Afrikaans
Akan
Albanian
Amharic
Arabic
Armenian
Azerbaijani
Basque
Belarusian
Bemba
Bengali
Bihari
Bosnian
Breton
Bulgarian
Cambodian
Catalan
Cebuano
Cherokee
Chichewa
Chinese (Simplified)
Chinese (Traditional)
Corsican
Croatian
Czech
Danish
Dutch
English
Esperanto
Estonian
Ewe
Faroese
Filipino
Finnish
French
Frisian
Ga
Galician
Georgian
German
Greek
Guarani
Gujarati
Haitian Creole
Hausa
Hawaiian
Hebrew
Hindi
Hmong
Hungarian
Icelandic
Igbo
Indonesian
Interlingua
Irish
Italian
Japanese
Javanese
Kannada
Kazakh
Kinyarwanda
Kirundi
Kongo
Korean
Krio (Sierra Leone)
Kurdish
Kurdish (Soranî)
Kyrgyz
Laothian
Latin
Latvian
Lingala
Lithuanian
Lozi
Luganda
Luo
Luxembourgish
Macedonian
Malagasy
Malay
Malayalam
Maltese
Maori
Marathi
Mauritian Creole
Moldavian
Mongolian
Myanmar (Burmese)
Montenegrin
Nepali
Nigerian Pidgin
Northern Sotho
Norwegian
Norwegian (Nynorsk)
Occitan
Oriya
Oromo
Pashto
Persian
Polish
Portuguese (Brazil)
Portuguese (Portugal)
Punjabi
Quechua
Romanian
Romansh
Runyakitara
Russian
Samoan
Scots Gaelic
Serbian
Serbo-Croatian
Sesotho
Setswana
Seychellois Creole
Shona
Sindhi
Sinhalese
Slovak
Slovenian
Somali
Spanish
Spanish (Latin American)
Sundanese
Swahili
Swedish
Tajik
Tamil
Tatar
Telugu
Thai
Tigrinya
Tonga
Tshiluba
Tumbuka
Turkmen
Twi
Uighur
Ukrainian
Urdu
Uzbek
Vietnamese
Welsh
Wolof
Xhosa
Yiddish
Yoruba
Zulu
Narrator: In germany, this team of elite engineers
Is embarking on an epic endeavor.
They're attempting to build one of the fastest trains on earth.
Made from nearly 500 tons of aluminum and steel,
They have just 12 weeks to build this high-tech supertrain.
To construct this colossus,
The team must battle tight deadlines...
We don't want delays.
Narrator: ...35,000 individual components...
And punishing safety tests.
This spectacular train ranks
In a league of ambitious new engineering wonders
That are bigger, faster, taller, and more advanced
Than anything ever constructed before.
This is the inside story
Of the extraordinary challenge of building these giants.
-- Captions by vitac -- www.Vitac.Com
Captions paid for by discovery communications
♪
Turkey, a country with a growing population
Of 81 million,
Spread across an area nearly twice as big as california.
♪
With 40 million people a year choosing to travel by train,
Its aging rail network is struggling to keep up.
To overcome this problem,
Turkey's national railway
Has tasked german train builders siemens mobility
To design and construct
19 new state-of-the-art high-speed trains.
The system, called the velaro turkey,
Should revolutionize turkey's rail network.
It can reach speeds of 200 miles per hour
While carrying 500 passengers at a time.
This is the super-high-speed train the team must build.
Nearly 500 tons of aluminum and steel
Make up its eight cars
That pierce through the air almost silently
Thanks to their advanced aerodynamic design.
Underneath the cars, 16 760-horsepower electric motors
Drive the train forwards.
Inside, soundproof windows, ergonomic seats,
And a hospitality bar mean passengers travel in style.
Above, a finely balanced pneumatic arm
Draws electricity from an overhead wire.
Capable of reaching 200 miles per hour,
This will be one of the fastest passenger trains in the world.
♪
But building such a powerful machine won't be easy.
♪
When traveling at such high speeds,
Nothing can be left to chance.
Aerodynamics engineer dr. Manuel gageik
And a team of designers
Spend years crafting every aspect of the train
Long before it goes into production.
During the build,
Engineers must stress-test every single component
And assemble each section with millimeter precision.
This is how they plan to do it.
First, workers weld
Precision-cut sheets of aluminum together
To form the train's aerodynamic cars.
Next, the team attaches the car doors
And bolts the pneumatic arm, called a pantograph,
Onto its roof.
Inside the car,
Electricians connect over 18 miles of cables
Before workers install carpets and hundreds of chairs.
♪
Next, engineers assemble the bogies.
