00:05:04,103
THE FINAL COMPONENT IS THE CHAIN
76
00:05:04,103 --> 00:05:07,379
CONNECTING THE DRIVESHAFT
TO THE REAR WHEEL.
77
00:05:14,344 --> 00:05:16,241
THE ENGINE TURNS THE SHAFT,
78
00:05:16,241 --> 00:05:18,034
WHICH TURNS THIS CHAIN,
79
00:05:18,034 --> 00:05:19,724
WHICH ROTATES THE REAR WHEEL.
80
00:05:27,551 --> 00:05:30,344
MINI G.P.s COME IN
DIFFERENT SIZES.
81
00:05:30,344 --> 00:05:35,000
THIS PARTICULAR MODEL HAS
A 50cc, 14-HORSEPOWER ENGINE.
82
00:05:35,000 --> 00:05:38,241
PRETTY IMPRESSIVE
FOR A KID'S MOTORCYCLE.
83
00:05:51,172 --> 00:05:54,137
Narrator: THE FIG COOKIE IS
ONE OF LIFE'S SWEET MYSTERIES.
84
00:05:54,137 --> 00:05:56,448
WHO HASN'T WONDERED
HOW THEY GET THE FIGS
85
00:05:56,448 --> 00:05:58,689
IN THAT SEAMLESS PASTRY WRAP?
86
00:05:58,689 --> 00:06:02,310
IT TURNS OUT THAT THE AUTOMATED
SYSTEM FOR PRODUCING FIG COOKIES
87
00:06:02,310 --> 00:06:04,965
ACTUALLY DATES BACK TO 1891,
88
00:06:04,965 --> 00:06:08,758
AND IT'S WHAT MAKES THE
FIG COOKIE A SNACKING SUCCESS.
89
00:06:14,103 --> 00:06:16,931
FIG COOKIES ARE A MODERN WAY
OF PACKAGING A FRUIT
90
00:06:16,931 --> 00:06:19,551
WHICH HAS BEEN CONSUMED
FOR MILLENNIA.
91
00:06:21,965 --> 00:06:25,620
MAKING THE FIG COOKIE'S PASTRY
WRAP BEGINS WITH BAGS OF SUGAR,
92
00:06:25,620 --> 00:06:29,241
WHICH THEY EMPTY
INTO A BIG MIXER.
93
00:06:29,241 --> 00:06:31,551
A COUPLE OF BUCKETS
OF CORN SYRUP FOLLOW.
94
00:06:33,275 --> 00:06:36,000
THEN THEY ADD
AN EMULSIFIER CALLED LECITHIN
95
00:06:36,000 --> 00:06:38,000
AND SOME VANILLA FLAVORING.
96
00:06:40,275 --> 00:06:43,137
THE BOWL TILTS UP
FOR A QUICK MIXING.
97
00:06:44,827 --> 00:06:47,000
A WORKER ADDS
ORGANIC BREAD FLOUR
98
00:06:47,000 --> 00:06:50,413
AND LEAVENING INGREDIENTS
TO THE MIX.
99
00:06:50,413 --> 00:06:52,758
THEY REACTIVATE THE MIXER,
100
00:06:52,758 --> 00:06:56,000
WHICH BLENDS EVERYTHING
INTO A THICK, STICKY BATTER.
101
00:06:58,034 --> 00:06:59,517
ONCE PROPERLY MIXED,
102
00:06:59,517 --> 00:07:02,965
THEY TRANSFER THE BATTER
INTO A LARGE HOLDING TANK.
103
00:07:06,551 --> 00:07:09,517
MEANWHILE,
THEY PREPARE THE FIG FILLING.
104
00:07:09,517 --> 00:07:12,931
A WORKER LOADS BIG BLOCKS
OF FIGS INTO A MIXER,
105
00:07:12,931 --> 00:07:15,413
THEN ADDS A GENEROUS AMOUNT
OF CRUMBLED COOKIES
106
00:07:15,413 --> 00:07:18,413
FOR TEXTURE AND FLAVOR.
107
00:07:23,137 --> 00:07:25,137
THEY MIX THE TWO INGREDIENTS,
108
00:07:25,137 --> 00:07:29,068
THEN POUR IN CORN SYRUP
TO ADD MOISTURE AND SWEETNESS.
