Afrikaans
Akan
Albanian
Amharic
Arabic
Armenian
Azerbaijani
Basque
Belarusian
Bemba
Bengali
Bihari
Bosnian
Breton
Bulgarian
Cambodian
Catalan
Cebuano
Cherokee
Chichewa
Chinese (Simplified)
Chinese (Traditional)
Corsican
Croatian
Czech
Danish
Dutch
English
Esperanto
Estonian
Ewe
Faroese
Filipino
Finnish
French
Frisian
Ga
Galician
Georgian
German
Guarani
Gujarati
Haitian Creole
Hausa
Hawaiian
Hebrew
Hindi
Hmong
Hungarian
Icelandic
Igbo
Indonesian
Interlingua
Irish
Italian
Japanese
Javanese
Kannada
Kazakh
Kinyarwanda
Kirundi
Kongo
Korean
Krio (Sierra Leone)
Kurdish
Kurdish (Soranรฎ)
Kyrgyz
Laothian
Latin
Latvian
Lingala
Lithuanian
Lozi
Luganda
Luo
Luxembourgish
Macedonian
Malagasy
Malay
Malayalam
Maltese
Maori
Marathi
Mauritian Creole
Moldavian
Mongolian
Myanmar (Burmese)
Montenegrin
Nepali
Nigerian Pidgin
Northern Sotho
Norwegian
Norwegian (Nynorsk)
Occitan
Oriya
Oromo
Pashto
Persian
Polish
Portuguese (Brazil)
Portuguese (Portugal)
Punjabi
Quechua
Romanian
Romansh
Runyakitara
Russian
Samoan
Scots Gaelic
Serbian
Serbo-Croatian
Sesotho
Setswana
Seychellois Creole
Shona
Sindhi
Sinhalese
Slovak
Slovenian
Somali
Spanish
Spanish (Latin American)
Sundanese
Swahili
Swedish
Tajik
Tamil
Tatar
Telugu
Thai
Tigrinya
Tonga
Tshiluba
Tumbuka
Turkish
Turkmen
Twi
Uighur
Ukrainian
Urdu
Uzbek
Vietnamese
Welsh
Wolof
Xhosa
Yiddish
Yoruba
Zulu
[narrator] In the UK,
engineers are taking on a seemingly
impossible challenge.
It'll be a massive feat of engineering.
They're constructing a billion-dollar stadium
on water.
It's probably not the best place to build anything,
let alone a stadium.
This flat-pack design will rise in record time.
Built from pieces made all over the country
to hit a deadline set in stone.
[Colin] We're playing Premier League football.
We can't afford to miss it. We have to hit that date.
The team needs to build in a bomb-strewn site...
[rumbling]
Drilling a pile through something like that would be
game over, really.
...dodge fragile historic structures
and battle wild waterfront winds.
-[radio beeps] -[worker] Keep going, keep going, keep going.
You're so close.
[Alex] The last thing we want is
falling bolts or falling plates.
This incredible stadium
ranks in a league of ambitious new engineering wonders
that are bigger, faster, taller, and more advanced
than anything ever constructed before.
This is the inside story of the extraordinary challenge
of building these giants.
Liverpool, England.
This city is famous worldwide for two things...
[screaming]
...it's the hometown of The Beatles.
And the city's half a million inhabitants are football crazy.
Everton is the city's oldest football club.
The team's stadium, Goodison Park, is a short walk
from Liverpool's famous River Mersey.
In 1892, Goodison became
the first custom-built football stadium in the country.
The thousands of workers from the bustling docks were
the first supporters to pack the stands here.
And establish a loyal fan base that's remained strong
for over 130 years.
Alix Waldron works for the club,
and she comes from a family of Everton fans.
The Park End, row FF, is the seats where I've been
coming for years and years with my family.
I essentially grew up here, coming sort of week in,
week out with my dad and my uncles,
my brother when he was born, and, you know,
it holds so many special memories
and, you know, that family unit that it feels like here.
Goodison Park is precious to the 39,000 fans
that come to every game.
But the old ground is worn and run-down.
There are another 34,000 people on a waiting list for tickets.
Everton Football Club's solution is to build
an ambitious brand-new stadium
that boosts capacity by a third.
The club has turned to world-renowned architect
and stadium expert
Dan Meis.
He's designed ground-breaking sports arenas
from America to Japan.
When I first met with the club,
the brief actually was very clear.
Build a modern football stadium,
but keep that intensity of Goodison.
