Would you like to inspect the original subtitles? These are the user uploaded subtitles that are being translated:
1
00:00:01,758 --> 00:00:04,655
--Captions by VITAC--
www.vitac.com
2
00:00:04,758 --> 00:00:07,724
CAPTIONS PAID FOR BY
DISCOVERY COMMUNICATIONS, LLC
3
00:00:21,931 --> 00:00:23,655
>> Narrator: TODAY ON
4
00:00:23,655 --> 00:00:25,896
"HOW IT'S MADE" -- AUTOMOTIVE
5
00:00:25,896 --> 00:00:30,862
FUEL PUMPS...
6
00:00:30,862 --> 00:00:36,862
CRICKET BATS...
7
00:00:36,862 --> 00:00:42,965
CHANGE MACHINES...
8
00:00:42,965 --> 00:00:45,172
CHANGE MACHINES...
AND DUCTILE-IRON PIPE.
9
00:00:45,172 --> 00:00:53,034
AND DUCTILE-IRON PIPE.
10
00:00:53,034 --> 00:00:54,965
WHEN YOU START YOUR CAR, IT
11
00:00:54,965 --> 00:00:57,103
ACTIVATES A PUMP THAT'S USUALLY
12
00:00:57,103 --> 00:00:59,068
LOCATED INSIDE THE GAS TANK.
13
00:00:59,068 --> 00:01:00,896
THIS ELECTRICAL SYSTEM PUSHES
14
00:01:00,896 --> 00:01:02,758
THE GAS OUT OF THE TANK AND INTO
15
00:01:02,758 --> 00:01:04,551
INJECTORS, WHICH AERATE THE GAS
16
00:01:04,551 --> 00:01:06,206
AND DELIVER IT TO THE ENGINE
17
00:01:06,206 --> 00:01:07,000
CYLINDERS.
18
00:01:07,000 --> 00:01:08,620
WITHOUT A PUMP TO GET THE FUEL
19
00:01:08,620 --> 00:01:10,344
FLOWING, YOUR CAR WOULD BE GOING
20
00:01:10,344 --> 00:01:17,724
NOWHERE FAST.
21
00:01:17,724 --> 00:01:19,482
YOU MIGHT THINK THAT SUBMERGING
22
00:01:19,482 --> 00:01:21,103
AN ELECTRIC PUMP IN GASOLINE
23
00:01:21,103 --> 00:01:22,689
WOULD BE A RISKY THING, BUT
24
00:01:22,689 --> 00:01:24,379
LIQUID FUEL CAN'T EXPLODE, SO
25
00:01:24,379 --> 00:01:26,137
IT'S ACTUALLY A VERY SAFE PLACE
26
00:01:26,137 --> 00:01:30,758
TO BE.
27
00:01:30,758 --> 00:01:32,241
PRODUCTION BEGINS WITH THE
28
00:01:32,241 --> 00:01:33,344
PUMPING MECHANISM.
29
00:01:33,344 --> 00:01:35,000
A GEAR AND SEVERAL ROLLERS ARE
30
00:01:35,000 --> 00:01:36,620
SANDWICHED BETWEEN TWO METAL
31
00:01:36,620 --> 00:01:37,655
PLATES.
32
00:01:37,655 --> 00:01:39,586
THE ROLLERS WILL ROTATE TO PULL
33
00:01:39,586 --> 00:01:41,172
FUEL INTO THE PUMP BEFORE
34
00:01:41,172 --> 00:01:45,137
PUSHING IT OUT OF THE TANK.
35
00:01:45,137 --> 00:01:47,172
EACH ROLLER ASSEMBLY IS TESTED
36
00:01:47,172 --> 00:01:51,758
BY SPINNING IT FROM THE BOTTOM.
37
00:01:51,758 --> 00:01:53,965
A ROBOT THEN POPS IT OUT AND
38
00:01:53,965 --> 00:01:59,793
MOVES IT TO THE NEXT STATION.
39
00:01:59,793 --> 00:02:01,517
HERE THE ELECTRIC MOTOR IS
40
00:02:01,517 --> 00:02:03,413
ATTACHED TO THE ROLLER PUMPING
41
00:02:03,413 --> 00:02:04,206
MECHANISM.
42
00:02:04,206 --> 00:02:06,103
THEN IT GETS A MAGNETIC SLEEVE
43
00:02:06,103 --> 00:02:10,344
AND A PLASTIC CAP.
44
00:02:10,344 --> 00:02:11,655
ALL THE PARTS THAT MAKE UP THE
45
00:02:11,655 --> 00:02:13,000
PUMPING MECHANISM HAVE NOW BEEN
46
00:02:13,000 --> 00:02:15,724
ASSEMBLED.
47
00:02:15,724 --> 00:02:17,965
NEXT COMES AN END CAP WITH A
48
00:02:17,965 --> 00:02:21,689
FILTER MADE OF METAL MESH.
49
00:02:21,689 --> 00:02:23,172
A METAL SLEEVE SLIDES OVER THE
50
00:02:23,172 --> 00:02:24,724
PUMP UNIT, AND THE WHOLE THING
51
00:02:24,724 --> 00:02:32,137
IS PRESS-FIT TOGETHER.
52
00:02:32,137 --> 00:02:35,344
INSIDE THIS CHAMBER, LARGE
53
00:02:35,344 --> 00:02:38,965
MAGNETS GENERATE A VERY STRONG
54
00:02:38,965 --> 00:02:40,689
FORCE FIELD.
55
00:02:40,689 --> 00:02:42,517
THIS CAUSES THE METAL SLEEVE TO
56
00:02:42,517 --> 00:02:44,413
COLLAPSE, CRIMPING AT ONE END SO
57
00:02:44,413 --> 00:02:45,896
THAT IT HOLDS EVERYTHING
58
00:02:45,896 --> 00:02:53,586
TOGETHER.
59
00:02:53,586 --> 00:02:55,517
NEXT, RETAINER RINGS GO INTO
60
00:02:55,517 --> 00:03:01,965
SLOTS IN THE FUEL-PUMP CAP.
61
00:03:01,965 --> 00:03:03,724
A METAL BRACKET GOES OVER THE
62
00:03:03,724 --> 00:03:05,241
PUMP.
63
00:03:05,241 --> 00:03:06,896
IT STEADIES THE ASSEMBLY AND
64
00:03:06,896 --> 00:03:08,551
SERVES AS A GUIDE AS WORKERS
65
00:03:08,551 --> 00:03:10,241
INSTALL THE BRUSHES AND COILS
66
00:03:10,241 --> 00:03:12,068
WHICH WILL SUPPLY ELECTRICITY TO
67
00:03:12,068 --> 00:03:16,000
THE FUEL-PUMP MOTOR.