109
00:07:29,068 --> 00:07:33,482
THEY ADD SOME SALT AND GIVE
THE BATCH ANOTHER QUICK MIX.
110
00:07:35,034 --> 00:07:39,724
THEY SWEETEN THE FIG MIX SOME
MORE BY ADDING PLENTY OF SUGAR.
111
00:07:39,724 --> 00:07:43,724
AND NOW THE JAM FOR THE CENTER
OF THE FIG COOKIE IS COMPLETE.
112
00:07:45,965 --> 00:07:49,172
THE FIG JAM AND THE PASTRY
ARE NOW POSITIONED FOR A MERGER.
113
00:07:50,758 --> 00:07:52,379
IT WILL BE A NEAT TRICK,
114
00:07:52,379 --> 00:07:55,275
AND A SPECIAL PIECE OF EQUIPMENT
MAKES IT POSSIBLE.
115
00:07:58,000 --> 00:08:01,000
IT'S ESSENTIALLY A FUNNEL
WITHIN A FUNNEL.
116
00:08:01,000 --> 00:08:04,241
ROLLERS PRESS THE JAM
THROUGH THE INNER FUNNEL
117
00:08:04,241 --> 00:08:06,931
WHILE PUSHING THE PASTRY
THROUGH THE OUTER ONE,
118
00:08:06,931 --> 00:08:10,620
ENCASING THE FIG FILLING
IN A SEAMLESS PASTRY JACKET.
119
00:08:16,655 --> 00:08:19,137
HERE'S THE PROCESS IN ACTION.
120
00:08:19,137 --> 00:08:22,206
THE SYSTEM GENERATES LONG ROWS
OF FIG-FILLED DOUGH,
121
00:08:22,206 --> 00:08:26,172
AND THAT'S HOW THEY GET
THE FIG JAM IN THE PASTRY.
122
00:08:30,931 --> 00:08:34,034
NEXT A TECHNICIAN
CARVES THROUGH THE DOUGH
123
00:08:34,034 --> 00:08:36,965
AND REMOVES A FEW UNCOOKED
FIG COOKIES.
124
00:08:39,931 --> 00:08:42,000
IT'S TIME FOR A QUICK WEIGH-IN.
125
00:08:42,000 --> 00:08:44,896
THIS CONFIRMS
THAT THIS BATCH OF FIG COOKIES
126
00:08:44,896 --> 00:08:48,586
WILL BE EXACTLY THE RIGHT SIZE.
127
00:08:48,586 --> 00:08:52,103
NOW IT'S INTO AN OVEN THAT'S
LONGER THAN A BOWLING ALLEY.
128
00:08:52,103 --> 00:08:55,931
IT BAKES AND BROWNS
THE FIG-FILLED RIBBONS OF DOUGH.
129
00:09:03,482 --> 00:09:06,379
HERE, A ROLLER COMPRESSES
THE BAKED COOKIES
130
00:09:06,379 --> 00:09:10,137
SO THEY'LL FIT INTO
PACKAGES LATER.
131
00:09:10,137 --> 00:09:11,689
AN ULTRASONIC FREQUENCY
132
00:09:11,689 --> 00:09:14,310
MAKES THIS BLADE VIBRATE
FOR A CLEAN CUT
133
00:09:14,310 --> 00:09:18,620
AS IT CARVES THE ROWS OF
FIG-FILLED PASTRY INTO COOKIES.
134
00:09:18,620 --> 00:09:21,896
THE FIG COOKIES ARE STILL
A BIT WARM FROM BAKING,
135
00:09:21,896 --> 00:09:25,068
SO THEY NOW CHILL OUT
ON A TRIP THROUGH A FREEZER.
136
00:09:25,068 --> 00:09:26,206
THIS COOLDOWN
137
00:09:26,206 --> 00:09:28,379
AVOIDS CONDENSATION PROBLEMS
AFTER PACKAGING,
138
00:09:28,379 --> 00:09:30,896
PREVENTING MOLD GROWTH.
139
00:09:33,862 --> 00:09:37,103
THE TRIP THROUGH THE FREEZER
ALSO FIRMS UP THE FIG COOKIES
140
00:09:37,103 --> 00:09:40,137
SO THEY'RE LESS LIKELY
TO CRUMBLE DURING HANDLING.