This is Dan's revolutionary design.
This spectacular venue will
seat more than 52,000 roaring fans
in the UK's steepest terraces to create a wall of sound.
Above the stands, 4,400 tons of structural steel support
a 300,000 square-foot roof capping this sporting cauldron.
Around the outside,
sweeping aluminum cladding
sits above an imposing brick facade
that blends traditional with modern
to reflect its historic Liverpool home.
Finding a site for a new stadium in Liverpool
is a big challenge.
The city is crowded.
There are few areas ripe for redevelopment close
to Everton's spiritual home by the Liverpool docks.
Historically, a lot of the, you know,
the people who work down on the dockyards,
they tend -- you know, they'd be football fans,
they'd be going to Everton matches,
they'd be leaving work here and walking up to Goodison Park
to support the team.
Club director Colin Chong has led the search
for the club's new home for three years.
He and the team have secured a 21-acre riverside plot
called Bramley-Moore Dock.
For a project as big as a stadium,
there weren't really that many sites.
We kept coming back to Bramley-Moore Dock.
Unfortunately, the dock was predominantly water.
Bramley-Moore Dock has been out of use for 40 years.
It's roughly stadium-sized,
but it's submerged under 26 feet of water.
When I had a conversation with the old chairman,
bless his soul, I did explain to him that where we chose to
build the stadium was probably not the best place to build
anything, let alone a stadium.
The team faces a minefield of engineering challenges.
The dock is enclosed by 170-year-old stone walls.
A thick bed of soft silt sits below the water.
The perimeter is dotted with fragile original dock features
and an historic brick tower
that are all protected by preservation orders.
It's probably the worst site
that we could have picked to build on
but it'll be a real unique design.
It's a massive feat of engineering
to look at how do we do this?
The first challenge the team faces is how to turn
this water-filled site
into a solid foundation.
This is how they'll solve it.
First, a boat combs the dock to remove debris.
Next, the team fills the dock
with nearly 16 million cubic feet of sand.
Compactors pound the sand 60 times per minute
with 10-ton hammers.
Then, piling rigs use augers with hollow shafts
to bore holes 52 feet down to bedrock.
The rig operators inject concrete as the augers retract
to prevent the bore holes from collapsing.
Finally, workers push steel reinforcement cages
into the wet concrete before it sets
to create a forest of foundation piles
for the team to build on.
August, 2021.
The stadium team begins raking the bottom of the dock
to clear away any unwanted debris
and makes a very unwelcome discovery.
[Alix] We have found a couple of ordnance devices.
A bomb. Yeah.
Divers identify a total of 12 unexploded
anti-aircraft rounds.
The German Air Force dropped thousands of tons of bombs
on Liverpool in World War II.
Some of the bombs and anti-aircraft shells
failed to detonate,
and they are trapped in the dock's silt.
It's a real danger that a machine on site
could disturb one of these unexploded munitions.
The team evacuates the dock area.
Drilling a pile through something like that would be
game over, really, so it has to happen to make sure that,
you know, it's safe for people
to carry on with the next phases.
Engineers in Liverpool, England
are building a brand-new super stadium
for the Everton Football Club.
An explosive ordnance disposal unit removes the larger devices
to be dismantled off-site
and explodes the smaller devices
next to the dock.
With the danger now handled,
the engineers restart their work.
They need to empty the dock of water.
But simply draining it will allow the massive weight
of the River Mersey to collapse the 170-year-old dock wall,
turning the dock into part of the river.
To solve this problem, the engineers devise
an ingenious solution.
They bring in a special dredger.
It scoops up hundreds of tons of sand from
the mouth of the River Mersey.
The dredger mixes the sand with river water to make a slurry.
It pumps this along a reinforced pipe
directly into the dock.
The sand in the slurry sinks to the bottom of the dock
and displaces the water.
Pumps then drain this water into the river.
The dock itself is never empty at any stage.
And then, eventually, the water will be
completely removed and the sand
becomes a solid mass of material.
After eight weeks of pumping, a giant expanse of sand
emerges from the water.
Two weeks later, the dock is almost completely full.
Giant compactors hammer down the 43,000 square feet of sand.
This makes the dock solid enough
to start foundation piling.
Pile drivers begin drilling down
to the compacted sand and into bedrock.
The hollow drills fill the 24-inch-wide holes
with concrete as they pull up and out of the ground.
Crane teams then insert cages made from steel
to reinforce the concrete.
[worker] Hey, hey, hey, hey!