68
00:03:16,000 --> 00:03:17,793
A BRASS TERMINAL SLIDES ONTO THE
69
00:03:17,793 --> 00:03:19,275
END OF EACH COIL AND BRUSH
70
00:03:19,275 --> 00:03:20,793
ASSEMBLY TO FACILITATE THE
71
00:03:20,793 --> 00:03:24,448
ELECTRICAL CONNECTION.
72
00:03:24,448 --> 00:03:26,275
THEN THE TERMINALS ARE ATTACHED
73
00:03:26,275 --> 00:03:32,275
TO THE ASSEMBLY.
74
00:03:32,275 --> 00:03:34,379
WHEN THE JOB IS DONE, A ROBOT
75
00:03:34,379 --> 00:03:38,000
REMOVES THE BRACKET.
76
00:03:38,000 --> 00:03:39,965
THEY BUILT THIS FUEL PUMP FROM
77
00:03:39,965 --> 00:03:41,758
THE INSIDE OUT, AND NOW THE
78
00:03:41,758 --> 00:03:48,137
ACTUAL WORKINGS ARE COMPLETE.
79
00:03:48,137 --> 00:03:49,896
INSPECTORS HOOK EACH PUMP UP TO
80
00:03:49,896 --> 00:03:51,448
A POWER SOURCE AND RUN FLUID
81
00:03:51,448 --> 00:03:53,206
THROUGH THEM TO TEST THE PUMPING
82
00:03:53,206 --> 00:03:53,793
ACTION.
83
00:03:53,793 --> 00:03:55,862
THEN THEY CHECK FOR PROPER FLOW
84
00:03:55,862 --> 00:03:59,448
AND PRESSURE.
85
00:03:59,448 --> 00:04:01,379
IF THE PUMP PASSES INSPECTION, A
86
00:04:01,379 --> 00:04:03,275
ROBOT SENDS IT DOWN THE ASSEMBLY
87
00:04:03,275 --> 00:04:04,517
LINE...
88
00:04:04,517 --> 00:04:06,034
WHERE A TUBING SYSTEM IS BEING
89
00:04:06,034 --> 00:04:07,620
ASSEMBLED TO CARRY THE GASOLINE
90
00:04:07,620 --> 00:04:11,517
TO THE ENGINE.
91
00:04:11,517 --> 00:04:12,862
THE JOINTS ARE SEALED WITH A
92
00:04:12,862 --> 00:04:19,379
BRAZING PASTE.
93
00:04:19,379 --> 00:04:21,241
THEN IT'S INTO A GAS OVEN, WHERE
94
00:04:21,241 --> 00:04:23,000
THE PASTE HARDENS AND FUSES TO
95
00:04:23,000 --> 00:04:29,413
THE TUBING.
96
00:04:29,413 --> 00:04:31,103
WORKERS REMOVE THE TUBING FROM
97
00:04:31,103 --> 00:04:32,620
THE OVEN AND BRUSH OFF ANY
98
00:04:32,620 --> 00:04:34,103
UNWANTED BITS OF METAL AND
99
00:04:34,103 --> 00:04:36,137
UNWANTED BITS OF METAL AND
HARDENED PASTE.
100
00:04:36,137 --> 00:04:44,482
HARDENED PASTE.
101
00:04:44,482 --> 00:04:45,827
THE ENDS OF THE APPARATUS ARE
102
00:04:45,827 --> 00:04:46,965
CAPPED TO KEEP THEM FROM
103
00:04:46,965 --> 00:04:48,172
COLLECTING DIRT AND DEBRIS
104
00:04:48,172 --> 00:04:54,172
DURING SHIPPING.
105
00:04:54,172 --> 00:04:55,862
RUBBER TUBING IS ATTACHED TO THE
106
00:04:55,862 --> 00:04:57,275
PUMP AND SECURED WITH METAL
107
00:04:57,275 --> 00:05:01,413
CLAMPS.
108
00:05:01,413 --> 00:05:02,827
THEN THE RUBBER TUBING IS
109
00:05:02,827 --> 00:05:04,310
CLAMPED TO THE METAL TUBING
110
00:05:04,310 --> 00:05:11,241
SYSTEM.
111
00:05:11,241 --> 00:05:12,896
WORKERS WIRE THE FUEL PUMP, THEN
112
00:05:12,896 --> 00:05:14,413
HOOK UP A CONNECTOR WHICH WILL
113
00:05:14,413 --> 00:05:19,103
ATTACH TO THE ENGINE'S WIRING.
114
00:05:19,103 --> 00:05:21,172
THIS IS THE SENDING UNIT.
115
00:05:21,172 --> 00:05:22,586
IT'S A FLOAT WITH A METAL ARM
116
00:05:22,586 --> 00:05:24,068
THAT'S ATTACHED TO AN ELECTRONIC
117
00:05:24,068 --> 00:05:25,310
SENSOR.
118
00:05:25,310 --> 00:05:26,793
THE SENSOR SENDS INFORMATION
119
00:05:26,793 --> 00:05:28,310
ABOUT FUEL LEVELS TO THE FUEL
120
00:05:28,310 --> 00:05:31,689
GAUGE ON THE DASHBOARD.
121
00:05:31,689 --> 00:05:33,862
A COMPUTERIZED SYSTEM CHECKS THE
122
00:05:33,862 --> 00:05:35,931
SENDING UNIT'S ACCURACY AS THE
123
00:05:35,931 --> 00:05:42,551
SENSOR IS MOVED UP AND DOWN.
124
00:05:42,551 --> 00:05:44,517
ONCE EVERYTHING CHECKS OUT, IT'S
125
00:05:44,517 --> 00:05:46,310
TIME TO FILL THE TANK AND HIT
126
00:05:46,310 --> 00:05:51,413
THE ROAD.
127
00:05:51,413 --> 00:05:52,896
UP NEXT -- CRICKET, ANYONE?
128
00:05:52,896 --> 00:05:54,551
WE'LL GO BEHIND THE SCENES AT A
129
00:05:54,551 --> 00:05:56,551
WE'LL GO BEHIND THE SCENES AT A
BAT FACTORY.
130
00:05:56,551 --> 00:05:59,965
BAT FACTORY.
131
00:05:59,965 --> 00:06:01,620
>> Narrator: REFERENCES TO THE
132
00:06:01,620 --> 00:06:03,310
GAME OF CRICKET DATE BACK TO THE
133
00:06:03,310 --> 00:06:03,827
1300s.
134
00:06:03,827 --> 00:06:05,862
HISTORIANS BELIEVE IT STARTED AS
135
00:06:05,862 --> 00:06:07,103
A CHILDREN'S GAME.
