Afrikaans
Akan
Albanian
Amharic
Arabic
Armenian
Azerbaijani
Basque
Belarusian
Bemba
Bengali
Bihari
Bosnian
Breton
Bulgarian
Cambodian
Catalan
Cebuano
Cherokee
Chichewa
Chinese (Simplified)
Chinese (Traditional)
Corsican
Croatian
Czech
Danish
Dutch
English
Esperanto
Estonian
Ewe
Faroese
Filipino
Finnish
French
Frisian
Ga
Galician
Georgian
German
Greek
Guarani
Gujarati
Haitian Creole
Hausa
Hawaiian
Hebrew
Hindi
Hmong
Hungarian
Icelandic
Igbo
Indonesian
Interlingua
Irish
Italian
Japanese
Javanese
Kannada
Kazakh
Kinyarwanda
Kirundi
Kongo
Korean
Krio (Sierra Leone)
Kurdish
Kurdish (Soranî)
Kyrgyz
Laothian
Latin
Latvian
Lingala
Lithuanian
Lozi
Luganda
Luo
Luxembourgish
Macedonian
Malagasy
Malay
Malayalam
Maltese
Maori
Marathi
Mauritian Creole
Moldavian
Mongolian
Myanmar (Burmese)
Montenegrin
Nepali
Nigerian Pidgin
Northern Sotho
Norwegian
Norwegian (Nynorsk)
Occitan
Oriya
Oromo
Pashto
Persian
Polish
Portuguese (Brazil)
Portuguese (Portugal)
Punjabi
Quechua
Romanian
Romansh
Runyakitara
Russian
Samoan
Scots Gaelic
Serbian
Serbo-Croatian
Sesotho
Setswana
Seychellois Creole
Shona
Sindhi
Sinhalese
Slovak
Slovenian
Somali
Spanish
Spanish (Latin American)
Sundanese
Swahili
Swedish
Tajik
Tamil
Tatar
Telugu
Thai
Tigrinya
Tonga
Tshiluba
Tumbuka
Turkmen
Twi
Uighur
Ukrainian
Urdu
Uzbek
Vietnamese
Welsh
Wolof
Xhosa
Yiddish
Yoruba
Zulu
Narrator: In central europe,
This elite team of engineers
Is embarking on an epic endeavor.
You're going where no one has ever been before.
♪
Narrator: They are attempting to build
The longest underground railway in the world,
Running right through the heart
Of the mighty alps mountain range.
That's it! No, no, no! [ speaks indistinctly ]
Narrator: To construct this colossus,
The team must battle intense heat...
...Massive machines,
And dangerous explosives.
[ speaks foreign language ]
Narrator: This remarkable structure ranks
In a league of ambitious new engineering wonders
That are bigger, faster, taller, and more advanced
Than anything ever constructed before.
This is the inside story of the extraordinary challenge
Of building these giants.
♪
-- Captions by vitac -- www.Vitac.Com
Captions paid for by discovery communications
♪
The alps, europe's highest mountain range,
Soars nearly three miles high.
It forms a formidable natural barrier
Between Italy in the south
And the rest of europe in the north.
The main route through is this steep winding link
Called the brenner pass.
♪
The brenner pass crosses the border
Between Italy and austria.
It is one of the most crucial transport links in europe.
The link is made up of a highway
Carrying cars and heavy trucks
And a railway carrying both passengers and freight.
The railway is more than 150 years old
And winds slowly around perilously steep gradients.
♪
The highway is crammed with traffic and regularly closed
Due to its atrocious weather,
But the last 20 years,
Engineers have been working on a radical solution
For this transportation challenge.
It's called the brenner base tunnel
And is a brand-new rail link
That will carry both freight and passengers.
This will be no ordinary railway.
It will run through a network of tunnels
That cut right through
The rugged geography of the alps.
This is the network of tunnels
They must build to complete the railway.
The tunnels will carve a 34-mile direct line from innsbruck
In austria to fortezza in Italy.
They will run at depths close to 6,000 feet
Beneath the mighty alps.
Two huge 26-foot-diameter tunnels each lined
With 12-inch-thick concrete slabs
Run side by side for north and southbound trains.