Seven months and 2,700 piles later,
the stadium team has a solid base to build on.
[worker] Keep going, keep going, keep going.
Now begins the task of constructing
the stadium's concrete skeleton.
[worker] Hold off that.
There's another one in.
It takes the team 10 months to turn a water-filled dock
into a dry and stable foundation.
The next challenge is to build the concrete walls,
floor, and stairs of the stadium.
Now that the crews are working above ground,
they need to factor in the wind.
It's one of the windiest places
and one of the windiest cities in the UK.
So the weather conditions that we're exposed to here
call for a different way,
different methodology of building.
Add to that a deadline of three years
to complete the project,
the team needs a faster way to build with concrete.
The solution is to build the stadium in parts
in a workshop and ship these to the site.
[Colin] Whilst we're actually filling the dock in, carrying out some
of the piled foundations and some of the existing
hardscape, we're manufacturing product off-site.
So as soon as those foundations are ready
to receive a wall, the wall will be in.
This huge factory, 100 miles away in Worksop,
has the task of manufacturing the 30,000 tons of concrete
components that form the Everton Stadium.
400 workers operate giant rigs that produce building
components in hours instead of days.
The computer-controlled machines pour concrete
into a flat mold.
And once it's dry, turn it over
and place it into another mold.
This produces pristine-looking sections of wall that require
no extra finishing when they get to the site.
Everything made inside the factory must fit perfectly.
When a component leaves the assembly line,
there will be no chance for any adjustments.
The team's solution is to give everyone access
to a 3D computer model of the stadium.
There are no paper plans.
The stadium's model directly links with the automated
assembly lines at sites like this one.
Architect Jon-Scott Kohli
runs a digital version of the build process.
This is a master plan for all crews working on the project.
Spending the time of thinking through all of the problems
and, you know, building a sort of a 3D model a bit like this,
where process of getting information to the right people
at the right time so that you can go fast.
At the build site, the workers take delivery of
the first batch of concrete panels to make the core
structures at each corner of the stadium.
The panels arrive on the back of a low-loader.
Workers use a mobile crane to lift each panel
to the installation site.
-[radio beeps] [worker] Hold her there.
The crane operator carefully installs the panels.
[worker speaks indistinctly]
So that the steel attaches to the foundation's threads.
Workers then fill the void inside each panel with concrete
to lock it in place.
The crew repeats this process at each corner of the stadium.
[Alix] The prefab element does allow us to speed up the program.
You know, it does happen quite rapidly before you rise.
You know, you think, "Oh, we're starting that next week,"
and all of a sudden, you know, you're 30% there,
and you think, "That's just flown by."
The stadium's staircases are some of the most challenging
components to install.
Stairs are a critical part of the stadium structure.
They must be large enough and tough enough to support
the tens of thousands of fans
as they make their way to and from their seats.
This is a major test of the pre-built method.
The stairs span multiple levels and have anchor points at both
ends that connect perfectly.
Every element that's going to go to the precast concrete
factory needs to be in the model and needs to be
the right size, the right shape,
it's got to have the right holes in it.
The opening that's formed in the factory has to be
the correct size at the first time.
-[radio beeps] -[worker] Winch up slowly again.
The crane crew needs to raise the 26-foot-long staircase
at just the right angle.
Because when the crane operator
lowers it into the open building,
it must slot between the existing walls
and floor edges without taking any hits.
[worker] Hold off that.
One foot to go. Keep coming down.
The staircase holes must land precisely
on the reinforcement steel.
Hold off that.
There's no room for error.
Engineers in Liverpool are building a brand new stadium
for the Everton Football Club.
-[radio beeps] -[worker] Winch up slowly again.
The crane crew needs to raise the 26-foot-long staircase
at just the right angle.
The staircase holes must land precisely
on the reinforcement steel.
Hold it there.
It fits.
[worker] So, yeah, we're good then.
The crew releases the crane ties and the structure takes
another big step forward.
Just a few months after finishing the foundations,
the multi-level structure is rising up
at each corner of the stadium.
The concrete stair blocks mark out the scale of the site.
Now the engineers must build the four giant stands
in between them.
The concrete facility in Worksop
is producing a steady stream
of prefabricated panels.
But it's now that the team must begin to install
the stadium's steel components.
Typically, we see stadium designs either being built
where the main superstructure, you know,
the structure above ground, is either done in steel
or it's done in concrete.
But here we're doing both.