136
00:06:07,103 --> 00:06:09,172
IN THE 1600s, WORKING MEN TOOK
137
00:06:09,172 --> 00:06:11,344
UP THE PASTIME, AND BEFORE LONG,
138
00:06:11,344 --> 00:06:13,206
IT CAUGHT ON WITH THE UPPER
139
00:06:13,206 --> 00:06:14,000
CLASSES.
140
00:06:14,000 --> 00:06:16,000
BY THE 18th CENTURY, CRICKET WAS
141
00:06:16,000 --> 00:06:17,689
ONE OF ENGLAND'S FAVORITE
142
00:06:17,689 --> 00:06:20,862
ORGANIZED SPORTS.
143
00:06:20,862 --> 00:06:22,448
CRICKET BATS ARE MADE OF A
144
00:06:22,448 --> 00:06:24,068
PARTICULAR SPECIES OF WHITE
145
00:06:24,068 --> 00:06:24,689
WILLOW.
146
00:06:24,689 --> 00:06:26,793
IT HAS STRINGY WOOD FIBERS THAT
147
00:06:26,793 --> 00:06:28,034
ARE USUALLY LONG.
148
00:06:28,034 --> 00:06:30,103
THESE GIVE THE WOOD ELASTICITY,
149
00:06:30,103 --> 00:06:32,000
THE KEY TO ITS PERFORMANCE.
150
00:06:32,000 --> 00:06:33,793
BAT MAKERS USE AS MUCH SAPWOOD
151
00:06:33,793 --> 00:06:35,724
AS POSSIBLE BECAUSE IT'S MOISTER
152
00:06:35,724 --> 00:06:37,310
AND MORE FLEXIBLE THAN THE
153
00:06:37,310 --> 00:06:41,758
HEARTWOOD AT THE TREE'S CORE.
154
00:06:41,758 --> 00:06:43,241
PRODUCTION BEGINS WITH WILLOW
155
00:06:43,241 --> 00:06:45,758
PIECES ABOUT 2 1/2 FEET LONG.
156
00:06:45,758 --> 00:06:47,344
THE FIRST MACHINE TRIMS THEM
157
00:06:47,344 --> 00:06:49,172
DOWN ROUGHLY TO SIZE.
158
00:06:49,172 --> 00:06:51,137
A FEW SPRAYS OF WATER LIMBER UP
159
00:06:51,137 --> 00:06:52,241
THE WOOD FIBERS.
160
00:06:52,241 --> 00:06:54,103
THEN EACH PIECE GOES THROUGH A
161
00:06:54,103 --> 00:06:56,000
PRESSING MACHINE THREE TO FOUR
162
00:06:56,000 --> 00:06:57,137
TIMES.
163
00:06:57,137 --> 00:06:59,000
A CURVED ROLLER APPLIES UP TO
164
00:06:59,000 --> 00:07:01,068
THREE TONS OF PRESSURE, ROUNDING
165
00:07:01,068 --> 00:07:03,000
THE BAT'S FACE AND COMPRESSING
166
00:07:03,000 --> 00:07:05,241
THE WOOD BY ALMOST HALF AN INCH.
167
00:07:05,241 --> 00:07:06,793
THIS PRESSING IS ESSENTIAL TO
168
00:07:06,793 --> 00:07:08,137
THE BAT'S PERFORMANCE AND
169
00:07:08,137 --> 00:07:13,689
DURABILITY.
170
00:07:13,689 --> 00:07:15,551
THE BAT MAKER DRAWS A "V" ON THE
171
00:07:15,551 --> 00:07:17,034
END WHERE THE HANDLE WILL
172
00:07:17,034 --> 00:07:17,655
ATTACH.
173
00:07:17,655 --> 00:07:19,620
THEN HE REMOVES THE BULK OF WOOD
174
00:07:19,620 --> 00:07:22,275
BEHIND THE "V" ON A TABLE SAW.
175
00:07:22,275 --> 00:07:23,827
THIS MINIMIZES THE AMOUNT OF
176
00:07:23,827 --> 00:07:25,379
WORK HE'LL HAVE TO DO BY HAND
177
00:07:25,379 --> 00:07:34,000
LATER.
178
00:07:34,000 --> 00:07:36,379
NOW HE CUTS OUT THE "V."
179
00:07:36,379 --> 00:07:38,310
THIS CREATES A JOINT IN WHICH TO
180
00:07:38,310 --> 00:07:40,827
INSERT THE HANDLE.
181
00:07:40,827 --> 00:07:42,586
THE HANDLE IS MADE OF CANE,
182
00:07:42,586 --> 00:07:44,620
DRIED VINE STEMS, GLUED TOGETHER
183
00:07:44,620 --> 00:07:46,448
IN SECTIONS, AND COATED WITH
184
00:07:46,448 --> 00:07:48,137
RUBBER.
185
00:07:48,137 --> 00:07:50,103
THE GRIP END HAS BEEN SHAPED ON
186
00:07:50,103 --> 00:07:51,551
A LATHE.
187
00:07:51,551 --> 00:07:53,310
THE OTHER END WILL ATTACH TO THE
188
00:07:53,310 --> 00:07:55,379
BLADE.
189
00:07:55,379 --> 00:07:56,655
THE BAT MAKER CUTS THE
190
00:07:56,655 --> 00:07:58,206
BLOCK-SHAPE TIP INTO A WEDGE
191
00:07:58,206 --> 00:07:59,931
THAT WILL FIT INTO THE "V" CUT,
192
00:07:59,931 --> 00:08:01,310
THEN GLUES THE TWO PIECES
193
00:08:01,310 --> 00:08:03,344
THEN GLUES THE TWO PIECES
TOGETHER.
194
00:08:03,344 --> 00:08:12,482
TOGETHER.
195
00:08:12,482 --> 00:08:14,448
A FEW TAPS WITH A HAMMER ENSURES
196
00:08:14,448 --> 00:08:16,862
A TIGHT FIT.
197
00:08:16,862 --> 00:08:18,724
HE SPREADS THE EXCESS GLUE ALL
198
00:08:18,724 --> 00:08:21,586
OVER THE JOINT TO SEAL IT.
199
00:08:21,586 --> 00:08:23,482
NOW HE SHAPES THE BAT'S PROFILE
200
00:08:23,482 --> 00:08:25,413
USING A CLASSIC WOODWORKING TOOL
201
00:08:25,413 --> 00:08:27,068
CALLED A DRAWKNIFE.