141
00:09:44,586 --> 00:09:46,034
AS SHE PACKS THEM,
142
00:09:46,034 --> 00:09:49,000
THIS WORKER EXAMINES EACH
FIG COOKIE FOR IMPERFECTIONS,
143
00:09:49,000 --> 00:09:53,241
AND THERE'S NOT ONE REJECT
IN THE LOT.
144
00:09:58,655 --> 00:10:00,482
THE NEXT STEP IS PACKAGING,
145
00:10:00,482 --> 00:10:03,379
WHERE A MACHINE PARCELS UP
THE SNACKS.
146
00:10:03,379 --> 00:10:06,000
IT MOVES TRAYS FULL
OF FIG COOKIES
147
00:10:06,000 --> 00:10:08,206
INTO A SLEEVE OF METALLIC FILM.
148
00:10:13,206 --> 00:10:17,931
FINALLY, ROTATING JAWS HEAT-SEAL
THE PACKAGE AT BOTH ENDS.
149
00:10:24,827 --> 00:10:29,000
IT'S TAKEN ABOUT AN HOUR TO MAKE
THIS PACKAGE OF FIG BARS,
150
00:10:29,000 --> 00:10:31,482
AND IT'S ABOUT TIME
FOR A SNACK BREAK.
151
00:10:31,482 --> 00:10:32,931
IF THE CROWD IS HUNGRY,
152
00:10:32,931 --> 00:10:35,689
THE WHOLE PACKAGE
COULD BE GONE IN MINUTES,
153
00:10:35,689 --> 00:10:38,724
BUT THAT'S THE WAY
THE COOKIE CRUMBLES.
154
00:10:50,482 --> 00:10:53,000
Narrator: THINKING INSIDE
THE BOX CAN BE A GOOD THING
155
00:10:53,000 --> 00:10:55,068
IF YOU WANT TO ORGANIZE
YOUR TOOLS,
156
00:10:55,068 --> 00:10:58,000
AND OF COURSE WE'RE REFERRING
TO THE TOOLBOX.
157
00:10:58,000 --> 00:11:00,620
PROPER TOOL STORAGE
KEEPS ANY WORK SITE
158
00:11:00,620 --> 00:11:02,965
RUNNING SMOOTHLY
AND EFFICIENTLY,
159
00:11:02,965 --> 00:11:05,965
AND TODAY YOU CAN REALLY GO BIG
ON THE CONCEPT
160
00:11:05,965 --> 00:11:09,344
WITH UNITS DESIGNED
FOR MECHANICS AND OTHER PROS.
161
00:11:13,827 --> 00:11:15,724
WITH A PROFESSIONAL TOOLBOX,
162
00:11:15,724 --> 00:11:18,862
YOU'LL NEVER HAVE TO RUMMAGE
AROUND FOR THE TOOL YOU NEED.
163
00:11:18,862 --> 00:11:21,172
THERE'S A PLACE
FOR PRACTICALLY EVERYTHING
164
00:11:21,172 --> 00:11:23,551
IN ONE OF THESE MEGA
TOOL CHESTS.
165
00:11:26,344 --> 00:11:29,620
IT STARTS WITH A COIL
OF HEAVY-DUTY STEEL.
166
00:11:29,620 --> 00:11:34,000
IT UNWINDS INTO A PUNCH PRESS
THAT CUTS THE METAL INTO PANELS
167
00:11:34,000 --> 00:11:37,034
AND PUNCHES HOLES
FOR LATER ASSEMBLY.
168
00:11:39,931 --> 00:11:41,379
EACH OF THESE PANELS
169
00:11:41,379 --> 00:11:44,310
WILL BE TRANSFORMED INTO
A TOOLBOX DRAWER.
170
00:11:46,827 --> 00:11:50,724
THEY FEED THE PANELS INTO
AN AUTOMATED BENDING MACHINE.
171
00:11:50,724 --> 00:11:52,724
IT FOLDS THEM ON THREE SIDES
172
00:11:52,724 --> 00:11:55,862
TO CREATE THE BACK
AND SIDES OF THE DRAWER.
173
00:11:58,551 --> 00:12:00,655
IT ALSO FOLDS OVER THE RIM.