Cross tunnels every 1,090 feet connect them
While the smaller service tunnel runs below.
Three cavernous underground refuges
Provide smoke-proof escape routes to safety
In case a fire breaks out.
Over 200 trains an hour will hurtle through the tunnel
At speeds of up to 155 miles per hour,
Slashing journey times through the alps by 55 minutes.
When complete, it will become the longest rail tunnel
In the world.
Digging tunnels through the heart
Of the tallest mountain range in europe
Is a formidable challenge.
It rests on the shoulders of project supervisor giorgio
To keep this massive project on track.
This is the biggest project in europe.
The challenges are very high.
We have to face a very hard rock.
It's gonna be the longest tunnel in the world,
So the skills will be pushed to the limit.
Narrator: This is how they'll do it.
The tunnel is too long to simply start at one end
And finish at the other,
So engineers will divide it up into sections.
First, they must dig three access tunnels
On each side of the alps in both austria and Italy.
These shafts get crews down to the main tunnel route
Through several different access points along the way.
From here, they create smaller exploratory tunnels
To understand the rock conditions
Surrounding the main tunnel.
Next, huge custom-built tunneling machines
Bore the majority of the two main tunnels.
Workers use explosives to excavate the cross tunnels
And emergency stops.
Digging several sections of the tunnel
At once cuts the overall build time by half
Compared to digging a long tunnel in one go,
But they have to get their measurements millimeter accurate
To make sure all the tunnel sections meet up.
[ explosion ]
[ cheering ]
Narrator: Excavation began in 2007.
It took workers over 10 years just to prepare the site
And dig the smaller preliminary tunnels
Down to the main tunnel route,
And that was the easy part.
Now the project enters its most ambitious stage.
On the austrian side, engineers are gearing up
To excavate the exploratory tunnels
South towards the border.
Meanwhile, in Italy, they're getting ready to start
Digging the two main railway tunnels.
To construct the subterranean passages,
Workers have had to dig out two huge caverns deep underground.
♪
These will house a pair of mountain-eating monsters,
Two huge tunnel boring machines, called tbms,
That will excavate the rock.
Project lead giorgio's first challenge
Is to transport the pieces of these colossal machines
From the factory where they're being fabricated in germany
To his underground labyrinth in Italy
Where they will be assembled.
I am supposed to know this place like the back of my hand.
Problem is that logistics
And everything change on a daily basis,
So you know it like the back of your hand,
But it's a different hand every day. [ chuckles ]
Narrator: Each tunnel boring machine is 656 feet long,
Weighs a colossal 3,031 tons
And is powered by a huge
5,700-horsepower engine.
At the front of each machine, a massive 35-foot-wide cutter
Head claws through the rock.
Behind, a thick metal skin shields a conveyor belt
That clears the debris.
Further back, huge hydraulic pistons
Grip the rock side walls
And drive the cutting head forward with a force of 35 tons.
Boring stops only to reposition the grippers every 5 1/2 feet.
Finally, a robotic arm installs concrete segments
To seal the tunnel and form its walls.
[ machine whirring ]
These digging demons can punch through up
To 100 feet of solid rock every single day.
♪
It's winter time and peak tourist season in the alps.
♪
3,000 feet below,
Giorgio's work site is overcrowded.
We have right now about 700 workers on the job,
And each one is doing a job,
But it's only teamwork that pays off,
And you'll get mad at everyone,
But you're going to need everyone.
[ speaking foreign language ]
These people have a problem with geometry,
Which is not the best thing down here.
Narrator: The tunnel boring machines
Are too big to transport
From germany to giorgio's site in one piece,
So engineers must ship them in half a million smaller pieces.
For each machine, reassembling all the pieces on site
Takes giorgio's team four months.
Positioning the cutter head at the front of the machine
Is the hardest part.
These are the cutters that penetrate the rock.
The cutter head rotates.
Usually normal condition,
It'll go three or four rounds per minute.
So you're running 7 days a week, 24 hours a day,
And this machine that is noisy, vibrates,
It sort of becomes of a life companion
For the length of the excavation.