202
00:08:27,068 --> 00:08:29,000
THIS TAKES ONLY A FEW MINUTES
203
00:08:29,000 --> 00:08:31,068
BUT REQUIRES YEARS OF EXPERIENCE
204
00:08:31,068 --> 00:08:33,827
AND AN EXPERT EYE.
205
00:08:33,827 --> 00:08:35,586
THEN HE COMPLETES THE SHAPING
206
00:08:35,586 --> 00:08:37,413
WITH ANOTHER PRESSING TO CURVE
207
00:08:37,413 --> 00:08:39,241
THE BOTTOM THIRD OF THE BAT.
208
00:08:39,241 --> 00:08:40,862
INTERNATIONAL CRICKET RULES
209
00:08:40,862 --> 00:08:42,724
REGULATE THE LENGTH AND WIDTH OF
210
00:08:42,724 --> 00:08:44,551
BATS, BUT THERE'S NO RESTRICTION
211
00:08:44,551 --> 00:08:46,310
ON CURVE.
212
00:08:46,310 --> 00:08:47,724
GETTING IT RIGHT IS TRICKY,
213
00:08:47,724 --> 00:08:48,241
THOUGH.
214
00:08:48,241 --> 00:08:49,896
TOO MUCH CURVE, AND HE'LL LIMIT
215
00:08:49,896 --> 00:08:51,310
THE BLADE'S FLEXIBILITY AND
216
00:08:51,310 --> 00:08:54,689
PERFORMANCE.
217
00:08:54,689 --> 00:08:56,655
THE BAT MAKER FINISHES OFF THE
218
00:08:56,655 --> 00:09:04,275
SHAPE USING SPECIALIZED TOOLS.
219
00:09:04,275 --> 00:09:06,931
THEN HE USES A METAL HAND PLANE
220
00:09:06,931 --> 00:09:10,034
TO FLATTEN THE BLADE'S EDGES.
221
00:09:10,034 --> 00:09:11,724
HE ENSURES THE BAT HAS GOOD
222
00:09:11,724 --> 00:09:13,379
SPRING BY HITTING IT WITH A
223
00:09:13,379 --> 00:09:14,620
DENSE WOODEN MALLET.
224
00:09:14,620 --> 00:09:16,551
HE ALSO ANALYZES THE SOUND OF
225
00:09:16,551 --> 00:09:17,310
THE STRIKE.
226
00:09:17,310 --> 00:09:19,275
THE SOFTER THE SOUND, THE SOFTER
227
00:09:19,275 --> 00:09:21,241
THE WOOD, AND THE BETTER THE BAT
228
00:09:21,241 --> 00:09:24,172
WILL PLAY.
229
00:09:24,172 --> 00:09:25,862
HE SMOOTHS THE BAT AGAINST AN
230
00:09:25,862 --> 00:09:27,413
AIR-FILLED DRUM SANDER THAT
231
00:09:27,413 --> 00:09:29,103
MOLDS TO THE BAT SO IT DOESN'T
232
00:09:29,103 --> 00:09:30,931
WEAR AWAY THE SHAPE HE WORKED SO
233
00:09:30,931 --> 00:09:34,620
HARD TO ACHIEVE.
234
00:09:34,620 --> 00:09:36,241
THEN A WORKER SMOOTHS OUT THE
235
00:09:36,241 --> 00:09:38,000
REST OF THE SURFACE WITH A BELT
236
00:09:38,000 --> 00:09:39,758
SANDER DESIGNED SPECIFICALLY FOR
237
00:09:39,758 --> 00:09:40,896
CRICKET BATS.
238
00:09:40,896 --> 00:09:43,103
THE ENTIRE BAT IS SANDED TWICE,
239
00:09:43,103 --> 00:09:45,206
FIRST WITH A COARSE ABRASIVE,
240
00:09:45,206 --> 00:09:47,827
THEN WITH A FINE ONE.
241
00:09:47,827 --> 00:09:49,620
NEXT, THE BAT IS MOUNTED ON A
242
00:09:49,620 --> 00:09:51,275
BINDING MACHINE, WHERE ITS
243
00:09:51,275 --> 00:09:53,793
HANDLE GETS A COAT OF GLUE.
244
00:09:53,793 --> 00:09:55,310
A WRAPPING OF TWINE BINDS
245
00:09:55,310 --> 00:09:57,034
TOGETHER THE SECTIONS OF CANE
246
00:09:57,034 --> 00:09:59,241
TOGETHER THE SECTIONS OF CANE
THAT MAKE UP THE HANDLE.
247
00:09:59,241 --> 00:10:06,620
THAT MAKE UP THE HANDLE.
248
00:10:06,620 --> 00:10:08,310
EXTRA GLUE PREVENTS THE TWINE
249
00:10:08,310 --> 00:10:12,448
FROM UNRAVELING.
250
00:10:12,448 --> 00:10:14,206
NEXT, THEY POLISH THE BLADE
251
00:10:14,206 --> 00:10:16,344
NEXT, THEY POLISH THE BLADE
USING A COTTON WHEEL.
252
00:10:16,344 --> 00:10:27,965
USING A COTTON WHEEL.
253
00:10:27,965 --> 00:10:30,000
ONCE THE WOOD IS SHINY ENOUGH,
254
00:10:30,000 --> 00:10:33,931
BRAND-NAME DECALS GO ON.
255
00:10:33,931 --> 00:10:35,827
FINALLY, A RUBBER GRIP GOES OVER
256
00:10:35,827 --> 00:10:37,413
THE BINDING TO PREVENT THE
257
00:10:37,413 --> 00:10:39,724
PLAYER'S HANDS FROM SLIPPING.
258
00:10:39,724 --> 00:10:41,344
THE BAT'S TWO MAIN COMPONENTS
259
00:10:41,344 --> 00:10:42,896
COMPLEMENT EACH OTHER WHEN
260
00:10:42,896 --> 00:10:44,000
STRIKING THE BALL.
261
00:10:44,000 --> 00:10:45,896
THE WILLOW-WOOD BLADE FLEXES
262
00:10:45,896 --> 00:10:47,827
ENOUGH TO DELIVER A GOOD HIT,
263
00:10:47,827 --> 00:10:49,724
AND THE CANE HANDLE ABSORBS THAT
264
00:10:49,724 --> 00:10:51,551
ENERGY, PROTECTING THE PLAYER'S
265
00:10:51,551 --> 00:10:58,586
HANDS.
266
00:10:58,586 --> 00:11:00,689
WHEN YOU RETURN -- MAKING THE
267
00:11:00,689 --> 00:11:03,034
WHEN YOU RETURN -- MAKING THE
MACHINES THAT MAKE OUR CHANGE.
268
00:11:03,034 --> 00:11:07,206
MACHINES THAT MAKE OUR CHANGE.