Trucks deliver large steel beams,
and crane teams lift them to the north and south sides
of the stadium.
[Jon-Scott] The benefit of using both systems is that we're then able
to use even more factories, which allows more
of the stadium to be built kind of at once
and then brought to site and directed quickly.
The steel crews swing into action.
They bolt together the huge steel elements to assemble
the framework that will support the stadium's four stands.
Crews on the east and west sides continue to slot together
prefabricated concrete to join up the four corners.
All these kind of concrete and steel elements are coming
to site and being kind of bolted together
or slotted into place.
It's good for the soul, I have to say,
to be able to kind of see a building like this
growing out of the dock so quickly.
14 months into the build, construction crews
have completed the structure's footprint.
And this 52,000-seater stadium is on the rise.
Steel columns support the roof on three sides of the original
stadium and obstruct the view of the game
for more than half of the spectators.
Every seat in the new stadium at Bramley-Moore Dock must have
an unobstructed view of the pitch.
The roof covers 300,000 square feet.
It needs a huge framework to hold it up.
Across the North and the South stand, we've got these really,
really big trusses that span from one side to the other.
The longest of these spans is about 170 meters.
The tallest of them is about 11 meters high.
I mean, that's -- that's taller than my house, right?
So if you can imagine a residential street,
you know, that is what the scale of those trusses are.
Each of the five spans weighs 220 tons.
They're too large and heavy to lift in one pass.
So the team must use a special technique to lift them
separately in stages.
An off-site factory delivers dozens of beams and columns.
And steelworkers bolt them into giant frames
one third of the trusses' length.
A crawler crane lifts the first 230-foot-long section
and lowers it onto a temporary support tower.
Then, workers lift and bolt the next section
onto the first.
When the entire framework is up and connected,
the crew lowers the support towers,
and the trusses finally hold their own weight,
settling by 17 inches
to finish in precisely the right shape.
This huge steel fabrication plant, 31 miles away
from the stadium, builds the trusses.
The workers here cut, grind, and weld the huge steel
sheets, beams, and tubes
into millimeter-precise structural elements.
It falls to design engineer Alex Heaton to supervise
the installation of these massive steel structures.
The huge size of the roof truss means that his team must
send it to the site one piece at a time.
Alex will spend the next eight months at the stadium site
to oversee and coordinate every aspect
of this monster roof build.
When the trusses start arriving, I'll be putting
the pieces for the trusses on the pitch right near
the container temporary works that we're using
to assemble it.
Low loaders deliver the truss sections.
A crane lifts them to
the center of the stadium, where the pitch will be,
and the steel team assembles them.
The sections are so enormous that the steel team needs
to assemble them, propped up against a row
of giant shipping containers, stacked two units high.
[Jon-Scott] When you suddenly start seeing those being erected against
stacks of shipping containers as if they were Duplo blocks,
then you really begin to understand
the, kind of, the scale of what
we're actually -- what we're actually building here.
Alex checks the angle of deflection
across every truss section.
The piece is 30 meters long.
If this is only, you know, an 0.1 degree out,
that's a long distance over a 30-meter distance,
so it won't join up at the end.
Alex also keeps one eye on the weather forecast.
A wind speed above 23 feet per second could make the truss
swing dangerously during the lift.
We always ensure we pick calm days when we're doing these
lifts, especially the big 70-meter-long ones,
because once you pick something up, you never really want to
have to put it back down again.
When the first calm day arrives,
the crawler crane makes the lift,
and workers with guide ropes carefully walk the first huge
truss section into position.
Steelworkers bolt one end in place, and they fix the other
to a support tower.
The first lift is a success.
Over five months, the team
lifts, guides, and installs the remaining
14 truss sections to complete the roof's support structure.
Alex and the steel team inch down the jacks
on each tower and turn.
The trusses support their own weight for the first time.
And because the team overestimated the number of
days canceled due to wind, Alex can sign off on the lift
operation ahead of schedule.
It was a really good feeling to know
that it's all been finished.
And we're on program,
if not a good few weeks ahead of program.
So God must be an Everton fan, yeah.
The stadium's outline is visible for the first time.
Now the team needs to turn this skeleton
into a fully-fledged sports arena.
In Liverpool, England, engineers are racing
to raise a brand-new stadium for the Everton Football Club.
Architect Dan Meis designs the new arena to blend with
the industrial heritage of the surrounding structures,
like the famous Titanic building
and the tobacco warehouse.
It was very clear to me that this building needed
a sense of history.