These structures sit beneath each car
And contain the powerful motors, brakes, and wheel set.
Finally, they join the eight cars
Together to make a train,
Fitting a hand-built nose section to cars on each end
So it can travel at top speed
In either direction.
Work begins in the small town of krefeld, germany.
♪
Inside this vast, 2.7-million-square-foot factory,
2,200 welders, mechanics, and machinists
Work against the clock
On a sophisticated train production line.
They have just three months to build the first of 19 trains,
Then put it through its paces at their test track
In advance of delivery to the client.
Inside unit 38 is where velaro turkey is born.
And it all starts with an undercarriage.
Two super-strong, hollow aluminum beams
Make up the backbone of each car,
Precision-drilled with hundreds of fixing points
For electronics, brakes, and the wheel system below.
Three tough plates of aluminum tie the girders together
While four crossbeams add extra strength.
In charge of constructing this crucial section
Is mechanic patrick klingbeil.
My work for today is to put the floor into the undercarriage,
Get it on the right position,
And then weld the complete floor.
That's my work for today.
Narrator: Patrick assembles the six strong support girders
In a huge jig.
He now has just four hours to attach the sheeting
That will form the floor.
Klingbeil: We have dates to finish this,
Five hours for this part, six hours for this part.
Narrator: Luckily for patrick,
Working with trains is in his blood.
My father always worked with trains.
Many years later, I build them now.
[ laughs ]
♪
Narrator: His first challenge is to lift the 880-pound floor
And place it on top of the undercarriage.
Very, very heavy. That's very, very dangerous.
So I check everything.
Narrator: He must position it with pinpoint accuracy.
♪
His next challenge is to securely weld the floor
To the undercarriage.
The stress exerted onto the undercarriage at high speeds
Will be immense,
So these welds must be incredibly strong.
Patrick has to go over each joint up to seven times
To ensure its durability...
♪
...And then use ultrasound to scan the welds once complete.
If the joint contains any tiny air bubbles,
He will have to do it all over again,
Causing a costly delay.
Thankfully, the welds are good.
Yes, I'm happy. [ laughs ]
It looks perfect.
Yeah, I think it's good.
♪
Everything is okay. Now I got a break.
Narrator: Now workers transport this undercarriage
To the next stage of production,
The milling machine, where one wrong move
Could ruin the entire 82-foot-long structure.
♪
Narrator: In germany, a team of engineers
Is building one of the fastest trains in the world.
They've welded together the tough backbone of the car,
The undercarriage.
Now they have to finish it
Inside a vast milling machine.
This machine measures 98 feet long
And 26 feet high
And can carry loads of up to 55 tons.
Bjoern seiler oversees its operation
Right here in front of us,
We can see the very front end of the high-speed train
With the typical aerodynamic shape of the nose.
Narrator: The machine bores holes into the aluminum
So mechanics can attach components
Such as seating and piping.
♪
One mistake here,
And the whole undercarriage will be ruined.
If the wheels set doesn't fit properly, it costs time.
It costs money.
We don't want delays.
Narrator: Bjoern used his hardened steel tools
To drill holes into the aluminum
With incredible accuracy.
I'm a technical guy, so I love this machine.
And he's my favorite operator.
Narrator: But it's dangerous work.
Bjoern and his operator must control the machine
From behind a protective screen
So they're not peppered with sharp metal shards.
During milling operations,
The tool is spraying aluminum chips,
And it's dangerous to be inside the booth.
Narrator: It takes 12 hours and 12 different tool heads
To drill. The entire 82-foot-long floor.
The milling is nearly finished.
You did an excellent job.
And the velaro undercarriage
Goes to the next manufacturing step.
♪
Narrator: Workers now transport the undercarriage
To the next build station.
They will transform it into a fully formed car.
First, welders will attach
The two 82-foot-long sidewalls.
A crisscross structure sandwiched inside
Makes them strong and light.
Next, workers attach the curved roof,
Welding it to the car walls
While end pieces keep the whole structure stiff.
♪
It takes 30 days, but at last,
The body of the car is complete.
All that's missing now is its streamlined nose.
These noses are vital,
Because high-speed trains have a weakness --
Tunnels.
Tunnels create huge engineering challenges
For trains traveling at high speed.
♪
As a train enters a tunnel,
It compresses the air in front of it.
This creates pressure waves that race ahead and cause a boom
As they reach the end of the tunnel.
[ explosion ]
Over time, this could damage the train, tunnel walls,
And nearby buildings.
To prevent this,
Engineers use computer modeling and wind tunnel tests
To create an aerodynamic curved nose
At the front of the train.
This reduces shockwaves and eliminates tunnel boom.