174
00:12:00,655 --> 00:12:04,551
THIS ADDS STRENGTH TO THE DRAWER
AND GIVES IT A SMOOTH EDGE.
175
00:12:08,310 --> 00:12:11,586
THE ASSEMBLER SLIDES
THE FRONT PANEL ONTO THE DRAWER,
176
00:12:11,586 --> 00:12:14,724
THEN AN AUTOMATED WELDING GUN
REINFORCES THE SEAMS
177
00:12:14,724 --> 00:12:17,379
AND SECURES PART
OF THE LOCK MECHANISM.
178
00:12:20,931 --> 00:12:22,827
TO BUILD THE TOOLBOX CABINET,
179
00:12:22,827 --> 00:12:28,379
A WORKER ARRANGES STIFFENERS AND
LOCK-BAR GRIDS ON THE BACK WALL.
180
00:12:28,379 --> 00:12:33,793
THEN IT'S OVER TO A LINEUP
OF COMPUTERIZED WELDING GUNS.
181
00:12:33,793 --> 00:12:38,000
THESE GUNS FUSE THE STIFFENERS
AND GRIDS TO THE PANEL.
182
00:12:38,000 --> 00:12:40,344
EACH PART GETS NUMEROUS WELDS
183
00:12:40,344 --> 00:12:44,448
TO ENSURE THE UNIT
REALLY HOLDS UP.
184
00:12:44,448 --> 00:12:47,000
THE CABINET'S SIDE WALLS
ARE NEXT.
185
00:12:47,000 --> 00:12:49,448
WORKERS PROP THEM UP
WITH SUPPORTS
186
00:12:49,448 --> 00:12:52,344
AS THEY WELD THE PANELS
TO THE BACK WALL.
187
00:12:56,379 --> 00:12:59,448
WITH THE TOOLBOX RIGHT SIDE UP,
THEY INSTALL THE TOP.
188
00:13:04,034 --> 00:13:06,068
THEY TURN THE CABINET AROUND
189
00:13:06,068 --> 00:13:07,827
AND, WORKING FROM
THE OPEN FRONT,
190
00:13:07,827 --> 00:13:10,655
SLIDE THE LOCK BARS
INTO THEIR SLOTS.
191
00:13:13,724 --> 00:13:15,931
THEY THEN BUILD
THE FRONT FRAMEWORK
192
00:13:15,931 --> 00:13:19,172
AND WELD LEDGES FOR THE DRAWERS
TO THE SUPPORT GRID.
193
00:13:21,689 --> 00:13:24,379
THEY ADD A PANEL
TO THE BOTTOM END OF THE CABINET
194
00:13:24,379 --> 00:13:26,862
AND WELD THE ENTIRE PERIMETER.
195
00:13:30,896 --> 00:13:32,896
NOW IT'S INTO THE PAINT BOOTH,
196
00:13:32,896 --> 00:13:36,896
WHERE SPRAY GUNS COAT EVERYTHING
IN A LAYER OF POWDER PAINT.
197
00:13:36,896 --> 00:13:39,758
THE PAINT IS TOUGH
AND SOLVENT-RESISTANT
198
00:13:39,758 --> 00:13:43,896
SO IT WILL HOLD UP TO OIL SPILLS
IN A GARAGE ENVIRONMENT.
199
00:13:48,896 --> 00:13:51,137
THEY INSTALL THE REST
OF THE LOCKING MECHANISMS
200
00:13:51,137 --> 00:13:53,551
ON THE FRONT OF THE CABINET.
201
00:13:53,551 --> 00:13:58,655
THEN, USING A GUIDE, PRESS THE
ADHESIVE-BACKED LOGO INTO PLACE.
202
00:14:01,034 --> 00:14:02,862
THEY NOW SNAP THE DRAWER SLIDES
203
00:14:02,862 --> 00:14:05,793
INTO HOLES
ON THE CABINET'S SIDE WALLS.
204
00:14:05,793 --> 00:14:09,586
THESE SLIDES ARE EQUIPPED
WITH ROLLER BEARINGS
205
00:14:09,586 --> 00:14:13,172
THAT WILL ENABLE THE DRAWERS
TO OPEN AND CLOSE SMOOTHLY.