It needed the kind of gravity
that a brick building would deliver.
The design encases the stadium in a nearly 60-foot high facade
made up of slender, stand-alone brick piers.
This choice presents a challenge to the engineers
building the stadium.
It would take an army of bricklayers months
to lay 243 courses of bricks in a simple wall
around the stadium.
Laying bricks in short stretches to create the narrow,
perfectly straight piers by hand
would be near impossible.
The team needs a way to lay real bricks,
but with machine-like accuracy and speed.
Their off-site construction factory has
a game-changing solution.
Handmade bricks are cut into half a million thin slices
called brick slips,
each one with a special profile cut into its back.
The factory team follows a preset plan
to lay down each brick
into large, flat molds.
Computer-controlled machinery places a steel reinforcement
cage on top
and fills the mold with concrete
to make one solid panel.
Trucks deliver the panels exactly when needed,
and crane crews bolt them into place
to cover the stadium facade in a fraction of the time
compared to traditional bricklaying.
For 18 months in Worksop, the pre-build team dedicates
one section of the cavernous facility to placing
crate after crate of brick slips.
The key profile on the back of the bricks bonds with
the concrete that automated hoppers pour into each mold.
The first brick panels begin arriving on site,
millimeter-accurate and ready for installation.
So to get that perfect by hand
would have been near on impossible, I think.
So to be able to do stuff like this in factory settings,
it's far safer for people and there's a lot less wastage
for us as well.
The crane crews must handle the panels with care.
The shallow brick slips are more fragile than concrete.
One knock could cause enough damage to render
the entire panel unusable.
Making a replacement will cost time and money.
The design team has a solution.
Special threaded inserts allow the crane team to screw hook
attachments straight into the concrete.
This means no slings or hooks can bump the panel's bricks
as the team lifts it.
It takes the crane team just two-and-a-half hours to install
the first panels after they arrive on site.
Every panel the crew fixes to the outside of the structure
makes the stadium look more like an enclosed building.
On the inside, construction crews start to fit
partition walls and cover over the gaps between the different
parts of the stadium structure.
This sort of paneling has got a small air gap underneath
there between the different elements of the build,
the steel and the concrete.
And it just allows for the way they expand and contract
with the different weather conditions.
The stadium is a series of freestanding structures built
from either concrete or steel.
The flexible rubber strips like this cover gaps and allow
the different sections to expand and contract.
[Alix] There are multiple movement joints around the build,
and fans will just walk straight past it and not
realize the kind of engineering
design that's gone into the finish there.
On the outside, black expansion panels between
the brick sections allow a similar degree of movement.
After 10 months of work, the crane team installs
the last of 745 panels to complete the brick facade.
Architect Dan Meis visits to
see how his vision is taking shape.
It's easy for me to draw some lines and put some red color
on it and say, "It's going to be a giant brick wall."
Then trying to figure out exactly how that gets built
and how it gets built in the sequence of construction,
that's all a very complex thing.
But seeing them in place, it's really incredible.
The brick pier facade echoes the industrial heritage of
Liverpool's docks perfectly.
Now the engineers need to focus on the experience
inside the stadium.
Engineers in Liverpool are building a huge new stadium for
the Everton Football Club.
The stadium's designers want to recreate
the electric atmosphere
of the club's old site, Goodison Park.
The bits that everybody loves about Goodison are what we want
to bring to Bramley-Moore,
about recreating our fortress that is Goodison and making it
a really intimidating place for the away team to come.
The designer's solution is to make the stands the steepest
of any stadium in the country.
To do that, the rise of the steps must increase
the higher they get.
You can just sort of perceive that kind of gentle curve as
you get steeper and steeper up the stadium stand,
by the time you get up to the back of the tier,
you've got quite a big step.
And so the angle at that point
is the steepest part of the whole stadium.
So we've sort of maxed out the regulations in order to
kind of create that particularly imposing atmosphere.
The crews build the terraces from thousands of differently
sized prefabricated concrete components.
They must install each one into its correct place.
It's painstaking work
that takes the team 12 months to complete.
Next, an army of seat fitters descends on the stands
and installs the stadium's 52,000 seats.
The steep, curved stands and the seating close to
the pitch is a key step to creating the intense atmosphere
the fans crave.
The steepness element formed a big part of the design around
creating that fortress.
You can see it from the front row when you look up.
It certainly feels steep from down here, and I'm sure
it's not for the faint-hearted to be on that back row.