They also make the sides of the cars with no protruding parts
So the air passes harmlessly around it.
♪
This keeps the train and tunnel safe.
♪
This is the first stage of the head of the train.
I'm gonna fix parts of the head together.
Narrator: Experienced mechanic ahmet is in charge
Of building this complex nose section.
He must seamlessly join together 14 different shapes
Into a complicated series of curves.
You can see the shape, the curve of the part.
Narrator: He starts by clamping curved,
5-millimeter-thick sheets of aluminum
Together inside a huge jig.
Only once every piece is in place
Can he weld them.
♪
Saukkan: Step by step, we put them one by one together.
It's like a jigsaw puzzle.
Narrator: The first 13 sheets fit just fine.
But the final 165-pound piece
Proves problematic.
This is the last part of the puzzle,
The top of the head of the train.
It's difficult to, with the crane,
It's difficult to control it.
♪
It's not in the exact position
We have to put the components a little bit further.
♪
[ metal clanks ]
Narrator: Finally, all the pieces are in place.
After carefully welding the joints,
The nose is now ready.
♪
The next challenge is to join it to the rest of the car.
♪
The train nose needs to fit perfectly,
Or it will set the build back weeks.
The man for the tricky job ahead
Is master mechanic mustafa.
Gunay: It's difficult.
The move is challenging. You need concentration.
Narrator: Mustafa uses a powerful hoist
To carry the 1-ton nose
165 feet over the crowded factory.
Controlling it is tough.
Gunay: Because it's like a pendulum,
I don't want to swing too fast.
Narrator: He reaches the rest of the car safely.
♪
Now he needs to fit it into place.
It's a tight squeeze.
♪
Stop!
♪
Narrator: Success.
For the moment, my work is finished.
Narrator: The aluminum shell of the front car is now complete.
But it will take serious power
To accelerate the whole train to its top speed.
Without a bogie, a train isn't going anywhere.
Narrator: In germany, engineers are building
One of the fastest trains in the world, the velaro.
It will take a huge amount of power
To accelerate this train to top speed.
This poses a problem for its designers.
So how do you accelerate a nearly 500-ton train
To 200 miles per hour as quickly as possible?
♪
On traditional trains,
One heavy engine pulls the rest of the cars from the front.
In this layout, just a few wheels drive the entire train.
With such limited grip, if it tries to accelerate quickly,
The wheels simply spin.
[ metal screeching ]
So instead, the designers of the velaro
Distribute 16 smaller motors throughout the train.
♪
Now, 32 wheels along its entire length
Power it forwards, giving it far more grip.
This nearly 500-ton train can now accelerate
To 200 miles per hour in just six minutes.
♪
And if one motor fails,
The others still have enough power
To get the train to its destination on time.
♪
Engineers install the motors over 600 miles away
From the german train factory, in graz, austria.
This historic city is home to over 300,000 people
And a high-tech, 750,000-square-foot factory.
♪
This is where workers build the bogies,
The complex units that hold the powerful motors
As well as the wheels and brakes.
♪
With just seven weeks to go, the pressure is on.
♪
Overseeing the bogie frame build is mechanic daniel larch.
A bogie is the powerhouse of a train.
Without a bogie, a train isn't going anywhere.
Narrator: First, his team bolts together
120 separate components and welds them into position
To form a super-strong, 1-ton frame.
♪
Next, they fit the motors, brake pads, and cables,
Then assemble the wheels.
♪
To do this, they grease a specially hardened steel axle
And slide the disc brakes on,
Followed by the nearly 800-pound wheels.
These are custom machined with a diameter of over 3 feet
And accurate to within 1/10 millimeter.
A powerful wheel press secures them into position.
♪
Finally, they lift the frame onto the wheels.
This is a critical stage.
Because the train travels at such high speeds,
It's vital that the bogie frame and wheels
Are perfectly aligned.
♪
As it travels,
Steel flanges on the wheels keep the high-speed train on track.
But if the weight on each wheel isn't even,
The wheel carrying less weight can climb up the rail.
[ metal whining ]
These oscillations can generate noise,
Extra wear, and instability.
To make sure this never happens.
The train builders insure every single bogie
Is perfectly balanced, with an equal amount of the car's weight
Pressing down onto each wheel.
♪
To make sure all trains in the fleet run true,
Every bogie must pass a stringent safety test
Before it leaves the factory floor.
We roll it into the press
And simulate the weight of the car shell onto the bogie.
Narrator: Once in position, they press down on the bogie
With a load of 18 tons.
This is a trailer bogie. We put on each side 9 tons.
Narrator: When running, each train
Will carry thousands of passengers a day.