269
00:11:07,206 --> 00:11:08,827
>> Narrator: CHANGE MACHINES
270
00:11:08,827 --> 00:11:10,517
WERE INVENTED IN THE MID-1950s
271
00:11:10,517 --> 00:11:11,655
IN RESPONSE TO THE
272
00:11:11,655 --> 00:11:13,034
VENDING-MACHINE BOOM.
273
00:11:13,034 --> 00:11:15,000
THEY BEGAN AS SIMPLE MECHANICAL
274
00:11:15,000 --> 00:11:16,793
COIN CHANGERS, CONVERTING A
275
00:11:16,793 --> 00:11:18,758
QUARTER INTO NICKELS AND DIMES.
276
00:11:18,758 --> 00:11:20,758
TODAY'S MODERN MACHINES CAN EVEN
277
00:11:20,758 --> 00:11:22,896
CONVERT $20 BILLS.
278
00:11:22,896 --> 00:11:29,034
TIMES SURE HAVE CHANGED.
279
00:11:29,034 --> 00:11:30,689
IT'S LIKE MAGIC.
280
00:11:30,689 --> 00:11:33,000
IN GOES THE BILL, AND PRESTO,
281
00:11:33,000 --> 00:11:35,103
OUT COMES THE EXACT CHANGE.
282
00:11:35,103 --> 00:11:37,034
BUT BEHIND THE SCENES, THERE'S
283
00:11:37,034 --> 00:11:38,689
NO SLIGHT OF HAND -- JUST
284
00:11:38,689 --> 00:11:40,275
INNOVATIVE DESIGN AND SOME
285
00:11:40,275 --> 00:11:41,965
PRETTY HIGH-TECH EQUIPMENT.
286
00:11:41,965 --> 00:11:43,379
PRODUCTION BEGINS WITH THE
287
00:11:43,379 --> 00:11:44,413
MACHINE'S CABINET.
288
00:11:44,413 --> 00:11:46,310
A COMPUTER-GUIDED LASER CUTS THE
289
00:11:46,310 --> 00:11:48,068
CABINET PARTS FROM A SHEET OF
290
00:11:48,068 --> 00:11:56,965
STEEL MEASURING 1 BY 1/2 YARDS.
291
00:11:56,965 --> 00:11:58,758
WORKERS SHAKE THE PARTS FREE AND
292
00:11:58,758 --> 00:12:00,413
PUSH OUT THE OPENINGS IN THE
293
00:12:00,413 --> 00:12:01,931
PANEL THAT WILL BECOME THE
294
00:12:01,931 --> 00:12:05,068
CABINET'S FRONT DOOR.
295
00:12:05,068 --> 00:12:06,655
THE PARTS ARE THEN SHAPED IN A
296
00:12:06,655 --> 00:12:08,241
MACHINE CALLED THE PRESS BREAK.
297
00:12:08,241 --> 00:12:12,000
THIS IS ONE OF THE DOOR PANELS.
298
00:12:12,000 --> 00:12:13,689
THE MACHINE FORCES IT AGAINST
299
00:12:13,689 --> 00:12:16,172
A DIE, BENDING THE EDGE.
300
00:12:16,172 --> 00:12:18,103
THESE BENT EDGES WILL STRENGTHEN
301
00:12:18,103 --> 00:12:20,000
THE DOOR AND HELP IT FIT SNUGLY
302
00:12:20,000 --> 00:12:25,275
INTO THE FRAME.
303
00:12:25,275 --> 00:12:26,896
THE LASER CUTTER ALSO MAKES A
304
00:12:26,896 --> 00:12:28,344
SERIES OF HOLES IN ANOTHER
305
00:12:28,344 --> 00:12:29,206
CABINET PART.
306
00:12:29,206 --> 00:12:31,448
THEN WORKERS PRESS THREADED
307
00:12:31,448 --> 00:12:34,000
STUDS INTO THE HOLES.
308
00:12:34,000 --> 00:12:35,896
A VIBRATING FEEDER AUTOMATICALLY
309
00:12:35,896 --> 00:12:37,586
DISPENSES THE STUDS INTO THE
310
00:12:37,586 --> 00:12:41,551
INSERTION MACHINE.
311
00:12:41,551 --> 00:12:43,448
NOW THEY BEND THE SHEET, AGAIN
312
00:12:43,448 --> 00:12:45,275
USING A PRESS BREAK, AND MAKE
313
00:12:45,275 --> 00:12:47,241
THE THREE-SIDED PANEL THAT WILL
314
00:12:47,241 --> 00:12:49,034
BECOME THE CABINET SIDES AND
315
00:12:49,034 --> 00:12:54,000
BACK.
316
00:12:54,000 --> 00:12:55,862
THEY ATTACH THE TOP AND BOTTOM
317
00:12:55,862 --> 00:13:00,620
PANELS.
318
00:13:00,620 --> 00:13:02,241
THEN THEY POSITION THE CABINET
319
00:13:02,241 --> 00:13:03,655
ON A COMPUTERIZED WELDING
320
00:13:03,655 --> 00:13:08,655
STATION AND ROTATE THE TABLE.
321
00:13:08,655 --> 00:13:10,448
A ROBOT MAKES PRECISION WELDS
322
00:13:10,448 --> 00:13:12,241
BEHIND A STEEL PARTITION THAT
323
00:13:12,241 --> 00:13:14,034
SHIELDS WORKERS FROM HEAT AND
324
00:13:14,034 --> 00:13:18,758
HARMFUL RAYS.
325
00:13:18,758 --> 00:13:20,586
NOW THEY ASSEMBLE THE CHANGE
326
00:13:20,586 --> 00:13:22,241
MACHINE'S COIN DISPENSER.
327
00:13:22,241 --> 00:13:23,965
IT HAS TWO COUNTER-ROTATING
328
00:13:23,965 --> 00:13:25,965
DISCS FITTED TO THE DIAMETER AND
329
00:13:25,965 --> 00:13:27,689
THICKNESS OF A COIN.
330
00:13:27,689 --> 00:13:29,413
THEY WORK TOGETHER TO SEIZE AND
331
00:13:29,413 --> 00:13:31,103
ALIGN THE COINS, THEN DROP THEM
332
00:13:31,103 --> 00:13:33,344
INTO THE COIN CHUTE.
333
00:13:33,344 --> 00:13:34,896
WORKERS SET IN THESE METAL
334
00:13:34,896 --> 00:13:36,758
DISCS, ALONG WITH A PLASTIC GEAR
335
00:13:36,758 --> 00:13:40,724
MECHANISM THAT ROTATES THEM.