Narrator: Lifting up the 206-ton cutting head to its final
Upright position is no simple task.
It needs to fit into a special supporting bearing
Perfectly without damaging the intricate cutting mechanism.
In charge of the megaton lift is supervisor rui.
So...
Narrator: A broken cutter head
Would set the team back by months
And millions of dollars.
Failure isn't an option.
♪
♪
Narrator: High in the italian alps,
A team of engineers
Is building the longest railway tunnel in the world.
Over the last four weeks, they've been painstakingly
Constructing one of two huge tunnel boring machines.
Today, supervisor rui and his team of engineers
Are lifting the 206-ton cutting head into place.
The team's first job is to attach the head
To two giant cranes
And slowly start lifting it to a vertical position.
Workers must constantly move the crane forward
To keep it directly above the head.
If they get it wrong,
The massive disk could swing uncontrollably.
♪
It takes four hours of meticulous work
To haul the head vertical.
Now rui's team must carefully pull the cutter head back
To slot it into the front of the machine.
♪
They move the head inch by inch
To line it up perfectly.
♪
Rui climbs inside the tunneling machine
To check that the head aligns properly.
Okay.
Narrator: There isn't enough space here to use power tools.
[ speaks foreign language ]
Narrator: So workers must bolt the head into position by hand.
Finally, after 36 hours of grueling work,
Rui's team safely secures the cutter head.
Teams work 24/7 for the next three months
Assembling the half a million parts
Of this mammoth digging machine.
As they complete every new section,
They push the cutter head further down the cavern
Towards the rock face.
They have named this giant rock-eating machine flavia.
It's the first of the two tunneling machines
That will attempt to eat through the 8.6 miles of rock
That stands between here and the austrian border.
Flavia costs a staggering $22 million,
But once tunneling, she'll be worth every penny.
A tbm like this is essential to the project.
A tbm can go to 30 meters a day.
With conventional excavation,
It would take us a very, very long time.
♪
It's may, and flavia is completely assembled.
♪
Today is a critical day.
Engineers are going to fire up the machine
For the very first time to start digging.
Project lead mario ensures engineers double-check
That every system is working perfectly
Before he pushes the start button.
[ speaking foreign language ]
Narrator: Time for the big decision.
Now it's okay.
Narrator: Tunneling is go.
This is the crucial moment mario and his team
Have been working towards for one year.
So...
♪
Narrator: The machine spins into action
And begins to burrow through the solid mountain rock.
With the machine finally digging forward,
Lead engineer giac and his team face the next big challenge.
[ speaking foreign language ]
Narrator: They must install the huge concrete rings
That will form the new tunnel walls
Directly behind the cutter head.
♪
As the machine grinds its way through the alps,
It leaves bare granite walls behind it.
There's a risk that any loose rock could fall
And crush machinery.
The concrete rings, called tubbing,
Are designed to prevent this,
But installing these heavy unwieldy slabs of concrete
Precisely is a huge engineering challenge.
This is how they plan to do it.
♪
First, workers use a robotic arm
To slide the four-ton sections of tubbing into place.
Each piece contains two thick waterproof membranes
And is strong enough to protect against rock falls.
♪
The sections sit inside
The boring machine's metal shield.
♪
Once the ring is complete, the shield moves forward,
And the workers pump fine gravel
Between the tubbing and the rock.
This helps water drain down and out at the base.
♪
Finally, they install power,
Signal systems, and rails.
The end result --
A superstrong, watertight railway tunnel
That should last for 200 years.
Narrator: Giac and his team must lay
The first set of rings perfectly
Because getting this step wrong
Could cause serious structural problems for the whole tunnel.
♪
♪
Narrator: On the italian side of the brenner base tunnel,
Main engineer giac and his team
Are installing a crucial section of tubbing.
Workers use a remote-control unit
To carefully lift each piece of concrete tubbing.
Precision here is key.
[ speaking foreign language ]
Once a piece of tubbing is in place, they cannot remove it.
This is high-pressure, highly skilled work.
As they work their way around the ring,
They must constantly check that they align each piece properly.