206
00:14:17,448 --> 00:14:19,068
HERE THEY MAKE USE OF THE HOLES
207
00:14:19,068 --> 00:14:23,344
PUNCHED INTO THE DRAWERS
EARLIER.
208
00:14:23,344 --> 00:14:27,137
A QUICK CLICK, AND THE DRAWERS
ARE FASTENED TO THE SIDES.
209
00:14:31,896 --> 00:14:34,000
THE DRAWERS COME IN
A RANGE OF SIZES
210
00:14:34,000 --> 00:14:37,241
TO ACCOMMODATE TOOLS
OF DIFFERENT PROPORTIONS.
211
00:14:39,310 --> 00:14:42,517
THE SHALLOW COMPARTMENTS WILL
HOLD WRENCHES AND SCREWDRIVERS,
212
00:14:42,517 --> 00:14:46,896
WHILE THE LARGER ONES HAVE BEEN
MADE FOR THE BIG POWER TOOLS.
213
00:14:53,793 --> 00:14:56,379
WORKERS NOW ENCASE
THIS MEGA TOOL CHEST
214
00:14:56,379 --> 00:14:58,655
IN PLASTIC AND CARDBOARD.
215
00:15:00,655 --> 00:15:03,655
BUT THIS JOB
IS NOT QUITE WRAPPED UP.
216
00:15:03,655 --> 00:15:05,827
THEY TIP THE UNIT ON ITS SIDE
217
00:15:05,827 --> 00:15:08,965
AND SEND IT DOWN THE LINE
TO GET WHEELS.
218
00:15:08,965 --> 00:15:12,862
THE PREPACKAGING PREVENTS DENTS
AND SCRATCHES ALONG THE WAY.
219
00:15:14,758 --> 00:15:18,000
A WORKER BOLTS CASTERS
ON EACH CORNER OF THE CABINET
220
00:15:18,000 --> 00:15:20,896
TO ALLOW IT TO BE EASILY
MOVED AROUND IN A GARAGE
221
00:15:20,896 --> 00:15:23,344
OR ANY OTHER WORK SITE.
222
00:15:23,344 --> 00:15:26,275
ADD-ONS CAN BE PURCHASED
FOR THESE TOOL CHESTS,
223
00:15:26,275 --> 00:15:29,413
SO THE STORAGE POSSIBILITIES
ARE VIRTUALLY ENDLESS.
224
00:15:29,413 --> 00:15:31,620
THAT'S AN ORGANIZATIONAL
APPROACH
225
00:15:31,620 --> 00:15:34,344
YOU CAN'T REALLY MESS WITH.
226
00:15:49,413 --> 00:15:52,689
Narrator: NATURAL GAS
AND CRUDE OIL TRAVEL WORLDWIDE
227
00:15:52,689 --> 00:15:55,413
THROUGH UNDERGROUND
AND UNDERSEA PIPELINES.
228
00:15:55,413 --> 00:15:56,620
THESE RUGGED PIPES
229
00:15:56,620 --> 00:15:59,034
ARE MANUFACTURED
IN STRAIGHT LENGTHS,
230
00:15:59,034 --> 00:16:02,689
BUT OF COURSE A PIPELINE'S ROUTE
NEVER RUNS IN A STRAIGHT LINE,
231
00:16:02,689 --> 00:16:05,034
SO EVERY TURN
OR CHANGE IN ELEVATION
232
00:16:05,034 --> 00:16:07,931
REQUIRES A PIECE OF PIPE
THAT'S BENT.
233
00:16:11,655 --> 00:16:14,827
THIS FACTORY SPECIALIZES
IN BENDING STEEL PIPE,
234
00:16:14,827 --> 00:16:19,068
WHICH IS MANUFACTURED
IN STRAIGHT LENGTHS.
235
00:16:19,068 --> 00:16:22,172
A PIECE OF PIPE
IS TYPICALLY 40 FEET LONG
236
00:16:22,172 --> 00:16:24,000
AND WEIGHS UP TO 20 TONS,
237
00:16:24,000 --> 00:16:25,448
SO WORKERS USE A CRANE
238
00:16:25,448 --> 00:16:28,206
TO MOVE IT FROM ONE OPERATION
TO THE NEXT.
239
00:16:31,827 --> 00:16:35,103
THE FIRST STOP IS A BLASTING
MACHINE THAT CLEANS THE PIPE.