336
00:13:40,724 --> 00:13:43,034
THEN THEY SECURE THE PARTS ON A
337
00:13:43,034 --> 00:13:45,068
FIXTURE...
338
00:13:45,068 --> 00:13:46,724
AND DRILL HOLES INTO THE GEAR
339
00:13:46,724 --> 00:13:48,827
AND DRILL HOLES INTO THE GEAR
MECHANISM.
340
00:13:48,827 --> 00:13:56,551
MECHANISM.
341
00:13:56,551 --> 00:13:58,241
ROLL PINS ARE INSERTED TO HOLD
342
00:13:58,241 --> 00:14:00,827
THE PARTS TOGETHER.
343
00:14:00,827 --> 00:14:03,206
THEN WORKERS MAKE SURE THE COIN
344
00:14:03,206 --> 00:14:07,068
DISCS SPIN FREELY.
345
00:14:07,068 --> 00:14:09,000
THE NEXT TASK IS TO ASSEMBLE THE
346
00:14:09,000 --> 00:14:12,620
COIN-DISPENSER DISCS AND GEARS.
347
00:14:12,620 --> 00:14:14,931
THIS IS PRECISION WORK.
348
00:14:14,931 --> 00:14:16,931
FIRST, THEY SET THE PARTS IN A
349
00:14:16,931 --> 00:14:21,655
METAL CASING.
350
00:14:21,655 --> 00:14:23,241
PLASTIC RINGS GO AROUND THE
351
00:14:23,241 --> 00:14:25,000
DISCS TO GUIDE AND SUPPORT THE
352
00:14:25,000 --> 00:14:32,241
GEARS.
353
00:14:32,241 --> 00:14:33,827
THEN THEY ATTACH THE GEAR-TRAIN
354
00:14:33,827 --> 00:14:35,000
MOTOR WHICH POWERS THE
355
00:14:35,000 --> 00:14:37,206
MOTOR WHICH POWERS THE
CHANGE-DISPENSING DISCS.
356
00:14:37,206 --> 00:14:46,965
CHANGE-DISPENSING DISCS.
357
00:14:46,965 --> 00:14:48,517
A PLASTIC GUIDE ON THE CASING
358
00:14:48,517 --> 00:14:49,827
HELPS THE COINS DROP IN
359
00:14:49,827 --> 00:14:53,655
PROPERLY.
360
00:14:53,655 --> 00:14:55,379
NEXT COMES THE COIN CHUTE THAT
361
00:14:55,379 --> 00:14:57,000
GUIDES THE CHANGE OUT OF THE
362
00:14:57,000 --> 00:14:58,862
DISPENSER AND INTO THE MACHINE'S
363
00:14:58,862 --> 00:15:03,655
COIN CUP.
364
00:15:03,655 --> 00:15:06,000
THE DISPENSER HOLDS UP TO $800,
365
00:15:06,000 --> 00:15:08,000
WHICH CAN WEIGH A HEFTY 45
366
00:15:08,000 --> 00:15:10,103
POUNDS, SO IT NEEDS A STRONG
367
00:15:10,103 --> 00:15:11,068
HANDLE.
368
00:15:11,068 --> 00:15:12,827
IT'S LOCKED INTO PLACE WITH THIS
369
00:15:12,827 --> 00:15:21,000
TOOL, CALLED A RING FASTENER.
370
00:15:21,000 --> 00:15:22,655
NOW IT'S TIME TO PUT THE WHOLE
371
00:15:22,655 --> 00:15:24,206
MACHINE TOGETHER.
372
00:15:24,206 --> 00:15:26,103
FIRST, AN ELECTRIC POWER SUPPLY
373
00:15:26,103 --> 00:15:28,034
IS INSTALLED ON THE INSIDE BACK
374
00:15:28,034 --> 00:15:29,413
WALL.
375
00:15:29,413 --> 00:15:34,275
NEXT COMES THE BILL VALIDATOR.
376
00:15:34,275 --> 00:15:39,172
AND THE COIN CUP.
377
00:15:39,172 --> 00:15:40,862
THEN THE COIN DISPENSER AND
378
00:15:40,862 --> 00:15:42,620
ELECTRONIC CONTROL BOARD, THE
379
00:15:42,620 --> 00:15:44,241
BRAINS OF THE MACHINE THAT
380
00:15:44,241 --> 00:15:46,206
CALCULATES THE CHANGE.
381
00:15:46,206 --> 00:15:48,413
FINALLY, ON GO THE INSTRUCTION
382
00:15:48,413 --> 00:15:49,172
DECALS.
383
00:15:49,172 --> 00:15:51,862
SO, HOW DO BILLS TRANSFORM INTO
384
00:15:51,862 --> 00:15:52,689
COINS?
385
00:15:52,689 --> 00:15:54,586
LET'S OPEN THE DOOR AND SEE.
386
00:15:54,586 --> 00:15:56,689
FIRST, THE BILL ACCEPTOR SCANS
387
00:15:56,689 --> 00:15:58,827
THE BILL'S PAPER AND INK, THEN
388
00:15:58,827 --> 00:16:00,310
STACKS IT IN A BOX.
389
00:16:00,310 --> 00:16:02,310
THE PROCESSOR CALCULATES THE
390
00:16:02,310 --> 00:16:04,310
TRANSACTION, THEN CHA-CHING,
391
00:16:04,310 --> 00:16:06,586
EXACT CHANGE.
392
00:16:06,586 --> 00:16:08,034
COMING UP -- TURNING IRON AND
393
00:16:08,034 --> 00:16:09,586
STEEL INTO THE PIPES THAT KEEP
394
00:16:09,586 --> 00:16:11,586
STEEL INTO THE PIPES THAT KEEP
OUR CITIES RUNNING.
395
00:16:11,586 --> 00:16:15,103
OUR CITIES RUNNING.
396
00:16:15,103 --> 00:16:16,724
>> Narrator: CHANCES ARE YOU USE
397
00:16:16,724 --> 00:16:18,241
DUCTILE-IRON PIPE EVERY DAY AND
398
00:16:18,241 --> 00:16:19,275
DON'T EVEN KNOW IT.
399
00:16:19,275 --> 00:16:20,827
THE UNDERGROUND PIPES THAT
400
00:16:20,827 --> 00:16:22,413
TRANSPORT A CITY'S DRINKING
401
00:16:22,413 --> 00:16:24,000
WATER ARE CAST FROM DUCTILE
402
00:16:24,000 --> 00:16:24,517
IRON.
403
00:16:24,517 --> 00:16:26,241
SO ARE THE SEWER PIPES THAT TAKE
404
00:16:26,241 --> 00:16:27,448
AWAY HOUSEHOLD WAIST.