But yeah, there's no bad seat in the house,
so anywhere anyone sits in the ground,
they've got a great view of the game.
The stadium's architect, Dan Meis, builds in another
feature to maintain its pressure-cooker atmosphere.
[Dan] What we had talked about from the very beginning
was this cauldron of energy.
So we knew that we needed to keep the roof as tight as
we could on top of the stands that were right on top of
the pitch, because that was going to keep all the sound
in the building.
Dan designs the stadium's roof as a giant curve that reflects
the sounds the fans make back onto the stands.
The design consists of 872 perforated panels
that vary in angle across the structure.
To install them, the construction crew must use
a special crane attachment.
On the end of the crane hook,
the team will hang a long steel beam
with a posable hydraulic mount that clamps onto anchors points
on the cladding panel
and tilts it to its final orientation.
At the opposite end, a sliding counterweight runs
along tracks on the beam.
It balances the load and allows the crew to install each panel
in a single controlled lift.
Driven by this mechanism, the crane repeats the same
precise motion to slot the panels into place
one after another.
The first truckloads of cladding arrive on site
just 18 months before the first game of the season.
Each large panel weighs 550 pounds.
Their flat shape makes them difficult to control
in the strong winds that buffet Liverpool's docks.
Liverpool's quite a windy city anyway, but being right down
on the kind of front face of it, you are really exposed,
so there's no perfect time for doing these lifts.
And we need to get playing in here as soon as possible.
The crane team attaches the first panel,
and adjusts it to the correct angle.
The crane begins the lift
130 feet up towards the stadium roof.
Crane slingers hold on to trailing tag lines
to prevent a collision
and help guide the panel into place.
Over the next six months, the cladding team installs
a further 871 of these panels into place using
their innovative robotic arm.
It completes the challenge just one year
before the stadium's first game.
86,000 square feet of
perforated aluminum wrap around the stadium,
ready to create the cauldron of noise for the first match.
[audience roaring]
Engineers in Liverpool are racing to complete a brand-new
soccer stadium in time for the opening game of the season.
A busy schedule means this site
will often host two games a week.
A 90-minute soccer match inflicts a lot of damage
on a natural grass field.
It's critical that the pitch recovers in time
for the next game.
Head groundsman Jon Howell has a solution.
So, this is a small intersection of what the pitch
would look like underneath.
These tough plastic fibers sit between the organic blades of
grass to knit them together.
[Jon] They reinforce the pitch on a sand-based pitch,
and then we grow the grass in and around the roots attached
to the base of the stitching, and it just holds it together.
The challenge for John and his team
is to turf and stitch more
than 75,000 square feet of playing surface.
Every stitch must be in the right place,
because a gap creates weak points.
The solution is a giant mobile stitching rig.
This machine unspools over 37,000 miles of the plastic
fiber and punches rows of it into to the ground
two inches apart.
After the automated rig is stitched the entire surface,
the organic grass grows through the fibers.
And John has a feel that looks and feels real, but is strong
enough to withstand the punishment
of an entire soccer season.
But the pitch still needs light, heat, and water
to grow quickly.
Liverpool receives plenty of rain, but light and heat
are lacking.
[Jon] New stadiums, they're all unbelievable.
But as a groundsman point of view,
they're not great for growing grass.
We're not going to get much sunlight.
We've had next to nothing in the south.
The north-south orientation of the stadium
and its overhanging roof keeps
the south end of the pitch in the shade
and several degrees cooler than the north end.
This slows grass growth dramatically.
Going into match day, we know the eyes of the world
are watching us now. It's going to be quite tight.
Time's very limited with this weather.
To solve this problem, engineers install 1,240 solar
panels on the southern edge of the stadium roof.
The electricity they generate powers 13 sun lamps to help
the grass grow quickly.
With these rigs, it's twofold. We've got pink LED lights.
I find that's the best for the pitch,
for the root developments and extra light.
And then, the infrared heaters, as they're called.
The team rotates the sun lamps to ensure every area of
the pitch gets precisely the heat and light it needs.
So the grass grows thick and strong for the opening
match of the season.
Engineers turned an unused dock into a solid foundation.
Built upwards with brick at breakneck speed and engineered
steel to create the ultimate match day experience.
To construct a unique stadium
that generations of fans will call home.
It is a legacy to the team that made it.
The stands finally begin to fill with fans
for the first game.
And this historic club begins an exciting new chapter.
I think it'll be quite emotional, actually,
to see 52,000 people in the stands.
Going to be amazing!