240
00:16:39,586 --> 00:16:41,000
TO HEAT AND BEND PROPERLY,
241
00:16:41,000 --> 00:16:43,724
THE SURFACE MUST BE CLEAN
AND UNIFORM,
242
00:16:43,724 --> 00:16:47,241
BUT PIPE USUALLY ARRIVES
AT THE PLANT DIRTY
243
00:16:47,241 --> 00:16:49,379
AND WEARING A COAT OF VARNISH
TO PREVENT RUSTING
244
00:16:49,379 --> 00:16:51,413
DURING TRANSPORT AND STORAGE.
245
00:16:55,137 --> 00:16:58,448
THE BLASTING MACHINE SHOOTS
GRAINS OF STEEL AT HIGH PRESSURE
246
00:16:58,448 --> 00:17:01,793
FOR ABOUT AN HOUR.
247
00:17:01,793 --> 00:17:05,793
THE PIPE EXITS WITH ITS SURFACE
NOW CLEAN AND SMOOTH.
248
00:17:07,862 --> 00:17:10,551
FROM THE BLASTER,
IT'S ON TO THE BLENDER,
249
00:17:10,551 --> 00:17:13,793
WHICH HEATS THE PIPE TO ABOUT
1,800 DEGREES FAHRENHEIT,
250
00:17:13,793 --> 00:17:17,379
THEN MAKES THE BEND.
251
00:17:17,379 --> 00:17:21,827
A TECHNICIAN INSTALLS
THE INDUCTION-HEATING COIL.
252
00:17:21,827 --> 00:17:24,448
INDUCTION HEATING ALLOWS
GREATER TEMPERATURE CONTROL,
253
00:17:24,448 --> 00:17:28,344
WHICH IS KEY TO PRESERVING
THE QUALITY OF THE STEEL.
254
00:17:28,344 --> 00:17:31,551
THE COIL DOESN'T ACTUALLY
TOUCH THE PIPE,
255
00:17:31,551 --> 00:17:34,655
BECAUSE THAT WOULD CAUSE
A SHORT CIRCUIT.
256
00:17:34,655 --> 00:17:38,586
NEXT THEY CLAMP A PIVOTING ARM
TO ONE END OF THE PIPE,
257
00:17:38,586 --> 00:17:41,448
THEN POWER UP THE COIL.
258
00:17:41,448 --> 00:17:46,206
THIS GENERATES A MAGNETIC FIELD
THAT PRODUCES INTENSE HEAT.
259
00:17:46,206 --> 00:17:49,241
COLD-WATER JETS CONFINE IT
TO THE TARGET AREA.
260
00:17:52,724 --> 00:17:55,241
AS A TECHNICIAN MONITORS
AND MEASURES,
261
00:17:55,241 --> 00:17:56,724
THE ARM PULLS THE PIPE
262
00:17:56,724 --> 00:17:58,896
THROUGH THE HOT COIL
AT A SPECIFIC SPEED,
263
00:17:58,896 --> 00:18:03,620
CURVING THE SOFTENED STEEL
TO THE SAME ANGLE.
264
00:18:03,620 --> 00:18:06,517
WATER COOLS THE PIPE
AT A CONTROLLED RATE,
265
00:18:06,517 --> 00:18:10,413
A PROCESS CALLED QUENCHING.
266
00:18:10,413 --> 00:18:13,344
THEY MUST CONTROL HEATING
AND COOLING PRECISELY.
267
00:18:13,344 --> 00:18:16,068
OTHERWISE,
THE STEEL WILL WEAKEN.
268
00:18:20,931 --> 00:18:23,655
ONCE THE PIPE EXITS THE BENDER,
269
00:18:23,655 --> 00:18:26,379
WORKERS VERIFY THE ANGLE AGAIN.
270
00:18:29,448 --> 00:18:32,206
THEY ALSO VERIFY
THE PIPE'S DIMENSIONS
271
00:18:32,206 --> 00:18:34,793
TO MAKE SURE THE BENDING PROCESS
DIDN'T DISTORT THEM.
272
00:18:39,862 --> 00:18:42,103
NOW THEY CUT OFF
THE STRAIGHT ENDS,
273
00:18:42,103 --> 00:18:44,655
LEAVING JUST THE CURVED PORTION.