405
00:16:27,448 --> 00:16:29,310
DUCTILE IRON IS MORE FLEXIBLE
406
00:16:29,310 --> 00:16:30,896
THAN ORDINARY GRAY IRON.
407
00:16:30,896 --> 00:16:32,620
UNDER PRESSURE, IT WILL BEND
408
00:16:32,620 --> 00:16:37,586
BEFORE IT BREAKS.
409
00:16:37,586 --> 00:16:39,689
DUCTILE-IRON PIPES ARE MADE OF
410
00:16:39,689 --> 00:16:41,758
90% RECYCLED METAL AND HAVE A
411
00:16:41,758 --> 00:16:46,448
LIFE-SPAN OF HUNDREDS OF YEARS.
412
00:16:46,448 --> 00:16:48,206
PRODUCTION BEGINS IN THE PIPE
413
00:16:48,206 --> 00:16:50,034
FACTORY'S SCRAPYARD.
414
00:16:50,034 --> 00:16:51,758
THESE OLD CARS ARE ON THEIR WAY
415
00:16:51,758 --> 00:16:53,517
TO A SHREDDER THAT CHEWS THEM UP
416
00:16:53,517 --> 00:16:55,620
INTO LITTLE BITS.
417
00:16:55,620 --> 00:16:57,448
THE FACTORY SORTS THE BITS BY
418
00:16:57,448 --> 00:16:58,172
MATERIAL.
419
00:16:58,172 --> 00:17:00,413
IT DISCARDS THE PLASTIC, SELLS
420
00:17:00,413 --> 00:17:02,448
THE ALUMINUM AND COPPER, BUT
421
00:17:02,448 --> 00:17:04,275
KEEPS THE STEEL AND IRON.
422
00:17:04,275 --> 00:17:05,965
THE FACTORY ALSO GETS SCRAP
423
00:17:05,965 --> 00:17:07,862
STEEL FROM DEMOLISHED BUILDINGS
424
00:17:07,862 --> 00:17:10,034
AND OTHER SOURCES.
425
00:17:10,034 --> 00:17:11,793
THE SHREDDED METAL IS ANALYZED
426
00:17:11,793 --> 00:17:13,586
BY ITS CHEMICAL COMPOSITION AND
427
00:17:13,586 --> 00:17:17,724
SORTED ACCORDINGLY.
428
00:17:17,724 --> 00:17:19,103
A CRANE OPERATOR USES AN
429
00:17:19,103 --> 00:17:20,655
INDUSTRIAL MAGNET TO GATHER
430
00:17:20,655 --> 00:17:22,241
PRECISE AMOUNTS OF STEEL AND
431
00:17:22,241 --> 00:17:28,241
IRON.
432
00:17:28,241 --> 00:17:30,344
THE SHREDDED METALS THEN GO INTO
433
00:17:30,344 --> 00:17:32,413
A BLAST FURNACE FUELED BY COKE,
434
00:17:32,413 --> 00:17:33,551
A FORM OF COAL.
435
00:17:33,551 --> 00:17:36,068
AT 2,500 DEGREES FAHRENHEIT, THE
436
00:17:36,068 --> 00:17:38,413
IRON AND STEEL LIQUEFY, WHILE
437
00:17:38,413 --> 00:17:41,620
IMPURITIES ARE CARRIED AWAY.
438
00:17:41,620 --> 00:17:43,482
WORKERS THEN ADD MAGNESIUM.
439
00:17:43,482 --> 00:17:45,206
THIS TURNS THE METAL FROM
440
00:17:45,206 --> 00:17:46,827
ORDINARY GRAY IRON INTO
441
00:17:46,827 --> 00:17:48,931
STRONGER, MORE FLEXIBLE DUCTILE
442
00:17:48,931 --> 00:17:52,655
IRON.
443
00:17:52,655 --> 00:17:54,448
THE MOLTEN IRON TRAVELS DOWN A
444
00:17:54,448 --> 00:17:56,206
TROUGH INTO A CASTING MACHINE.
445
00:17:56,206 --> 00:17:57,965
IT ENTERS A SPINNING MOLD, WHERE
446
00:17:57,965 --> 00:17:59,551
CENTRIFUGAL FORCE SPREADS THE
447
00:17:59,551 --> 00:18:01,758
CENTRIFUGAL FORCE SPREADS THE
IRON AGAINST THE MOLD WALLS.
448
00:18:01,758 --> 00:18:09,068
IRON AGAINST THE MOLD WALLS.
449
00:18:09,068 --> 00:18:10,793
A COOLING SYSTEM CHILLS THE
450
00:18:10,793 --> 00:18:12,655
WALLS, AND THE IRON SOLIDIFIES
451
00:18:12,655 --> 00:18:14,724
WITHIN SECONDS.
452
00:18:14,724 --> 00:18:16,896
THEN AN EXTRACTOR PULLS OUT A
453
00:18:16,896 --> 00:18:19,241
20-FOOT-LONG CAST-IRON PIPE, THE
454
00:18:19,241 --> 00:18:22,103
STANDARD INDUSTRY LENGTH.
455
00:18:22,103 --> 00:18:23,965
BEFORE EACH CASTING, WORKERS
456
00:18:23,965 --> 00:18:25,862
INSERT A ROUND FORM, CALLED A
457
00:18:25,862 --> 00:18:27,827
CORE, INTO ONE END OF THE PIPE
458
00:18:27,827 --> 00:18:29,206
MOLD.
459
00:18:29,206 --> 00:18:30,827
THE MOLTEN IRON FILLS THE VOID
460
00:18:30,827 --> 00:18:32,241
BETWEEN THE CORE AND MOLD,
461
00:18:32,241 --> 00:18:33,517
FORMING A FLARED EDGE,
462
00:18:33,517 --> 00:18:34,551
CALLED A BELL.
463
00:18:34,551 --> 00:18:36,586
THE CORE ALSO SEALS OFF THAT END
464
00:18:36,586 --> 00:18:38,517
OF THE MOLD, PREVENTING MOLTEN
465
00:18:38,517 --> 00:18:40,275
IRON FROM FLYING OUT DURING
466
00:18:40,275 --> 00:18:40,965
CASTING.
467
00:18:40,965 --> 00:18:42,724
WHEN IT'S TIME TO CONNECT THE
468
00:18:42,724 --> 00:18:44,517
PIPES, INSTALLERS WILL FIT THE
469
00:18:44,517 --> 00:18:46,034
BELL OF ONE PIPE OVER THE
470
00:18:46,034 --> 00:18:47,551
STRAIGHT END OF ANOTHER.