No, no, no, no, no! [ speaks foreign language ]
Narrator: It takes just 10 minutes to lock
All seven sections of each ring into place.
The last piece is critical.
Only if the key fits will they know for sure
That they have built this ring correctly...
Man: [ speaks foreign language ]
Narrator: ...And can continue to tunnel forward.
[ speaking foreign language ]
Narrator: One ring down, 7,999 to go.
It's a relentless battle for giac's team
To supply enough tubbing to build the rings
As the tunneling machine forges forward.
If we don't have a ring ready and installed for the tbm
To advance and get ready for the next excavation,
There's no way of advancing, so the supply line is critical.
Narrator: Engineers have come up with an ingenious solution
To keeping this machine fed with tubbing.
They make the tubbing from the excavated rock itself.
The digging machines excavate around 2,000 tons
Of debris every day.
A series of conveyor belts transports
The 8.6 miles out of the tunnel
To this custom-built factory.
Here workers recycle the rock
And transform it into the ring segments.
♪
Carlo is the head of the 190-strong
Tubbing-factory team.
They mix broken rock from the tunnels with sand and cement
To give a superstrong blend of concrete.
Next, they pour the mix into precision-built molds
And leave it to set at 113 degrees fahrenheit.
To keep up with demand, carlo has to produce
42 pieces of tubbing every single day.
A train transports the completed pieces of tubbing 8.6 miles
Down to giac's team at the tunnel face.
[ speaking foreign language ]
Narrator: The journey gets longer
As the tunnel grows deeper into the alps,
And because they move so slowly,
Trains must leave every single hour,
24 hours a day, 7 days a week
To keep pace with the digging machines.
Once the tubbing arrives,
Giac's team races to fit in place in the tunnel wall.
♪
Each piece of tubbing should hold firm
For the next 200 years.
♪
At the opposite end of the railway tunnel in austria,
Engineers are tackling a very different challenge.
One of the biggest problems tunnel engineers face
Is determining what rock lies directly ahead
Of the tunneling machine.
When you are dealing with a base tunnel,
You're dealing with some degree of unknown geology.
It is vital to have a pilot tunnel.
Narrator: The bigger digging machines,
Such as flavia,
Follow a smaller 16-foot-wide exploratory tunnel
That runs underneath and in between the two main tunnels.
The italian-bound exploratory tunnel
Is 13 miles into its 18-mile journey.
It's being drilled by this special digging machine
That is open rather than closed.
This allows the team to see and inspect the bare rock.
Our tbm is pretty much naked, you know?
You can see all the parts.
Narrator: Being exposed to the bare rock
Means it's tough work for foreman babyuk
And his team of specialists.
[ wrench thuds ]
Narrator: But the team's efforts will pay off
When the main tunnels catch up.
♪
It's now early summer.
At the italian entrance to the tunnel,
The first of the two large tunnel-boring machines
Grinds steadily towards the austrian border.
Workers here are also racing to assemble
The second digging machine.
♪
But just south of the main site, a short section of tunnel
Means engineers can't use their lengthy tbms.
♪
They have no option but to use powerful explosives.
[ explosion ]
♪
♪
Narrator: In central europe,
Engineers are digging the longest railway tunnel
In the world through the alps between Italy and austria.
[ speaks foreign language ]
Narrator: On the italian side of the project,
Part of the main tunnel is too short
To justify using a huge boring machine,
So geologist stefano and his team of specialists
Have to use an alternative -- powerful explosives.
[ speaking foreign language ]
Narrator: When a section of tunnel
Is too small to use a tbm,
The team uses explosives instead.
They pack 880 pounds of dynamite
Into over 100 precision-bored holes
In the tunnel face by hand.
[ explosion ]
They detonate them in a carefully controlled pattern.
This removes the rock they want gone
While leaving the tunnel walls intact.
Finally, they spray on quick-drying concrete
To stabilize the tunnel.
By triggering up to two blasts every 24 hours,
They can dig 32 feet of new tunnel every single day.
♪
First, engineers use this huge laser-guided drilling machine
To create the holes the explosives will sit in.
♪
♪
They have to drill each hole with millimeter precision
To create the perfect blast.