So it's vital that every bogie is perfectly balanced.
Larch: So, this measures the forces under each wheel
To make sure the bogie is balanced.
After our hard work, this is the moment of truth.
♪
Now can see the forces on each wheel.
Narrator: After many days of intricate work,
This bogie passes its test.
I'm very happy with the test. It's within tolerance.
Narrator: The bogies are now ready
To be united with their cars back in germany.
But with just five weeks
Until the cars must depart for the test track,
It's now a race against time.
We have a big challenge, and it's also difficult.
Ah. Stop, stop, stop, stop, stop it!
Narrator: In germany, this team is in a race
To construct a fleet of pioneering high-speed trains.
♪
They've sprayed the aluminum cars
With seven layers of protective paint
And installed the complex mechanical doors.
They now have just five weeks to go
Before fully assembling the first train.
But some vital components are still missing.
♪
Today, mechanic lukas koscielski is tasked with installing
The custom-built, 27-square-foot windscreen.
It's difficult to do, and you need to have special training
For this kind of work.
♪
Narrator: At high speed, the curved windscreen
Is under enormous pressure from the incoming air.
Each one weighs 330 pounds,
Costs over $20,000,
And has been specially designed for strength.
Koscielski: High speed trains go fast,
So the windscreen needs to be thicker than on other trains.
The thickness is about 20 millimeters.
Narrator: This super-strong windscreen
Can resist more than 4,000 pounds of pressure.
♪
First, lukas uses a robotic arm
With rubber suction mounts
To lift the windscreen above the train.
I'm getting nervous.
Narrator: One wrong move, and the whole piece would be ruined.
♪
Next, he has to glue it in place.
This is my gluing machine.
I first have to put some glue in the corner...
♪
...To be sure that everywhere is glued and no bubbles.
♪
I want it to be perfect.
♪
♪
Narrator: Lukas now carefully lowers the windscreen
Into position.
♪
♪
I'm nearly finished.
I need to put the windscreen in the right position.
♪
Narrator: Fitting the windscreen in exactly the right place
Requires some elbow grease,
Help from a colleague,
And a bit of brute force.
♪
Ta-da.
[ laughs ]
Narrator: Lukas' boss gives it a quality check.
♪
All is good.
I'm happy it's finished. It fits perfectly.
My job is done.
♪
Narrator: The head car now looks nearly complete from the outside
With its larger parts, windows, and windscreen fitted in place.
♪
But the train has an astonishing 35,000 components.
Many of the most critical are out of sight
Beneath the car floor.
Overseeing their installation is mechanic petra hiebig.
Hiebig: Everybody thinks it's just normal that things work.
Is it nice? Is it comfortable?
Can I get something to eat?
And it's a very luxurious train inside.
But the other parts have to work also.
Most importantly, of course, the brakes
Are vital to the passenger.
♪
Narrator: Petra's team need to install 165 feet of brake piping
Underneath each car.
Hiebig: It's about millimeters, not centimeters.
♪
Sometimes you just need some brutal force
To put things in place.
♪
Narrator: But amazingly, one of the most important parts
Of the braking system is a box of sand.
This puts sand onto the rails for the braking.
Narrator: If the train brakes during icy or wet conditions,
Its metal wheels can skid along the smooth steel rails.
So special boxes release sand onto the track
In front of the wheels, helping them grip.
This is particularly important for winter in turkey,
Where it can reach minus-40 degrees
Hiebig: Train needs sand because metal on metal is just very smooth,
And you need sand to brake.
Very important if you are going on high speed.
Narrator: With just 21 days to go
Until the car departs for the test track...
This is the one.
Narrator: ...It's crucial
That teams don't fall behind schedule.
So many parts. It's all about time.
Getting a bit late.
Need to put more effort on it to make the deadlines.
♪
Narrator: Finally, the brake system
And sandboxes are installed.
♪
After 10 weeks of work,
The car body is now almost finished.
♪
It needs just one more vital structure --
The power source.
♪
Narrator: In krefeld, germany, a team of engineers
Has just two weeks to finish the head car
Of one of the fastest trains in the world.
They've almost completed the car body.
Now they need to top it off
With an ingenious power source called a pantograph.
The pantograph supplies all of the train's power.
It transmits electricity from the high-voltage cable overhead
To the motors below to keep the wheels turning.
It must maintain a constant connection,
Even at 200 miles per hour.
♪
To do that, the top of the pantograph
Can move up and down by over 3 feet.
An air-controlled piston acts like suspension,
Pushing up with precisely the right amount of force,
While the conductive elements on top are formed of carbon strips
To minimize friction and reduce weight.
Every piece must work flawlessly.