471
00:18:47,551 --> 00:18:49,551
A RUBBER GASKET SEALS THE LINK
472
00:18:49,551 --> 00:18:52,413
TOGETHER.
473
00:18:52,413 --> 00:18:54,000
THE CASTING MACHINE CAN MAKE
474
00:18:54,000 --> 00:18:55,689
PIPES OF DIFFERENT DIAMETERS BY
475
00:18:55,689 --> 00:18:57,310
CHANGING THE SIZE OF THE MOLD
476
00:18:57,310 --> 00:19:05,620
INSIDE.
477
00:19:05,620 --> 00:19:07,241
AFTER THE PIPE IS EXTRACTED,
478
00:19:07,241 --> 00:19:09,034
INSPECTORS WEIGH IT AND MEASURE
479
00:19:09,034 --> 00:19:10,758
THE WALL THICKNESS TO BE SURE
480
00:19:10,758 --> 00:19:13,103
EVERYTHING MEETS SPECIFICATIONS.
481
00:19:13,103 --> 00:19:15,137
THEN, ON THE BELL END, THEY
482
00:19:15,137 --> 00:19:16,482
REMOVE THE CORE.
483
00:19:16,482 --> 00:19:18,103
SINCE IT'S MADE OF SAND AND
484
00:19:18,103 --> 00:19:19,620
PLASTIC RESIN, IT SIMPLY
485
00:19:19,620 --> 00:19:21,724
PLASTIC RESIN, IT SIMPLY
DISINTEGRATES.
486
00:19:21,724 --> 00:19:34,482
DISINTEGRATES.
487
00:19:34,482 --> 00:19:36,241
THIS FACTORY MAKES PIPES IN
488
00:19:36,241 --> 00:19:37,758
SEVERAL DIAMETERS, BUT
489
00:19:37,758 --> 00:19:39,758
REGARDLESS OF SIZE, THE CASTING
490
00:19:39,758 --> 00:19:41,689
PROCESS IS ALWAYS THE SAME.
491
00:19:41,689 --> 00:19:43,241
IT JUST TAKES LESS TIME WITH
492
00:19:43,241 --> 00:19:44,758
SMALLER PIPES BECAUSE THEY
493
00:19:44,758 --> 00:19:50,827
HARDEN FASTER.
494
00:19:50,827 --> 00:19:52,689
A FRESHLY CAST PIPE IS AROUND
495
00:19:52,689 --> 00:19:54,689
1,500 DEGREES FAHRENHEIT, BUT IT
496
00:19:54,689 --> 00:19:56,655
COOLS QUICKLY AFTER LEAVING THE
497
00:19:56,655 --> 00:19:57,896
MOLD.
498
00:19:57,896 --> 00:19:59,551
SUCH RAPID COOLING MAKES THE
499
00:19:59,551 --> 00:20:01,310
IRON BRITTLE, SO THE PIPE GOES
500
00:20:01,310 --> 00:20:02,862
DIRECTLY INTO A GAS-FIRED
501
00:20:02,862 --> 00:20:04,620
ANNEALING FURNACE THAT REHEATS
502
00:20:04,620 --> 00:20:07,000
IT TO 1,700 DEGREES FAHRENHEIT.
503
00:20:07,000 --> 00:20:08,586
THIS ALTERS THE INTERNAL
504
00:20:08,586 --> 00:20:10,620
STRUCTURE OF THE IRON, MAKING IT
505
00:20:10,620 --> 00:20:12,862
STRONG AND FLEXIBLE.
506
00:20:12,862 --> 00:20:14,310
THE PIPE THEN RUNS THROUGH A
507
00:20:14,310 --> 00:20:15,965
COOLING CHAMBER THAT SHOWERS IT
508
00:20:15,965 --> 00:20:19,551
IN COLD WATER.
509
00:20:19,551 --> 00:20:21,000
TO PREVENT THE IRON FROM
510
00:20:21,000 --> 00:20:22,586
CORRODING, THE INSIDE GETS
511
00:20:22,586 --> 00:20:24,448
SPRAYED WITH CEMENT, BUILDING UP
512
00:20:24,448 --> 00:20:26,137
A LINING AN EIGHTH OF AN INCH
513
00:20:26,137 --> 00:20:28,655
A LINING AN EIGHTH OF AN INCH
THICK.
514
00:20:28,655 --> 00:20:36,396
THICK.
515
00:20:36,396 --> 00:20:38,379
THEN THE PIPE IS SPUN FOR A FEW
516
00:20:38,379 --> 00:20:40,034
SECONDS TO SMOOTH OUT THE
517
00:20:40,034 --> 00:20:41,000
CEMENT.
518
00:20:41,000 --> 00:20:43,000
THE ENTIRE PIPE IS PAINTED
519
00:20:43,000 --> 00:20:44,793
INSIDE AND OUT.
520
00:20:44,793 --> 00:20:46,551
THIS SEALS THE SURFACE, ENABLING
521
00:20:46,551 --> 00:20:48,034
THE CEMENT TO CURE OVER THE
522
00:20:48,034 --> 00:20:49,655
NEXT 24 HOURS.
523
00:20:49,655 --> 00:20:51,689
IT ALSO PROVIDES SOME EXTRA RUST
524
00:20:51,689 --> 00:20:53,448
PROTECTION.
525
00:20:53,448 --> 00:20:55,344
FINALLY, A ROBOT PAINTS A STRIPE
526
00:20:55,344 --> 00:20:57,206
AROUND THE STRAIGHT END OF EACH
527
00:20:57,206 --> 00:20:58,172
PIPE.
528
00:20:58,172 --> 00:20:59,931
THIS IS A DEPTH GUIDELINE SO
529
00:20:59,931 --> 00:21:01,689
INSTALLATION CREWS KNOW WHEN
530
00:21:01,689 --> 00:21:03,448
THEY'VE INSERTED THE STRAIGHT
531
00:21:03,448 --> 00:21:05,379
END OF ONE PIPE AS FAR AS IT CAN
532
00:21:05,379 --> 00:21:13,827
GO INTO THE BELL END OF ANOTHER.
533
00:21:13,827 --> 00:21:15,448
IF YOU HAVE ANY COMMENTS ABOUT
534
00:21:15,448 --> 00:21:17,000
THE SHOW, OR IF YOU'D LIKE TO
535
00:21:17,000 --> 00:21:18,758
SUGGEST TOPICS FOR FUTURE SHOWS,
536
00:21:18,758 --> 00:21:20,827
SUGGEST TOPICS FOR FUTURE SHOWS,
DROP US AT LINE AT...
35069
Can't find what you're looking for?
Get subtitles in any language from opensubtitles.com, and translate them here.