If they get it wrong,
The rock won't break away from the face properly,
Exposing the team to dangerous overhangs.
Once jumbo is finished drilling the holes,
It's time to bring in the explosives.
♪
Demolition expert carmelo has been blowing things up
For a living for over 20 years.
He's responsible for the 880 pounds of dynamite
Used in today's blast.
Dealing with this much explosives
Requires nerves of steel.
♪
Carmelo and his team carefully pack the explosives
Into the holes drilled by jumbo.
♪
They will set off each charge with a millisecond delay
From the one next to it.
This should break the rock into small chunks
Rather than big unwieldy slabs.
Carmelo himself connects the fuse.
[ indistinct conversations ]
♪
Narrator: With the charges set,
The team retreats to a safe position
And waits for the final signal that they are clear to blast.
[ speaking foreign language ]
[ explosion ]
♪
Narrator: Stefano must check the condition of the rock face
Before any further blasting can be done.
He hunts for potentially dangerous cracks.
Stefano needs to get close to the freshly exposed rock face
To make his assessment.
There's a high risk of falling rock here.
All work is suspended while stefano assesses the rock face.
Stefano gives the all clear.
[ speaks foreign language ]
Narrator: Next, the team uses diggers and dump trucks
To remove the 400 tons of broken rock
And take it to be recycled into tubbing rings.
♪
It takes four hours to completely clear the tunnel.
Finally, they spray on quick-drying concrete
Called shotcrete to stabilize the tunnel walls
Until a thicker concrete wall is installed,
16 feet of new tunnel in just 16 hours.
For the blast team, it's a good day's work.
♪
12 years into this titanic tunneling mission,
The teams on both the italian and austrian sides
Are making good progress.
The two won't meet in the middle for another two years,
But making sure they line up perfectly
When they do is a huge challenge.
On a tunnel this long,
The slightest wrong turn can have huge consequences.
When you're tunneling through a mountain,
There's no external line of sight
To check you're going in the right direction.
You're tunneling in the dark.
♪
♪
Narrator: In central europe on the austrian side of the alps,
Tunnel surveyor patrick young is in charge of making sure
The exploratory tunnel stays on course.
It's a huge responsibility.
Young: The drilling machine is a jet.
The pilot is the driver, but we're the navigator.
We're telling him where to go,
Which way, left, right, up, down.
We're controlling the work,
Making sure it's all moving in the right direction.
Narrator: This is how he does it.
First, engineers use satellite gps
To map the mountain down to 1/4-inch accuracy,
Creating reference points on the surface
And precisely plotting the route of the tunnel,
But deep underground, they can't use gps.
Without knowing exactly where the tunneling machine is,
It could easily veer off course.
To solve this problem as the machine digs,
Surveyors use a series of lasers
To take super accurate measurements of the distance
And angles it has traveled,
Leading all the way to the reference points
On the surface.
From these measurements, engineers calculate
The route the tunneling machines have taken
And keep the drivers on course,
But they will only know if they've got their calculations
Right when both tunneling teams eventually meet in the middle.
Patrick and his team must constantly
Check the tunneling machine's progress as it moves forward.
♪
They work 24/7.
♪
If the tunneling machine moves without accurate measurements,
It will quickly drift off course.
Young: As a tunnel surveyor, it is quite a lot of pressure.
It's not the easiest environment to work in.
There's explosions.
There's trucks and diggers
Driving in every direction.
Narrator: Patrick has mounted laser-surveying devices
Along the length of the tunnel.
As the tunneling machine advances,
He has to shift them to keep up with it.
Young: Going to go to the very front of the machine now,
And we have to rebuild the laser.
At least once a day, maybe twice a day,
We have to come down here and scoot the laser forward.
♪
Narrator: Patrick quickly moves the laser forward
And starts his precision measurements of checks
And double-checks.
When the laser hits this target,
Plate sends the information
Back into the main cabin
Where the driver then sees
All the information that he needs.
The work we do is vital.
Without our laser, in a very quick time,
It's going to go in the wrong direction.