Lose contact for a fraction of a second,
And the enormous electric current
Could cause a plasma arc,
Burning through the air at 18,000 degrees fahrenheit.
♪
Today, evan avci must supervise
The testing of this pantograph in position on the car.
[ speaking german ]
Narrator: The team has already installed
The 350-pound pantograph onto the roof,
Bolting it into position.
♪
Now evan starts the test.
The force of the pantograph must read 70 newtons.
More than that, it would push too hard.
And wear out the overhead wire.
Less than that, it would push too little,
And contact would be lost.
Now the pantograph rises to its full height
Of 5 1/2 feet.
Next, they measure the force.
Success.
It reads the correct force of 70 newtons.
The pantograph passes its test.
♪
It's now the night shift at the train workshop.
And the powerhouse of the train,
The bogies, have arrived from austria.
♪
Mechanics hans and brocky are in charge of lifting
The 40-ton car shell onto its two bogies
With pinpoint accuracy.
We have a big challenge, to put the car on the bogies.
And it's difficult.
It's a tight schedule.
Narrator: The pressure is on.
The plan tonight is now lift the train up.
Narrator: They first use six stationary hoists
To lift the car up,
Then lock it in place 5 feet above the factory floor.
♪
Next, they roll the two 11-ton bogies into position.
This bogie is for under the driver's seat.
Narrator: They must keep the car completely horizontal
As they lower it down,
Or it could fall over.
♪
As tensions mount,
The car carefully lowers into position.
♪
Ah. Stop, stop, stop, stop, stop it!
Yeah, yeah, yeah.
Yeah, it's good. Alright.
Yeah.
Finally, hans and brocky
Securely bolt the bogies to the car.
It's a huge milestone for the team.
So, fine, brocky.
♪
With the bogies attached,
The head car is finally complete.
♪
After a final quality control check...
♪
...And a special train shower to make sure it's watertight...
♪
...The cars are ready for the test track.
Engineers now transport them two at a time by rail
From the factory in krefeld
To the test track 40 miles away at wegberg.
♪
Here they will put this pioneering train
Through a series of grueling trials.
♪
Pushing the velaro turkey to its limits
Is manager stephan ruiss.
His first job is to fully join
All eight individual cars into a train.
Because the last test arrived
The eight cars roll out
And a special joint called a coupler
Locks them together.
[ beep ]
♪
The eight-car train is finally complete.
♪
It's now ready for its toughest test of all --
The emergency brake test.
♪
Narrator: In germany, engineers are pushing
One of the fastest passenger trains in the world
To its limits on the test track.
Today, manager stephan will conduct
The most critical test of all.
So just how do you brake a nearly 500-ton juggernaut
Traveling at 200 miles per hour?
♪
Traditional trains slow down by pushing brake pads
Directly onto their wheels. At high speeds,
These brakes get incredibly hot and quickly wear out.
♪
To prevent this problem,
The velaro has two separate braking systems.
At high speeds, the electric motor can switch modes
And slow the train down.
This is friction-free, so minimizes wear.
Only once the train is slowed to 25 miles per hour
Does it engage 128 air-powered disc brakes.
These use pneumatic pistons to drive toughened pads
Onto three sets of discs mounted on the wheel axle.
Working together, these two systems
Should slow this nearly 500-ton train
From 200 miles per hour to a complete halt
In just 100 seconds.
♪
A lot rides on this first emergency brake test.
If the train fails, it will delay the entire operation.
Taking charge of the train today is veteran driver alex.
♪
Alex doesn't have enough track to reach top speed,
So he powers the train up to 75 miles per hour.
When stephan gives him the signal,
He will slam on the brakes.
At this speed,
The train should stop in under 30 seconds,
Much faster than traditional trains.
The question is, will it stop in time?
It's the moment of truth.
Okay. Now.
[ air hissing ]
Narrator: The electrical brakes kick in,
And the train starts to slow.
♪
Next, the mechanical brakes take over.
[ metal whining ]
30 seconds later, the test is complete.
The train has passed.
It's a massive relief for the team.
Now the train can be sent to turkey,
Where it will run at high speeds for the first time.
This train is ready to depart.
♪
Special freight trains transport it by rail
1,800 miles across eastern europe.
♪
It takes two weeks until it arrives at its destination,
Ankara, turkey.
♪
This fleet of supertrains
Now speeds along 3,000 miles of track
And transports millions of passengers a month,
Revolutionizing turkey's rail system.
Now, finally, one of the world's fastest high-speed trains
Is ready to ride.
Gageik: I'm very proud of the velaro turkey.
It's my favorite train,
And I'm very happy with the end result.