274
00:18:58,310 --> 00:19:01,758
NEXT THE PIPES GO INTO
A FURNACE FOR TEMPERING,
275
00:19:01,758 --> 00:19:04,724
A 10-HOUR REHEATING
AND COOLING CYCLE.
276
00:19:04,724 --> 00:19:08,655
THIS RELIEVES STRESS IN
THE STEEL THAT BENDING CREATED.
277
00:19:11,206 --> 00:19:14,448
AFTER TEMPERING,
PIPES DESIGNED TO GO UNDERWATER
278
00:19:14,448 --> 00:19:16,965
GO THROUGH A SECOND QUENCHING.
279
00:19:16,965 --> 00:19:19,379
THIS GIVES THE STEEL
THE RIGHT PROPERTIES
280
00:19:19,379 --> 00:19:22,310
TO WITHSTAND
DEEP-SEAWATER PRESSURE.
281
00:19:25,482 --> 00:19:28,068
THEN, USING AN ULTRASONIC GAUGE,
282
00:19:28,068 --> 00:19:30,758
WORKERS MEASURE THE THICKNESS
OF THE PIPE WALLS,
283
00:19:30,758 --> 00:19:32,931
WHICH CHANGES WITH BENDING.
284
00:19:35,517 --> 00:19:38,034
AFTER ANOTHER TRIP
THROUGH THE BLAST CLEANER,
285
00:19:38,034 --> 00:19:40,241
WORKERS APPLY A LIQUID
THAT HIGHLIGHTS
286
00:19:40,241 --> 00:19:44,344
EVEN THE MOST MINUTE SURFACE
CRACKS THAT BENDING CAN INDUCE.
287
00:19:44,344 --> 00:19:47,241
IF THEY FIND CRACKS,
THEY SCRAP THE PIPE.
288
00:19:50,827 --> 00:19:53,586
BUT DEFECTS ARE RARE
BECAUSE THE FACTORY
289
00:19:53,586 --> 00:19:57,103
FIRST PERFORMS TEST BENDS
ON SAMPLE PIECES OF PIPE,
290
00:19:57,103 --> 00:20:01,965
THEN SUBJECTS THOSE SAMPLES
TO A BATTERY OF TESTS.
291
00:20:01,965 --> 00:20:04,827
THE LAB MEASURES DIMENSIONS
AND WALL THICKNESS,
292
00:20:04,827 --> 00:20:07,517
THEN TESTS HOW MUCH WEIGHT
THE SAMPLE CAN SUPPORT
293
00:20:07,517 --> 00:20:09,344
BEFORE COLLAPSING
294
00:20:09,344 --> 00:20:14,103
AND HOW MUCH STRETCHING IT CAN
WITHSTAND BEFORE SNAPPING.
295
00:20:21,482 --> 00:20:23,206
BACK ON THE FACTORY FLOOR,
296
00:20:23,206 --> 00:20:25,862
THE PIPE GOES THROUGH
ANOTHER BLASTING.
297
00:20:25,862 --> 00:20:27,275
THEN WORKERS HEAT IT
298
00:20:27,275 --> 00:20:30,655
AND SPRAY ON A PROTECTIVE
COATING THAT PREVENTS CORROSION.
299
00:20:30,655 --> 00:20:33,344
IT MELDS TO THE HOT PIPE.
300
00:20:33,344 --> 00:20:35,586
ONCE THE PIPE COOLS,
301
00:20:35,586 --> 00:20:38,793
THEY STENCIL ON
TECHNICAL SPECIFICATIONS.
302
00:20:38,793 --> 00:20:40,482
THEN THESE PIPE BENDS
303
00:20:40,482 --> 00:20:43,448
GO OFF TO JOIN
THEIR STRAIGHT COUNTERPARTS.
304
00:20:52,827 --> 00:20:55,068
IF YOU HAVE ANY COMMENTS
ABOUT THE SHOW,
305
00:20:55,068 --> 00:20:57,793
OR IF YOU'D LIKE TO SUGGEST
TOPICS FOR FUTURE SHOWS,
306
00:20:57,793 --> 00:20:59,931
DROP US A LINE AT...
24735
Can't find what you're looking for?
Get subtitles in any language from opensubtitles.com, and translate them here.