Narrator: After a few final checks,
Patrick confirms that the control cabin
Is receiving the correct data,
And the tunneling machine can move forward
Knowing it's on the right path.
Young: We completed everything for today.
We're perfectly on track.
Our little paper airplane means we're receiving data.
The machine is three centimeters above the tunnel axis.
That's how they want it to be.
♪
Narrator: As the tunnels burrow deeper through the mountain,
Engineers face another herculean challenge.
Once the tunnel is complete
And trains are running through here,
Engineers need to be able to rescue passengers
In an emergency.
The longer the train tunnel,
The harder the rescue mission becomes,
And this will be the longest underground railway
In the world.
When you bring passengers in a tunnel this long,
You need to think about safety,
And of course the major threat is fire.
Narrator: One of the worst tunnel fires in recent history
Occurred on the morning of March 24, 1999.
A truck catches fire at the center
Of the seven-mile-long mont blanc road tunnel.
Temperatures soar to over 1,800 degrees fahrenheit,
Destroying vehicles and the tunnel lining.
It takes firefighters almost three days
To extinguish the inferno.
The fire claims 35 lives.
Tunnel builders today have to assume the worst and plan
For any emergency.
The brenner base tunnel is going to be the longest in the world,
So if the worst happens, how can engineers keep passengers safe?
♪
♪
Narrator: 3,000 feet below the surface of the alps,
Engineers are building
The longest railway tunnel in the world.
They're working to overcome a critical challenge.
If a fire occurs inside the railway tunnel,
How do you keep passengers safe
When the nearest exit could be 18 1/2 miles away?
The overall idea is to get rid of the smoke,
To get people away from the smoke,
Which is one of the main hazards
That we have once a fire occurs in a tunnel.
Narrator: This is how they plan to do it.
Engineers are building three emergency stations,
Called refuges,
12 1/2 miles apart deep in the heart of the mountain.
If a fire breaks out on board a train,
The driver won't stop until they reach the nearest refuge.
Here an escape route leads through fireproof doors
Into cross tunnels.
These open out into a 1,500-foot central refuge tunnel.
To stop the refuge from filling up with toxic fumes,
Special ventilation fans
And ducts extract the smoke from the train.
They safely draw it away from the passengers
Through a separate channel overhead.
With the fire securely sealed in one tunnel,
Rescue workers use the second tunnel
To transport passengers from the refuge to safety.
♪
Rosella audino is part of the team
Building the italian safety station.
Rosella has to inspect and sign off all work
On the surrounding tunnels
Before they can start building the emergency station.
With this system in place,
Passengers can access the emergency station quickly
And wait in safety until a rescue train gets there.
This ingenious safety system has added $43 million per station
To the cost of the tunnel, but in a tunnel this long,
It's essential if the worst does happen.
♪
On the italian side of the alps,
The first of the two main tunneling machines
Is already 1/2 mile into its 8.6-mile journey.
♪
Now, after four months of work
Assembling the second tunneling machine,
They are gearing up to set that off, too.
It's a huge moment for project lead giorgio
And the whole team.
Today is a special day in our project.
This is the day when the last tbm
Starts to the border.
Narrator: Tunnel managers have organized a massive celebration
To launch the last tunneling machine
On its epic 8.6-mile journey.
[ speaking foreign language ]
Narrator: In a time-honored tradition,
A priest christens the tunnel-boring machine.
They will call her virginia.
It's taken the team more than 2,000 hours
To get this massive machine ready.
Finally, it's time to start virginia up
And break into the rock wall.
[ speaking foreign language ]
♪
[ cork pops ]
[ applause ]
Narrator: Now all tunneling machines are digging.
They won't stop until they break through
At the italian-austria border beneath the heart of the alps.
Everybody that has worked on the project
Takes pride in what they have done.
Narrator: This megaproject is a once-in-a-generation endeavor.
When the railway tunnel opens in 2028,
Giorgio and his team will have excavated
More than 140 miles of tunnel.
Over 200 high-speed trains a day will form a vital new artery
From the north of europe to the south,
Slashing journey times for freight and passengers.
Thanks to the longest railway tunnel in the world,
Traveling across the alps will never be the same again.
♪